ENGINEERING
External Works
42. Toolar Street must be upgraded for the length of the frontage to the subject site. The works
must include, in particular:
a. Construction of a pedestrian concrete footpath in accordance with the conditions of this
Decision Notice; and
b. Removal of the existing property access, any redundant pram ramps and reinstatement
of the kerb, footpath and verge area to match the balance of the site frontage, including
the provision of topsoil and turf where the existing verge is grassed.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
43. Moorindil Street must be upgraded for the length of the frontage to the subject site. The
works must include, in particular, construction of a pedestrian concrete footpath in
accordance with the conditions of this Decision Notice.
This condition is imposed pursuant to s128 of the Planning Act 2016 being trunk
infrastructure.
Site Access and Driveways
44. A sealed access driveway must be provided from Toolar Street to all parking and
manoeuvring areas of the development. The works must include in particular a driveway
crossover generally in accordance with Council’s Standard Drawings RS-049 and RS-050
and any associated addendums.
45. The vehicle access driveway must be constructed to levels and grades that ensure that
vehicles do not scrap or bottom out on the driveway or road pavement when entering and
exiting the site.
Car Parking
46. A minimum of eight car parking spaces must be provided and marked on the site. The works
must include, in particular:
a. two visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use; and
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Pedestrian Facilities
47. Pedestrian facilities must be provided for the development. The works must include a 2.0
metre wide concrete footpath within the road verge for the entire length of the site’s frontage
to Toolar Street, with the width varied, where necessary, and at an absolute minimum width
of 1.8 metres. The final alignment of the pathway, pram ramps locations and footpath width
will be determined in the final design of the footpath for the operational works.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
48. Pedestrian facilities must be provided for the development. The works must include:
a. a 2.0 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Moorindil Street, with the width varied, where necessary, and at an
absolute minimum width of 1.8 metres; and
b. a pram ramp connecting the footpath to the road formation in Toolar Street.
The final alignment of the pathway, pram ramps locations and footpath width will be
determined in the final design of the footpath for the operational works.
Page 7 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice MCU20 0071Related documentApplication case desk ↗
About this file
- File size
- 352 KB (small file)
- File type
No other editions are linked here.