2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFigure 4: Condition of Stormwater CCTV inspected assets by Number of Assets
Stormwater Infrastructure Operations & Maintenance Plan
Operational and maintenance activities are fundamental for the ongoing management of the
Stormwater Infrastructure; it is considered an investment rather than a liability. The Stormwater
Infrastructure assets rely on operational and maintenance costs for the serviceability of the assets
identified in this plan. These activities are a significant annual investment that directly influence the
potential for Stormwater Infrastructure assets to reach its intended service life. The ongoing
development of asset knowledge through asset inspections, improved maintenance activities,
subsequent defect monitoring and repairs are fundamental in developing sustainable intervention
levels for renewals and replacement of Stormwater Infrastructure assets.
Budget Forecast Forecast Forecast Forecast
Year 2018/19 2019/20 2020/21 2021/22 2022/23
O&M $ 3,462,072 $3,531,313 $3,601,939 $3,673,978 $3,747,458
Forecast Forecast Forecast Forecast Forecast Forecast
Year 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29
O&M $3,822,407 $3,898,855 $3,976,832 $4,056,369 $4,137,496 $4,220,246
Table 2: Annual Operational & Maintenance Costs by Asset Group
Maintenance and operational costs are identified to ensure council understands the whole of life
costs associated with the day-to-day management of Stormwater Infrastructure assets. The figure
below identifies the long term financial commitment required in maintaining assets. In order to
maintain assets to an acceptable level, the cumulative investment over a ten-year period will equate
to $42m. It is proposed to develop a more detailed list of operational and maintenance activities per
annum by asset class and utilise the T1 asset management system to identify maintenance by the
breakdown of asset classes within the Stormwater Infrastructure asset classes. In addition, more
detailed and longer term planning for maintenance has been identified as an improvement from this
AMP.
Asset Management Plan: Stormwater Infrastructure Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.