Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Approved Documents

of 24

Page text read automatically using OCR, there may be inaccuracies

eb

MAITENENCE PLAN
1.0 INTRODUCTION

This Maintenance Plan has been prepared specifically for the stormwater infiltration
system incorporated in the JF&P Consulting Engineers Pty Ltd civil engineering
stormwater drainage design for the Noosa Domain Retirement Village, Noosaville. The
infiltration system comprises a pipe network which contains a high percentage of 525mm
Nominal |.D FRC Slotted Pipes interconnected to 1800mm Nominai I.D RC pipes within
the network where required to detain some of the volume.

The infiltration system captures and treats stormwater runoff from roof downpipes and
surface flow through the principles of filtration. It does not rely on the use of vegetation or
above ground devices and is, therefore, an inherently low maintenance device. The
system also contains no standing water. It will not be subject to algal blooms or to
mosquito breeding.

All the fields inlets capturing surface runoff and directing flows into the infiltration system
will be fitted with ‘Ecosol’ baskets that will effectively capture and prevent gross pollutants
and course sediment from entering the system.

1.1 Stormwater Objectives

The following conditions for Stormwater Drainage were stated in the ‘Noosa Council IDAS
Development Application Decision Notice’ dated 21 December 2005.

1. All stormwater drainage from the site shall be collected on site and discharged
generally in accordance with Plan — Drainage Design 0379 SK 05B dated October
2004 prepared by Greg Gibbs Architects, so there is no net increase in stormwater
runoff from the site up to a Q100 event. Plans of the discharge design shall be
prepared by a Registered Professional Civil Engineer and submitted to Council prior
to obtaining a Development Permit for Operational Works.

2. Roof runoff from any new dwelling unit or apartment shall be directed to a rainwater
storage system or tank (minimum storage 1400 litres per dwelling unit (villa) and
1000 litres per serviced or non-serviced apartment) that is plumbed to service the
toilets in the new dwelling and landscaping areas. The design of the rainwater
storage system shall be to the satisfaction of the Manager Plumbing Services.

3. Overflows from rainwater tanks may be discharged into the gravel drains proposed.

4. An approved maintenance plan for the treatment system be incorporated in the
Management Scheme for the development and a copy of this shall be provided for
Council's records prior to commencement of the approved Use.

5. All site stormwater drainage shall be by means of a gravity system.

 

Noosa Domain Retirement Village, Noosaville 2 Stormwater Infiltration System Maintenance Plan
M1717 Revision B 16 August, 2006

Log in to download the original (Approved Documents.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.