Council archive · source document
Development Application Part 1 of 2 - IDAS Forms 1 and 23 and Covering Letter - OPW13/0816
Pl,re B"wd,h,re 1 ~1~1!rli~I[lilfl ~IIiI I~r
X0030303
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
i*lecktist \ Part ~ofl./ r ~J.DI
(Please Circle)
fO~:
_ -’
Application number: QQ\J\A)\ O~l~
T:U&AM\BCS IAMlINFORMATION MANAGEMENT\RECORDS MANAGEMEN1\Control of RecordslEDRMSlMulti Part Record Co\’er Sheet FIRST PART.d
Development Counter
.
....
: 11 OCT 2013 ...:~~/
~..’,’ ;
’;’. .:’:’;.’ ’~,~~1’,
Tewant\n.’
-=’"
_a__._
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
.:.:t:::;::’::~:~:~.:.::}::;~V:;:~~:t:;:;:;::.:-;:;:~:;:;:;g;g;:;:;:;.;~.;~~.:< ..........:;::... .........................:::....
{:;:~:;:;;}f;:~:~:}~:;:;~~:;:;:; :;:;:;~:;:;:;:~#:;:;:;;; "’::’:’:’::::::’:~ {:’ik Department of State Developrnent, lnfrastructure and Planning ;~;;:;:;};~:;:;:;:;::::~:::
I DAS form 1!<"-..W;o’...w.~}.;.....:~~~ J’’’)f...j ~ ~ ~..,;(::::1. t~i (..J ~ (jt:3~t.[1i 1.~:3 " << ""
’::"::, ~’’’’’’’ ~/""""" ~ <. /"’, /".".(.,’7:: /N" Y""
~
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
.
complete this form (IDASform I-Application details)
.
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application. _
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA)or the Sustainable
Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.aulMyDAS
I Mandatory requirements
Applicanf etalls (Note:,the 3, plcant isth per~ nresp nsJble form~kin.g theapplicati n and need not betheoWh~t
of the. hind.Th appl can~ isrepp,po$ blefor nSutlng the lrJfortn~!iQn provide OI;l alUDAs.appHcat onforms is cori" ct.
Any developmentpermit or pr liminaryappr val that maybe IssUed as .ac nsequehce of thisapplcation will be iSsued ....
to the applicant)
.
Name/s (individual or company name in full) I Norden Engineering Pty Ltd
For companies, contact name IJohn Norden
Postal address POBox 205
Suburb Tewantin
State Qld 1 Postcode 14565
Country Australia
Contact phone number 10754497137
Mobile number (non-mandatory requirement) 10412536911
Fax number (non-mandatory requirement) 10754497172
Great state. Great opportunity.
;~~~..:: ~;"H;"m::~.;u~~n,~~~~/~,~~<?~..~~~~;~~;;;;;~;~/~;;’.;’.;;;;.:~’.~ ’/~,’’.; ~ ;~~,;~"~/’::;U~::;~::;’:’: N::..~,/~~:,~~~~~~:;~~:.::::~~::;:.~~;~~~}:.,~;~~~:~;g:~:~~~f: ~~~~~f:~~~~~~~~~N~~~f:mf:f:~J~f:%f:~~~~M ~f:~m~f:%f~~~: t ~N~jmNNm~~f:N#~~t:~~f:~%f:~~ N~~~NNf:NmNNffj; ~:~:tf:Mft;g
Page 3
mmm~mmmmmmm~mmmmmwnmm~mmmmmmmmwmmmmmmmmmmmmmmmmwmmmmmmmmmmmmmwmm~m~mm::mmmmmwmmmmmmm~mmmmmmmmnmmmmmmmmmmmmmmmmm~mmmmmmmmmmmmmmw
Ema address (non-mandatory requirement)
I j~ [email protected]
Applicant’s reference number (non-mandatory
requirement) 113/98
1. Whati$t~enatu~eofthe development proposeclaF1d wh~t typt:t6fappro’(al i$belngsoug~J?
.
"-;. .. . .
’.:’-:,’ .... .,
;";"." ’,:’, ,,^:-’:’.’:... ’-:: .
..;.:, .c.;.
.
.
,
-
.
.’,’.."
.
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
o Material change of use 0Reconfiguring a lot 0Building work ~ Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval o Preliminary approval fa Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
Restoration works and stabilisation works within a tidal zone
d) What is the level of assessment? (Please only tick one box.)
o Impact assessment fa Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Table C-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
o Material change of use 0Reconfiguring a lot 0Building work 0Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval o Preliminary approval o Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
appUcable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
o Impact assessment 0Code assessment
Table C-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
o Refer attached schedule 0Not required
IDAS form "/.......’,j;:;;:;fi;a:";:~ ,;";’1id;;
:;::,,?’,y:’:~’;’:;(~ ’:: () ~ ~!ui;.. ;’:(.: f ~1
~’m~::~~mmmfm;:~;:~n;:3m:~3m~:~::~m~mmmmi:;:;:~~:~Nm~htm~~~mmmm~~m~mm~~m~ m:tmmm3m;~m~mmmm~m~Y:mmtN~:~:;:~~t~M~mA~;:::~::~;:r~~mm~mm~;:;:;~;~~n~~~mrm/:;:~~ .~......;.",..~~~~~, ::;:~mm::~m::;:::mr~k~ m~:~m~;:;g;~::~:&Amxr:m~::~;.;:mm;:;:~m;:;:~m~:~;:tt~:~:i}
Page 4
mmmmmmmmmmmmm~mmmmm~mmmmm::mmmm::mmmmmmmmmwmmmmmmmmmmmmmmmmwmm~wwmm~mmmmmm~mm~m::m~mmmmmmmmm~mmmmmmm{:mmmmmmmmmmm::~mmmm{:mmmm!.mmmmmWJ?:mm~;:
.
<2. ..;Loc~t o.,~t! ~.;Pt mj$$$(GOm let~l bl o and/or Tablet;;~m .
P JicabJe.ld~t1t fY~~ JQtin a separate ro"Y~)
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note:this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
o Street address and lot on plan (All lots must be listed.)
Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/ locality name code and plan no.
i) 25 Dolphin Cres, Noosaville 4566 80 N10573 Sunshine Coast
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note:place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
o GDA94
o WGS84
o other
,3. TO!3J area OfJh~)pr l$eSOn Whlct,1
t~ developmB"t Is prop s (indicate square metres)
4~Currehtu.~I$ of (hepremi$E!s (e.g.vacant land, house; ~partment bu dinQ,caneJarm etc.)
,
:’,~:’,’ .
’.:.:. .:.:.’.. -’ :"
’,’_,’,.:, ,",’, ... ..’. < ,’’:, ’_:.: .
’_;
’. .
’1_"’ ..
:
.. -’_" ,’". , "
..:"
.
Inatural creek
IDAS form i-.....::L:)p:::~-;}.},’);":. ,;",’iai!.)
’.
"’~’~::::~;’:){~ .:1 a
~~~;~::t::~;~::::~3;;~;;~t~r:~;~~:~::::}:;;’:’::::~.:.::;:~::~t:::t:~::::}::;::~;:: :;K:)~~~r;;:::i;:;:::~~;:;:~ :::~:::m~;:~~ ;:::~:~:~::~:;:m::~::;:::~mmmm :::m~m~~::.:} m r:f}} :;:::::}~K:::m3itt:~:: m:::::::.:;:.~;::.~::::::::~::: :;:L:(t:::;:::; .:.:.:.:::::::~~::;::::;:i~r:;;.::~::::::~~::::; ;::::::~; :~~;:.:::::.::: :.;.-..:.~ ::::;:}::::m~m~: t:t::::::;~::::,::::::: :;}( ::\t:::{ ;{:::}~S:::::
Page 5
mmmmmmmmmmmmmwmmmmmmmmmmm:=~wmmmmmm~mnmmmmmmmm::mmmmmmwmmmmmm~mmmmm~wmmnmmmmw~mnm::wwm~m::m~m~:mmmmmmmmmwmmmmm~~mmmmmmwmmm~mmmmmmnmmwmm;
5. Aretbere any .~lif;~ntapprQva:l$ (e.g.apr limlnary aPproval) $$o iated with,th $~Ppl c~tjQn? {Non- .
.
.’
.
mandatoruequ eitl nt) "i",
o No o Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is owner’s consent required for this application? (Refer to not s at the end of this form for more information.)
o No
Yes-complete either Table F, Table G or Table H as applicable
Table F
Name of owner/s of the land
l!We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table G
Name of owner/s of the land I Graham & Karen Whyte
The owner’s written consent is attached or will be provided separately to the assessment manager.
Table H
Name of owner/s of the land I
o By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
7. Identify if any of the .following apply to the premises (Tick applicable box/es.)
Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal}-complete Table I
o On strategic port land under the Transport Infrastructure Act 1994-complete Table J
o In a tidal water area-complete Table K
o On Brisbane core port land under the Transport Infrastructure Act 1994 (Notable requires completion.)
o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Table I
Name of water body, watercourse or aquifer
Weyba Creek
Table J
Lot on plan description for strategic port land Port authority tor the lot
IDAS form -;....../~;:;):’i:~.,:J.,:/:. d~;;f(~:’:;:;;
~. ..... ’"
:;::...~..:.:::::.;’:.::r: .:~::) .~’.:. ,: .,’:’
~~mm~~mmmmmmm:inmmmtmmmm~mmmmmmnmmmM~m~nmmmr:m::::~:~mnmmmm~mmmrt~ ;:::;:;m::mmnmmmm~tm~,::j:t}; :m\t~!.~t:;: ::;?=~~);:;;;:;::::::::;::: ,""-’;;::~A~;;;;";~""’:~rxn>’:’: .:.:.::::;:;:::: ;~:m;:~;:::;:mmm:;mtmmm:::{::~.:;:::::.: .~::::::.,;:::::y; :ir=:::i:;:i;:;:::::::i:;:;
Page 6
mmmmmmmmnmmmmwmmmwmmmmmmmnmmmmmmmmmmmm~mmmmmmm~mmmmmwmmmmmmmmmw::mm::mmmmm::nmmmmmmmmmm~mmmmmmmmmmmmmm~~mmmmmmmmnmmmmmmmmmmmm::mmm~
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
Sunshine Coast Council
.
8. Meth.ere ~hyexi$tii’lg easements on the premises? (e,g.for vehicular access, electricity, overland flow,
water ete)
No 0 Yes-ensure the type, location and dimension of each easement is included in the plans submitted
9. Does tbe’proposalincludenew building Work or operational work on thepremjses? (Including any
services)’
....
o No Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
10.h~.thepaytnent fapprtable long :~,rv.iC leave JevyappUcabJe to thisaPP.litatlon? (Refer to notes at the
’end of this form for more information:)
No-go to question 12 DYes
11. Has the ,portable long service ,leave levy been paid? (Refer to notes at the end of this form for more
information.)
o No
o Yes-complete Table L and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6 digit number
(dd/mmlyy) starting with A, 8, E, L or P)
12. Has the :Iocalgovemmentagreed to apply a superseded plannins scheme toth s application under
section 96 of the Sustainab/ Planning Act 20091
~ No
D Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
/DAS form ’1 .../pp;\;-..~}..~;..:. ),..ii ;
::~’. ’,:~:::~;:)i": ..:: () ,~::(: ,r ~:~
::~r:::~:t~};}}}:~;i\:}~ ,:;:;:::::~:;::m;’:’~-:::3~;;:;:}~~::::;;":;:,:;,’:~"..}i; :iti: :::r~ ~~:i::;::m;t::~i::;:~;:;::::;~;::::.;;
.
-.-.’.-.’;:.’,
.
....
-:;;~:.~.:~3::;_:. ::;::::::;:::::::m~}~::::::: ;:.:.:;;::/tm;;:~:}::~:: ::.:::-::-:; ;:;:;:imri:i::::::; ......:.:’:.:’:-:-:.:::::::}~;:);:)\:::: :~;:r:t:;:~::~;:t:;m::::}r:3t~~N~t ;::r~;:::mrt~:: :-;-::’:.:-::-;.;-:iV:.;.;.:.:.; .;:;:::~{::;:;:;:’: ::;"; ::.:.:3;~}:::;::}::; :::::;:::~;’:’
Page 7
mmmmmmmmmmmmmmmmnmmmmn::mmmm~mmmmm::~mmmmmmmmm~mmm~wmmmmm~/:mmmmmmmmmmmmmmmmmmm~m~m(:mmmmmm~mmmmmmmmmm~mmmmmmmmm~mmmmmmmmmmmmmmmmmmmm~
. 13.. List below all of the forms Mdsupportng :informati. n that aepqmpanY this applieation (Jnclude all lDAS
jorms,checJdis1s,mand tpiy:suPPori ng information et~Llh, tv"UlbeC.siJ rrijtted as part ofJhis pP/ catign.f:.jote:
.
this question does not apply for applications made online l,lsinfj\ty1yDAS)’
....
......
.....
Description of attachment or title of attachment Method of lodgement to
assessment manager
IDAS Fonn 23 By hand
Drawnigs J831 -
1, 2 & 3 prepared by Norden Engineering By hand
Authorisation notice signed by Owners By hand
114: .Applicant’s declaration
By making this application, I declare that all information in this application is true and correct (Note:it is unlawful to
provide false or misleading information)
Notes for completing this form
Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1 )(c) of the
Sustainable Planning Act 2009
Applicant details
Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 11
The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS form ’J.......’\:~;:;;;:~...}/,<:;:, :;!,;,W;i.;;
~~"’’’.:’’,Y:.:’’’’~;’i): ’: ~1 i) ’.
~.iJ::> ;:(:;~’i:
}::::::~::;:~n;:::t::;~:J::::~:’~~’.-.~"","n ;:;::i:;:{}::im: ;::~ ;::;;:::r:~~:; :N::f :.:;:~~mm);m~;.~;:~;:,-:~:>::::,~;:; :::::~::::::~%’f.~::~ ::::::~~;:i:~::}:;;::::: :;:;::::::::m::~~mm(:}):;:~ ;:::~tn::~m~;:::~mn~::::::n::\:i .:~::;;;:::~::~::~; ::.:.:; ::;:F~::::~>:..,.::::~:::t :i;tm;i:ti\i;i:ir:i:i: :::;;::::;:~~: :::::::;:}:;::;~m :i:i:i:::i:i:i:i{iti:i:i:’i;:::i:::;: i{i:::i:t:::i:i:;:::::;::::’;-:
Page 8
mmmnmmmmwmmmmm~mmmmmmmmm~mmm~nmmmmm::mm~m~mmmmm::mmmwmmmmmmmmmmmmmmmmmmmmmmm::mm~mmmmnmwmmm~mmmmmmmm~mm~mmmm~mmmmmmmmmmmmmmmm~wmmmm~m~
Question 12
The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave)Act 1991 requires the levy to be paid before a development
permit is issued.
Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from Qleave, or can be completed on the Qleave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP),assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
I Council. I have been engaged as the private certifier for the
building work referred to in this application
BSA Certification license Building
Date of engagement Name
number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Nam e of officer
QLeave project Amount paid form sighted by
Description of the work number
Date paid who sighted the
($) assessment
form
manaqer
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
tel 13 QGOV (1374 68)
[email protected] IDAS form ./ ..../~Pi:;h;.;.~j,. ;.:. J;’ih’\;
:..~~.:..:~~:...~;.:)r; .:1 ().. :! ~ju!y .{:(:;.::~;
www.dsdlp.qld.gov.au
mmm~m~mm~mmmm~~mm~mmmmm~m~mmmm~::~~~m~~mm~~mm~~~~mm :m::~mm~mm~wmmmm::~/u::;~m~mm~~~~m~mm~~mm;~;~~~~;}::~~::;;~mm~mt~:::?~m:;~~;t~mm~mmm~mmj~~~mmmmm;;/::::;;:~::mr;;~:~;mmm::~m~~mmm~mm~::: };m~:::;::;:~::mm~::}:};: ::X
Page 9
’oJ
-"
.:~:~:~~ ............................:.:.:.:.
:}~:}~:~:~:~ :;:~:~:~t:}~:t:;:~t;t ::::;:-:; :’:::;:;:;:;::_::::::::::::::::::::::::::::;:::::::::::::::::;:::::::::::::::; {:~:::::::?"" ’~~X:::";’:~}}~~~~::~ Departrnent of State Developrnent, Infrastruc.ture and Planning ~:~::’t~:~’:::’
IDAS form 23.....:.:-:...:...:.."’..[U;; ~ :;
~~’’’’’l;
clt
.
,
r~~(;3 .c;:;,
\t~l() (~J EJ\/:r.:: l \r~ iif. l("’~ f r"’~
;~:~t t3t:(::::l. I
(~:~ () 21r’~1 ;;’1. (~1 (}~(r’] i ~:3tri c:;’.~t ~~:)
’hN~
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for:
operational work that is tidal works (including prescribed tidal works) or operational work within a coastal
management district (mentioned in the Sustainable Planning Regulation 2009, schedule 7,table 2, item 13)
material change of use that requires referral under the Sustainable Planning Regulation 2009, schedule 7,table 3,
item 5 because it involves:
-
operational work carried out completely or partly in a coastal management district; or
-
building work carried out completely or partly in a coastal management district that is the construction of a new
premises with a gross floor area (GFA)of at least 1 000m2 or the enlargement of the GFA of an existing
premises by more than 1000m2
reconfiguring a lot that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 2, item
14 because the land is situated completely or partly in a coastal management district or the reconfiguration is in
connection with the construction of a canal
building work that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 1, item 11
because it is on land completely or partly seaward of a coastal building line.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
Notes for completing this form
For all development applications you must:
complete IDAS form 1-Application details
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Coastal Management and Protection Act 1995, the Coastal
Protection and Management Regulation 2003, the Sustainable Planning Act 2009 (SPA)or the Sustainable Planning
Regulation 2009.
This form can also be completed online using MyDAS at www.dsdip.qld.gov.aulMyDAS
I Mandatory requirements
1. Confirmlhe following mandatotyrequ rements accompany .
Confirmation of Method of
.
’" .this application lodgement :Iodgement
Written description of the proposal, including a report that addresses any 0 Confirmed By hand
relevant policies.
2. What jsthe nature -of the work or development proposed by the application? (Tick all applicable boxes.)
o Operational work-complete table A D Material Change of Us~complete table B
o Reconfiguring a lot-complete table C D Building Work-complete table 0
Great stat~. Gr~at opportun ty.
QU<l Mitand
~h ~i~~~ttmmm~:~m~n~nnmmmmm~nu mm~~ m ~~m~~tw~nn~~~w~~i;~~~~~~;’;~~;;’l in k1m~~:;;.~~:~;’;:;~~.;:;:;::~; h:;~::::~~ ;;;;1~~k:;~rmwm:mmmm~n1nummn nm:;%n ~::m::::~::::~~~~~;~;~~~~m~~;~;:::: ::.:::::m~~~ ~;~:g:;~ttmt? Gc:vernOlent u:~:tm~)~):~:~.
Page 10
m~mmmmmm~m~mmmmmmmmm~m~mmmmmmmmmmwmmmmmmmmmmmmmmmm~mmm~~m~mmmmmmmmm~mm~m~m~;:~m~nnmnmwmmmwmmmmmmmmmmwmm~mmmmmmmmmmmnmmmmmmmmmmmmmmmmn:
TabJe A-Operational Work
Does the operational work involve the following? (Tick all applicable boxes.)
a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and the reclamation of land under tidal water)?
D No oYes
If yes, what is the purpose?
I Rock stabilisation and re-instatement of concrete revetment wall I
o Private purpose (e.g.private pontoon)
D Another purpose (e.g.commercial marina)
Does the tidal works also require resource allocation under the Coastal Protection and Management Act 19957
0No DYes
If applicable what is the estimated value of the proposed works?
I I
b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
parks or unallocated state land) on state coastal land above high-water mark.
o No DYes
If yes, which of the following?
D Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.
D For purposes directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.
D For other purposes (please state below).
I
If applicable what is the estimated value of the proposed works?
I
c) Disposing of dredge spoil or other solid waste material in tidal water?
o No DYes
If applicable what is the estimated value of the proposed works?
I I
d) Constructing an artificial waterway?
o No DYes
If applicable what is the length of the waterway?
1 I
e) Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
vegetation on freehold and leasehold land)?
o No DYes
If applicable what is the estimated value of the proposed works?
I I
IDAS form 23,-,.;id,~i ;.,",,’,."::’ .’,; ,e d,,>v,,;(>r.,:; ;8’): ;.:;-i[.’;;,)
{’,.Yi’,:~,~:!~:~{ :;-;’:P:’:,(l:;::’:: )H:~/ :’;:{:~/;’7:;:,:’,:::
\;~;:rs;~):’~ ~~; (>, f ..i’U:’~1 2012;
mmmmmmnm~mmmm~mmmmmmm~mmmwmmmmm~mmnmm~m~~mmmmmmmmmmmmmmmmmmmmmmmmmmwnmmmmmmm~mmmmmmmmmmmmmmmm~mmm~mmmmmmmmnmmmm:.mmmmmmm~mmmmm:.mnmw
Page 11
.
~mmm~mm~mmnmmmmm~m~mmmmm::m~mmm~m~mmmmm?:~~?:~mmm~mmm~mmm.mmmmmmmmmmmmmmmmm~~mmmmmmummm~mmmmm~mmmmmmmmmmm~~m~mmmmm~mmm~~mmm~mmm~mmmmmmmmm~?:mmmmm~:
I Table B-Material change of use
a) Does the material change of use involve the following? (Tick all applicable boxes.)
oOperational work carried out completely or partly in a coastal management district
b) Does the material change of use involve building work carried out completely or partly in a coastal management
district that is:
othe construction of new premises with a gross floor area of at least 1000 m2
othe enlargement of the gross floor area of existing premises by more than 1000 1112
Table C-Reconfiguring a lot
a) Does the reconfiguring a lot involve the following? (Tick all applicable boxes.)
o Land situated completely or partly in a coastal management district
oThe construction of a canal
b) How many lots will be created?
I
Table D-Building work
a) Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection
and Management Act 1995?
No DYes
3.1& the tidal works located w.ithin a local government tidal area? (Tick all applicable boxes)
o No 0Yes-provide details below
Local government: S 0hd"I’’’’e. ~C\J+- GCJ nc(’
I Mandatory supporting information
4. Please prov,ide the following information Confirmation of Method of
lodgement lodgement ,
For all applications
A statement addressing the relevant part(s) of the State Development D Confirmed
Assessment Provisions (SOAP).
0Not applicable
For applications involving operational work that is tidal works
A copy of the certificate of title for the land (including tidal land) that 0Confirmed By hand
would abut or adjoin the proposed works.
0Not applicable
Plans showing: Confirmed By hand
. the real property description and boundaries of the land (including D Not applicable
tidal land) that would abut or adjoin the proposed works
. the proposed works (including existing works to be removed) in
relation to relevant tidal planes (e.g. mean high water springs)
. the slope angles of the beds and banks of the tidal area and the
finished levels of the proposed works.
For tidal work that will occupy a navigable waterway provide a water 0Confirmed By hand
allocation area plan providing evidence that the proposed work will not
0Not applicable
prejudice the access rights of adjoining property owners.
IOAS form 23...-r;,:;,.’;; ;:,’D>.>,;:’ .’j;~(;’ <:i,,>,/~;(>r~{,~e’;! ,.f[.’,;,,
~~"(:;3.:::[af ;T;;Ir:.;j{g~:::’l";~;’";{ ~";~:=,:;/:’"/~:::~::
:...;~?!~S;~)~~ .:~J O. ~ -:;’~::j~ ?("; f?:
~~mmmmmmwmmm~mmnmmmmmmmmnmmm~mmmmmmmmmmmmmmmnnnmmmmmmmmmmmm~t:mmmmmmmmmmm~mmmwmmmm~mmmmmmmmmmmmm~;:m~mmmmmmmwmmmm;~mm~~~mwmm~mmm~mm~mmm~;:
Page 12
J-
..
~mmmmm~mmmmmm~mm~mm~~m~mmm~mm~mmmmm::mmmmmm~~mmmmm.~~~~~mm~mmmmmmm::mmmmmmmmmwm~~mmmmm~~~mm~mm-~,:,:~~~~,:~~~~~~mmmmmm~mmm~~mmmm~~,:!:~~~m~’:~1:.~~mmm~mmmm~mmmmmm~mmm~mmm~:
Details of the largest vessel, if any, to be moored at the structure. D Confirmed
0Not applicable
For prescribed tidal works, details of how the proposed work addresses Confirmed By hand
the JDAS code for prescribed tidal work in the Coastal Protection and
D Not applicable
Management Regulation 2003, schedule 4A.
If applcable, certification that the design of tidal works is suitable for Confirmed By hand
intended use, signed by a Registered Professional Engineer of
D Not applicable
Queensland (or equivalent).
For applications involving material change of use
Plans certified by a registered professional engineer of Queensland D Confirmed
(RPEQ)or a registered surveyor showing: D Not applicable
. the real property description and boundaries of the land
. the proposed works in relation to the location of the coastal
management district and coastal hazards.
For applications involving reconfiguring a lot
Plans certified by a registered surveyor showing: D Confirmed
. the real property description and boundaries of the land 0Not applicable
. The location of the coastal management district and coastal hazards
in relation to the land being reconfigured
.
Any land being surrendered as a separate lot on the plan of
subdivision.
For applications involving building works seaward of a coastal building line
Plans certified by a registered professional engineer of Queensland D Confirmed
(RPEQ): D Not applicable
. the real property description and boundaries of the land
. the proposed works in relation to the location of the coastal building
line.
Notes for completing this form
Please ensure all applicable fees are paid, noting that referral agency fees are to be paid to the Department of
Environment and Heritage Protection.
For an application requiring referral to the Department of Transport and Main Roads (DTMR),it is recommended
that the applicant contact DTMR to ensure that required information for assessment of the application is provided.
Privacy-Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
IDAS form 23---.f;,,:fdi ;.~’O~;’.,O ;:i;,(! d,,’v,,’kpn)(i’;)! ;."/ ;;)
tel 13 QGOV (137468)
~;’1;~.:~.~:U:.{ {n;;fr~~!g:;::’:=::~:n{ ~F:;.{(::;’:.5;
[email protected] \~.~.~"?’S;~)!~ ~~; :}.. ~ ,.;.:~:’;’ 2(;f ~~’
www.dsdlp.qld.gov.au
m~mm~mm~m(:f0W~~~tm$.rmmmm~~~;tm~1:I;:mmm::~:m::::m~~m~mmmmmm~m~:mw~r~:m~~::~::~~mm~m~~~~m~::mm::mmm~~~~:}:~~;:~~~~}:~;:~mm::~\%t?:::~:}:mmm~m:;::~::;:::mm:~:m::::::::::::mm~mm;:m~:~:::~:t.::::::t:.::mmmmmmmmm~::~~~%~~.::.::m~?f.:::::;::~~~mr:::::~mm~::.::mw~~:
Page 13
RABRlNK PlY LlD trading as
John~ en
October 21, 2013 &Associates
our ref: 13/98 Strudurall Civil Design Engineers
ABN 47 312 012 117
Engineering and Environment Assessment Branch John Norden
Sunshine Coast Council CPEng, .,IE Aust, RPEQ
Locked Bag 72
Sunshine Coast mail Centre, Qld 4558
Attention : Mark Lewis
Dear Sir,
Re: PROPOSED RESTORATION WORKS IN WEYBA CREEK AT 25 DOLPHIN
CRES, NOOSAVILLE FOR G & K WHYTE
Please find attached an application for operational works within a tidal zone. Could
this please receive your urgent attention as the erosion is continuing to invade into
the property even though a temporary concrete wall has been installed to resist the
erosion.
The design is based on an investigation and report by Soil Surveys & Engineering
(copy attached).
An application has also been sent to the Department of State Development,
Infrastructure and Planning. They have already stated that they will forward the
application on to any agency that they believe has an interest in the proposed works.
Please contact me if you require any further information
n\e{
co
~en\
hn A Norden
CP Eng; MIE Aust; RPEQ
Oe\le\O? ’1;"
nr’ l~\J ,
.
\\~\
1.\ \)V \\~)
\’ e’f’Ja\\\\n
,
f’
Suite 16, Tewantin Plaza tel 07 54497137
113 Poinciana Avenue Tewantin fax 07 5449 7172
PO Box 205 Tewantin Q. 4565 [email protected]
Used in these records
Development Application Part 1 of 2 - IDAS Forms 1 and 23 and Covering Letter - OPW13/0816Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.