Original source · versioned page text
2020036-OPW Rev A
Attached to the e-mail Operational Works Application OPW20/0021- DA Form 1- Cover Letter - Engineering Plans - Owners Consent - 17 Cloudsley St Noosaville.
Centreline Data
X = 253.692 -2.56%
Centreline Data Y = 152.906
X = 258.692 Z = 2.054
Y = 152.918 -1.06% 1 in -6 DATUM RL 0.500
Z = 1.573
DATUM RL 0.500
2.054
1.926
DESIGN
1.348
1.573
1.520
1.221
DESIGN
1.448
1.414
SURVEY
1.348
1.334
1.231
1.221
SURVEY
0.000
5.007
OFFSET
-1%
-0.903
Centreline Data
0.000
4.998
6.792
OFFSET
CHAINAGE 9 X = 249.550
Y = 152.895
Z = 2.650
CHAINAGE 4
DATUM RL 0.500
Centreline Data
X = 254.692
Centreline Data -2.41%
2.650
2.600
Y = 152.908 DESIGN
X = 259.692
Z = 1.886
Y = 152.920 -1.06% 1 in -6
Z = 1.548 DATUM RL 0.500
1.464
1.478
SURVEY
DATUM RL 0.500
1.886
1.765
DESIGN
1.352
1.548
1.495
1.159
DESIGN
0.000
5.000
OFFSET
1.428
1.391
1.352 SURVEY
1.343
1.168
1.159
SURVEY CHAINAGE 13.142
0.000
5.005
OFFSET
-0.785
0.000
4.997
7.017
OFFSET
CHAINAGE 8 Centreline Data -0.22%
CHAINAGE 3 X = 250.692
Y = 152.898
Centreline Data Z = 2.536
Centreline Data X = 255.692 DATUM RL 0.500
-1.65%
X = 260.692 Y = 152.911 1 in -4 1 in -6
Y = 152.923 -1.06% 1 in -6 Z = 1.728
2.536
2.525
Z = 1.523 DESIGN
DATUM RL 0.500
DATUM RL 0.500
1.389
1.728
1.646
1.333
DESIGN
1.492
1.495
SURVEY
1.371
1.523
1.470
1.266
DESIGN
1.389
1.406
1.339
1.333
SURVEY
0.000
5.012
OFFSET
1.371
1.365
1.275
1.266
SURVEY
-1.359
CHAINAGE 12
0.000
5.004
6.883
OFFSET
-0.609
0.000
4.995
6.217
OFFSET
CHAINAGE 7
CHAINAGE 2 Centreline Data -0.83%
X = 251.692
Centreline Data Centreline Data Y = 152.901
X = 256.692
X = 261.692 -1.35% Z = 2.392
Y = 152.913
Y = 152.925 -1.02% 1 in -4 1 in -6
Z = 1.461
Z = 1.663 DATUM RL 0.500
DATUM RL 0.500 DATUM RL 0.500
2.392
2.350
DESIGN
1.374
1.663
1.596
1.297
DESIGN
1.400
1.461
1.410
1.371
DESIGN
1.489
1.461
SURVEY
1.374
1.362
1.304
1.297
SURVEY
1.400
1.398
1.372
1.371
SURVEY
0.000
5.011
OFFSET
-1.160
0.000
5.002
6.793
OFFSET
-0.242
0.000
4.993
5.224
OFFSET
CHAINAGE 11
CHAINAGE 1 CHAINAGE 6
Centreline Data Centreline Data Centreline Data -1.69%
X = 262.692 X = 257.692 X = 252.692
Y = 152.928 Y = 152.916 -1.05% 1 in -6 Y = 152.903
Z = 1.361 -1.02% Z = 1.598 Z = 2.223
DATUM RL 0.500 DATUM RL 0.500 DATUM RL 0.500
1.361
1.310
1.317
1.350
1.598
1.546
1.260
2.223
2.138
DESIGN DESIGN DESIGN
1.361
1.317
1.317
1.350
1.339
1.268
1.260
1.469
1.437
SURVEY SURVEY SURVEY
-0.993
0.000
4.991
5.035
0.000
5.000
6.713
0.000
5.009
OFFSET OFFSET OFFSET
CHAINAGE 0 CHAINAGE 5 CHAINAGE 10
0 2 4 6 8 10m
SCALE 1:200 A3
Datum AHD Scale As Shown Status FOR APPROVAL
ABN: 13 609 593 339 Project Proposed Dwelling Drawing Title Driveway Cross Sections
Date July 2020 Drawn JAG Checked BG PO Box 5028
NORTH
Maroochydore BC
© 360 Civil Consulting Pty Ltd - All Rights Reserved.
This drawing as been produced for the sole benefit of the Designed JAG Approved BG Location 17 Cloudsley St, Noosaville
Client in accordance with the Terms of Agreement. QLD 4558
No responsibility or liability will be assumed to any third BEATRICE GIBBERD RPEQ 14557 Mobile: 0403 862 009
party. This document shall only be used for the site and
project specified.
A 23-12-20 Additional Detail added
Issue Date Description
JAG
By Chkd
BG
Email: [email protected] Client PF Residences Project No. 2020036 Dwg No. 06 of 07 Issue A