Council archive · source document
RFI - Attachment-1-Updated_Proposal_Plan · MCU19/0055
Plans and drawings: the text below has words only, no drawings.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
PROPOSED INTERNAL PERSPECTIVE
* Indicative Image Only
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
Revision Schedule Client Name: Andy & Pamela Pannifex
Sheet Number:11 Project Number:18-076
Revision Number Revision Description Revision Date Issued by Project Address: No. 27 Hill Street, Sunshine Beach
2 PCD 3 28/02/2019 AOW
Climate Zone: 2
3
4
Concept Set 1.1
Development Application
03/03/2019
03/05/2019
BJH
BJH Wind Category: To engineers spec.
Perspectives
Email: [email protected] 1.0
Website: www.iconbuildingdesign.com.au Project Issue Date: 30/06/2019 Project Status: Development Application 1.0 Scale:
5 RFI 1.0 30/06/2019 BJH
Phone: 0488209840 Checked/Signed By Director: Bradley Hunt Drawn By: Aaron Waters QBCC LIC# 126221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment-1-Updated_Proposal_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.