Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
As the Stormwater Infrastructure assets age, continued condition assessments are required to
monitor the assets and produce more defined renewal plans. The graph below enables Council to
identify and plan for these significant renewal activities for the next 10 years.




Figure 7: Stormwater Infrastructure Asset Renewal Costs


The above graph identifies the future investment required in renewing Stormwater Infrastructure over
a 10-year period. The development of detailed renewal programs for all stormwater assets will result
in the completion of asset condition assessments. Projects currently identified have been listed in
Annex D and is reflected in the development of Council’s future 10-year Capital Works Program.



       Capital Upgrades and New Assets
There is a need to develop more maturity in the overall assessment and management of our
Stormwater Infrastructure assets before there is a consideration for further upgrades and expansion
of the Stormwater Infrastructure assets. The modelling of increased tides, rising sea levels,
increased storm intensities and other factors relating to climate change must be considered in future
modelling when upgrading or constructing major stormwater infrastructure.

In summary, the demand drivers highlighted in section 3.1 will dictate the development of capital
upgrade and new stormwater infrastructure in the future.



       Capitalisation of Assets
All new and renewed assets will be acquired and commissioned in accordance with the Noosa
Council Capital Delivery Framework.



Asset Management Plan: Stormwater Infrastructure                                             Page 14
Log in to download the original file

2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan(PDF, 1MB).pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.