Original source · versioned page text
Appendix C - Stormwater Management Plan
Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 4 0 5 10 15 20m
6/10/2015 2:37:35 PM
Metres
N
LEGEND
DP DOWNPIPE
GP1 GULLY PIT FITTED WITH SPEL STORMSACKS
GP2 FIELD INLET GULLY PIT
GP3 OILY WATER GULLY PIT
LEGAL POINT
214°14 0 TD TRENCH DRAIN
OF DISCHARGE
0
'30" 9.3
°2 8'
67.39 247
DP
45
04 00 2 3.4
10
.8
0 8
9.3 PROPERTY BOUNDARY
9.6 74
0 9.2 8
9.0
DEVELOPMENT AREA
WALTE
GP
GP2
0
9.3
5 ROOFWATER DRAIN
03'
12.03
R HAY D
306°
DP 0 0
20 1
65 9.2 9.39 STORMWATER DRAIN
20 .8 9.4 9.0
FFL.9.700
10
9.6
80
0 8.7
00
OILY WATER DRAIN
RIVE
6
0 8.7
8
0
0
9.4
5 GP2 9.1 0
8.8
8
RETAINING WALL
8
9.6
9.600
9.400
57
9.2
07 DP
0
9.5
0 GENERAL DIRECTION OF FINISHED SURFACE FALLS
"
312°09'25
.9
10
6.945
0 8
9.6
8.430 PROPOSED SPOT HEIGHT
0 5
0 3 9.5
9.5
0 0 0 7
5 9.0 9.1
8
9.4
0 9.4
5
00
8.980 EXISTING SPOT HEIGHT
25 .9 9.2
11 0 5
VALL
9.2
FFL 8.650 FINISHED FLOOR LEVEL
321°59'25"
EY LI
0 0
6.945
9.4
NE
0 5 0
9.8 9.1
7
9.400
0 9
8.9
VACANT LAND
9.600
0 5 9.000
GP3 8.9 0 5
0 9 9.600 9.2
9.4
9.600
10.000
331°50'
9.200
9.800
6.945
9.200
98
DP GP1
.0 1 0 3
11 GP 0 1 GP 9.3
9.3 0 7
.15
0 9.2
10 50 0
GP 3
GP3 DP 9.3
.1 0 1
10 9.2
10
GP3 DP
GP 9.2
8
TD
8
TD GP3
GP 9.3
05
7'
00 0 3
5°2
7.7
9 .4 9.3
140°21'05"
34
50.292
70
0 9.2 2
0 9.2 0 4
28 2 9.4
.0 9.2
SPEL PURACEPTOR
12 94 20 01
.5
GP1 9.6
11 .2 1
11 GP 0
20 3
.9 74 9.3
0
7.
11 70
.060
00 9.7
70 '
.5
2°
9.96
11 .8
5
50
10
00
40 0 0
9. 8
.8 5 5
11
(ACCESS EASEMENT)
9.4 9.7
DETENTION TANK
00
0
.0
. 00
11
CAPACITY 38,400L
10
0
.80
0
.2 0
10
00
0
11
.60
.2
8.
10
10
15 63
°1
0 8'
10 .40 0 0
.3 10 9.9
11
11
.6
5
GP1
1
.26
00
10 GP 22
8.6
3
°51
'
A 01.10.15 GM D.A. APPROVAL JA
revision date by description checked
11
LEGAL POINT
.40
30
0
4
.2 Figured dimensions to be taken in preference to scale readings
OF DISCHARGE
11 97 8.69.
3
30°2
PROJECT See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.