Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Copy Response to DERM's information request from applicant - REC11/0145

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (31.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

            ,
                t



4   ,   ,




                         Department of Environment
                         and Resource Management
                                                                                                                                  Guideline

                                                               Reconfiguring a lot in a coastal management district

                                                                                                    the existing (and proposed
                         2) One copy of a plan or plans at a scale not smaller than 1:1 000 showing
                                                                                                                land to be subdivided and
                            finished) levels of the land to be subdivided and that area of land between the
                                                                                                                  intersection of a 25
                            the line of mean high water spring tides. The levels are to be taken at the points of
                                                                                                             to Australian Height
                            metre grid related to the Real Property boundaries and to be in metres related
                                                                                                                            shown.
                            Datum. The plan or plans to be certified by a licensed surveyor with the date of survey

                                                                                                          the coastal management
                         3) The location of the proposed development in relation to the boundary of
                            district.

                                                                                                      local government or if local
                         4) The location of the storm tide natural hazard management area adopted by
                                                                        natural hazard management       the plan should illustrate
                            government have not adopted a storm tide                              area,

                             an alternative area   subject to storm tide inundations.

                    Information addressing key coastal plan policies

                         5) Policy 2.2.2 Erosion prone areas
                                                                                                                        erosion prone areas,
                             .   Specify the existing and proposed tenure and zoning of land within designated
                                 if applicable.

                             .   If it is not proposed to surrender the land within the erosion prone area to the State, justification
                                                       6
                                 should be provided.

                                                                                                                        the development will
                             .   Investigate the effect that changes in tidal flow characteristics in the vicinity of
                                 have on the adjacent coast.


                         6) Policy 2.2.4 Coastal Hazards
                             .    Details of the severity of the storm tide inundation hazard.

                             .    Details of how the proposal is compatible with the nature and relative severity of the storm
                                                                                                                                     tide

                                  hazard.

                             .    Details of how the development achieves outcomes 1 and 2 of the guideline Mitigating the adverse

                                  impacts of storm tide inundation.

                         7) Policy 2.3.1 Future need for access
                                                                                                                created beaches or
                             .
                                 Report on the measures proposed to provide public access to any newly
                                 foreshore areas, including measures proposed to safeguard the stability of frontal dune areas.

                             .    Provide details of whether the development will result in net loss of access to the foreshore or public

                                  usability of coastal waters and, if so, demonstrate why the loss may be acceptable.

                         8) Policy 2.4.1 Water quality management
                             .    Provide details of how the development will or may affect water quality of any adjacent coastal
                                  waters including coastal waterways.




                    5                                                                                                                       storm
                        Where local government have not adopted a storm tide natural hazard management area, the designed
                    tide event should be indicated on the plans. However, where local government have not undertaken
                                                                                                                                  detailed
                    studies to        information about the areas subject to storm tide inundation, the plans should indicate the
                                 provide
                    default area which is below highest astronomical tide + 1.5m, For more information refer to the guideline
                                                                                                                          within the
                    Mitigating the adverse impacts of storm tide inundation and the fact sheet Development applications
                    stalin Tide Natural Hazard Manaqf1me’ht Area,
                    6                                                                                                 be
                     DERM can require as part of its concurrence response that the land within the erosion prone area
                    surrendered to the State as a condition of approving the development.


                    Page 2 of 4 100917
                               .                                                          Department of Environment and Resource Management

Used in these records

About this file

File size
31.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Copy Response to DERM's information request from applicant - REC11_0145.pdf · 31.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.