Council archive · source document
Copy Response to DERM's information request from applicant - REC11/0145
Very large file (31.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
I
;j
B
"II-
’J(.~ i;
..#
( j
,.,18"_~
WEBB
ROAD
J
". ~;! T8N Svw.
hK""
RJ.$QfOOAFtrary
NEW MANHOLE
SL49.20
IL 48.27 2
NOTE: LEVELS HAVE BEEN DERIVED
DEPTH O.93m RP1512"
FROM A ARBITRARY DATUM.
~
LEVELS ARE TO BE CONFIRMED ANO
APPROVED PRIOR TO ANY WORKS
RPUl2~
~.’
~
3 -
PRIVATE PUMP SEWER MAIN
1
l
SEWER NOTES ...., TO DISCHARGE SEPERATELY
1. ALL SEWERS ARE TO BE 150mm OIA uPVC CLASS SN8 -
AS1260 -
RUBBER-RING INTO NEW MANHOLE
JOINTED UNLESS NOTED OTHERWISE. FOR SEWERS DEEPER THAN 3.0m, uPVC
CLASS 12 PRESSURE PIPE TO AS1477 SHALL BE USED. INSIDE EDGE OF CLASS
12 PIPE IS TO BE CHAMFERED TO PROVIDE A SMOOTH TRANSITION OF FLOWS
WHEN USED IN CONJUNCTION WITH OTHER CLASSES OF PIPES AND FITTINGS
2. BEDDING FOR PIPELINES SHALL BE WASHED 5mm-10mm SCREENINGS OR MARY
RIVER SAND WITH A MINIMUM OF 100mm BELOW AND ABOVE PIPES. IN COASTAL
SAND TERRAIN, EXCAVATED MATERIAL MAY BE USED FOR BEDDING SUBJECT
TO THE APPROVAL OF THE SEWERAGE ENGINEER.
3. MINIMUM COVER FOR SEWER PIPES SHALL BE O.9m FOR ALLOTMENTS AND
FOOTPATHS AND 1.2m FOR ROADWAYS.
4. ALL WORK ON EXISTING SEWERS IS TO BE PERFORMED BY COUNCIL UNLESS
OTHERWISE DIRECTED BY THE SEWERAGE ENGINEER AND ACTUAL COST
INCLUDING LABOUR AND MATERIALS SHALL BE MET BY THE DEVELOPER.
5. MANHOLES SHALL BE PRE CAST 1.050m DIA UNLESS NOTED OTHERWISE AND
CONSTRUCTED IN ACCORDANCE WITH WSM STD. DWG No SEW-1300.
6. MANHOLE LIDS SHALL BE CONSTRUCTED SO THAT:
. IN ROADS THEY ARE FLUSH WITH FINISHED SURFACE LEVEL
. IN FOOTPATHS AND ALLOTMENTS THEY ARE 100mm ABOVE FINISHED SURFACE
-<>
LEVEL -1?;
7.THE SCHEDULE DEPTH FOR PAYMENT OF EXCAVATION AND BACK FILLING OF
~4-
TRENCHES IS BASED ON THE AVERAGE OF THE TWO PIPE INVERT DEPTHS -1~
BELOW THE FINISHED SURFACE LEVEL AT ADJACENT MANHOLES.
~
~
’"
~
~
NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
CONTACT ALL RELEVANT SERVICE AUTHORITIES TO VERIFY
THE LOCATION OF ALL EXISTING SERVICES PRIOR TO START
OF CONSTRUCTION.
9
RPM:aJ1
LOCAL AUTHORITY REFERENCE CLIENT DRAWING TITLE SCALE
Sunshine Coast Council
ASTRONOMER PTY LTO PROPOSED SEWER WORKS
REC1110145
DMC QLD ENTERPRISES PTY LTD LEVEL DATUM PROJECT usa s 10 Al
ACN 149541444 ARBITRARY 21 WEBB ROAD 1:500 l""’"! AJ
DRAWN DATE
SUNSHINE BEACH, Q 4567
R~~.
REFER SURVEY PLAN BY
KIUMORLEY & ASSOCIATES PTYLTll JM (OMC) MARCH ’12
ENGINEERING + PROJECT MANAGEMENT
A JM 6.3.12 ORIGINAL ISSUE LOT 2 ON RP 234161
APPROVED SCAUE DRAWING NO.
DIANA CAMPBELL DATE 01 A
MARK BY DATE APP REVISION
RPEQ4945
DC 1 :250 (A1)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Copy Response to DERM's information request from applicant - REC11/0145Related documentApplication case desk ↗
About this file
- File size
- 31.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.