Original source · versioned page text
Approved Documents
abo 1.0 INTRODUCTION JF&P Consulting Engineers Pty Ltd have been commissioned by Country Club Villages Pty Ltd to compile a Site Based Stormwater Management Plan for the site located at Lot 2 SP 162077 Walter Hay Drive, Noosaville. It is proposed to construct a Retirement Village consisting of 169 Dwellings / Accommodation Units and Ancillary Facilities. The purpose of this study is to investigate the effects of the development proposal on the stormwater drainage characteristics of the site. Roof-water runoff from all dwellings is to be directed into rainwater storage systems as required in Condition 54 of the Noosa Council IDAS Development Application Notice dated 21" December 2005 and forms an integral component of the overall stormwater drainage strategy for the site. Preliminary drainage design calculations were undertaken by Robson & Associates Pty Ltd and documented on Greg Gibbs Architects drawing number 0379 SK 06B. These calculations have now been superseded by the current JF&P drainage design. 1.1 Stormwater Objectives The following conditions for Stormwater Drainage were stated in the ‘Noosa Council IDAS Development Application Decision Notice’ dated 21 December 2005. 1. All stormwater drainage from the site shall be collected on site and discharged generally in accordance with Plan — Drainage Design 0379 SK 05B dated October 2004 prepared by Greg Gibbs Architects, so there is no net increase in stormwater runoff from the site up to a Q100 event. Plans of the discharge design shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works. 2. Roof runoff from any new dwelling unit or apartment shall be directed to a rainwater storage system or tank (minimum storage 1400 litres per dwelling unit (villa) and 1000 litres per serviced or non-serviced apartment) that is plumbed to service the toilets in the new dwelling and landscaping areas. The design of the rainwater storage system shall be to the satisfaction of the Manager Plumbing Services. 3. Overflows from rainwater tanks may be discharged into the gravel drains proposed. 4. An approved maintenance plan for the treatment system be incorporated in the Management Scheme for the development and a copy of this shall be provided for Council’s records prior to commencement of the approved Use. 5. All site stormwater drainage shall be by means of a gravity system. Noosa Domain Retirement Village, Noosaville 2 Site Based Stormwater Management Plan M1717 Revision B 16 August, 2006
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Approved Documents.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.