Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       Monitoring and Review Processes for the Asset Management Plan
This first edition of AMP for the Stormwater Infrastructure refers to current levels of service that have
existed over recent years. This AMP is to be a ‘living’ document reflecting actual practices used in
managing the Stormwater Infrastructure. In accordance with this, Council will balance cost, risk and
performance needs for the Stormwater Infrastructure.

The AMP will have a high-level annual review for developing the annual budget from the
maintenance and renewal plans. A full document review will occur on a three-year cycle, in line with
the completion of detailed condition assessments and the financial asset revaluation of the
Stormwater Infrastructure assets.


       Asset Management Effectiveness
The effectiveness of this AMP will be measured in terms of:
1.   Adoption of the Stormwater Infrastructure AMP by Council.
2.   The ongoing development of good asset knowledge through a commitment to recording
     information against assets and undertaking cyclic condition assessments at the facility.
3.   Maintenance and renewal plans that are robust and initiate the annual budget process.
4.   Historical asset activities that are recorded and located in Council’s asset management
     system.
5.   Limited reactive work and more planned maintenance activities.
6.   The Stormwater Infrastructure AMP becomes the reference point for all information and
     enables good decision making for asset related activities and investments.




Asset Management Plan: Stormwater Infrastructure                                                Page 20
Log in to download the original file

2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan(PDF, 1MB).pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.