Original source · versioned page text
Appendix C - Stormwater Management Plan
Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).
Original PDF page 66, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.3 Inspection and maintenance checklist for bioretention systems ASSET TYPE Bioretention ASSETID Location Date Date of last rainfall Weather Officer's name Bioretention plan Insert diagram or plan of the asset showing key features e.g. locations of inlet, outlet, and overflow Additional information Time taken to complete inspection or maintenance Photos of site 1. (explanatory notes) General comments and sketches Officer's signature Maintaining Vegetated Stormwater Assets Vers on’ WOterbydesign 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.