2D Gag 40 XP-—SWMM MODEL 4.1 Introduction XP-SWMM Version 10.0 was used to analyse the stormwater runoff and drainage of the proposed site and the proposed stormwater network. 4.2. Catchments The catchments used for the XP-SWMM model were taken from the proposed design for the stormwater drainage network completed in PC-Drain. Catchments that were assumed to be only overland flow and hence not allowed for in the PC-Drain model were analysed in the XP-SWMM Model. Catchment runoff that was assumed to be stored and treated by the infiltration system (Qz2o from roofwater runoff) was not analysed in the model due to the fact it would be directly stored in the infiltration system and infiltrated through the sand layer. The Post - Development Catchment Plan can be seen in Figure 4. 4.3. Flows The catchment flows were calibrated to match the peak flow from the 15min, 20min, 25min, 30min, 45min and 60 minute storm durations for the 100 year ARI event. It was found that for each catchment the 25 minute storm duration was the worst case scenario and hence produced the greatest flows and depths. 4.4 Results The output results from the XP-SWMM model can be seen on Figure 5. It can be seen that the proposed stormwater drainage network is more than adequate with the greatest ponding depth achieved at any one node being 140mm. It can also be seen that the total flow out of the site is 2.07m°/s, which is much lower than the pre-development flow of 2.80m"/s. Table 4 _ Post - Development Quoo Flows for a storm duration of 25mins. Post-Development Q1o9 Outlfow (m°/s) — OUT 1 0.052 Post-Development Qioo Outlfow (m°/s) — OUT 2 0.142 Post-Development Qio0 Outlfow (m/s) — OUT 3 0.129 Post-Development Q1o0 Outlfow (m°/s) — OUT 4 0.068 Post-Development Q1o9 Outlfow (m/s) — OUT 5 0.054 Post-Development Q1o0 Outlfow (m*/s) — OUT 6 0.063 Post-Development Q1o0 Outlfow (m*/s) - OUT 7/H 0.541 Post-Development Qo Outlfow (m°/s) — OUT 8/D 0.605 Post-Development Qio9 Outifow (m*/s) — OUT 9/A 0.460 TOTAL Post- Development Qioo Outlfow (m*/s) 2.114 TOTAL Pre - Development Qioo Outifow (m*/s) 2.70 Is there a Non-Worsening effect between Outflows? Yes Noosa Domain Retirement Village, Noosaville 10 Site Based Stormwater Management Plan M1717 Revision B 16 August, 2006
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Approved Documents.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.