Original source · versioned page text
Approved Documents
abiPQp 2.4 Infiltration System Infrastructure During each routine inspection, the following inspections of the infiltration system infrastructure should be undertaken. e Check integrity of all field inlets and baskets e Check all concrete structures for damage or deterioration 2.5 Health and Safety Issues Staff involved in management and maintenance activities within the infiltration system should be cognisant of the health and safety issues associated with these activities. Some of the relevant issues are the handling of litter and working in confined spaces if access is required to the underground chamber. Hazards exist with maintenance activities and the implementation of appropriate work practice guidelines for these activities is recommended for the maintenance and management of the infiltration system. 2.6 Site Clearance and Restoration The site should be left in a clean and tidy condition following maintenance work. 3.0 MAINTENANCE COSTS Estimated resource requirements and maintenance costs for the work described above follow: Task Frequency | Resources Hourly Rate | Hours | Amount Routine inspection, | 3 Months 2 x labour $90 8 $720 vegetation 1 x truck $80 8 $640 management, weeding and litter removal CCTV 2 Years $3,500 4.0 Asset Ownership The works shall remain in the ownership of the Retirement Village and maintained accordingly. Noosa Domain Retirement Village, Noosaville 4 Site Based Stormwater Management Plan M1717 Revision B 16 August, 2006
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Approved Documents.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.