Skip to the record
Accept no imitations.

Council archive · source document

Skmbt_C25011061416250 · OPW11/0144

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Notice

Concurrence Agency Response, Amended Concurrence Agency Response

or Advice Agency Response

Agency Interest — General

1.

2.
3.

All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.

All materials and works must comply with Australian Standards.

An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency
procedure guides for the management of fuel and chemicals associated with the operational works
stage must be kept on site.

Anyone working under this approval must be trained in the use of the spill kit.

Telephone the Department of Environment and Resource Management's (DERM) Pollution Hotline on ©
1300 130 372 or local office on (07) 5459 6132 immediately after becoming aware of any release of
contaminants or other-breach of condition, not in accordance with the conditions of this-approval.

The construction and installation of the works must not result in any adverse impacts on the
surrounding environment, nor cause any long-term maintenance and management implications.

Should the works result in adverse impacts, the permit holder is responsible for rectification works and
where necessary the removal of the works causing impacts.

The chief executive administering the Coastal Protection and Management Act 1995 may order the
works to be removed or modified within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:

(i) create a-danger to the public; or

(ii) | cause erosion or land degradation; or

(iii) | are unstable; or :

(iv) have not been constructed according to the approved plans.

Agency Interest - Land

9.

10.

41.

No sand is to be removed from the coastal dune system or active beach system within the erosion
prone area or coastal management district.

Spoil removed from within the proposed development area must be stockpiled separately upon
excavation, and reused, rather than disposed of.

Best practice erosion and sediment control measures must be implemented and maintained to
minimise erosion and the release of sediment.

Agency Interest — Acid Sulfate Soil

12.

13.

Acid sulfate soils must be managed such that contaminants are not directly or indirectly released to
any land or waters.

Should acid sulfate soils be discovered they must be treated and managed inline with the latest
edition of the Queensland EPA's ‘Instructions for the Treatment and Management of Acid Sulfate
Soils’ 2001.

Agency Interest — Vegetation

14,

15.

All works must be undertaken in a manner that minimises damage to the native vegetation on and
adjacent to the site.

There must be no death or permanent removal of marine plants, inter-tidal plants or native terrestrial .
woody vegetation outside of the disturbance footprint as indicated within the attached approved plans,
as a result of these works.

 

Page 4 of 7° 091217 Department of Environment and Resource Management

Used in these records

About this file

File size
621 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SKMBT_C25011061416250.pdf · 621 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.