Council archive · source document
Minor Change Existing Approval MCU23 0094 03, OPW23 0113 03 & RAL23 0014 03 (As Published) · RAL23/0014.03
The revised plans are to be provided to Council for review and approval prior to the
issue of Building Approval.
Sustainability
8. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
OPERATIONAL WORKS (OPW23/0113)
General Advisory Notes
9. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
10. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
11. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Nature and Extent of Approval (OPW- Landscaping, Drainage, Stormwater)
12. Deleted.
Prestart, On and Off Maintenance Inspections Request
13. Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days notice of preferred inspection time.
14. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
15. A minimum maintenance period of 12 months will apply to all municipal works and thereafter
until such time as the works are performing in accordance with the approved design unless
noted otherwise.
16. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
17. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
Page 27 of 31
Document Set ID: 24843802
Version: 3, Version Date: 11/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU23 0094 03, OPW23 0113 03 & RAL23 0014 03 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU23 0094 03, OPW23 0113 03 & RAL23 0014 03 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU23 0094 03, OPW23 0113 03 & RAL23 0014 03 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 265 KB (small file)
- File type
No other editions are linked here.