Skip to the record
Accept no substitutions.

Council archive · source document

Reference Documents Plans - MCU24 0112 · MCU24/0112

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                     •    within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to mobilise
                          sediment on site).
                 Drainage paths are to be inspected to ensure the sediment fences are not being bypassed as a result
                 of soil erosion.

                 Sediment laden runoff shall be prevented from entering neighbouring properties. This shall be achieved
                 by landscaping disturbed areas immediately and prior to a rainfall event.
                 The proposed development has scored a ‘13’ on the IECA erosion hazard assessment with one trigger
                 score value exceeded as a result of the site slope (refer Appendix A for details). Further details of
                 proposed on site erosion and sediment control measures will be required at the detailed design phase
                 of the development.
                 4.3.3 Ma int en an ce and M o nit o ri ng Re qui r em ent s

                 Periodic maintenance and monitoring of stormwater devices proposed in this report is crucial to ensure
                 effective operation and design life.
                 Inspect field inlet grates, pits and underground pipes for blockage or damage at least 6 monthly or after
                 significant rainfall event. The filter baskets shall be inspected and maintained preferably by the
                 manufacturer to avoid damage to units and to ensure adequate cleaning and record keeping. For the
                 first 12 months routine inspections of filter baskets shall be carried out monthly with routine clean out
                 at alternate months. Results of the initial 12 months maintenance program shall be used to determine
                 future maintenance intervals. Refer manufactures maintenance and monitoring methodology for
                 specific details.

                 Maintenance of ESC measures must occur in accordance with Table 7.

                 Table 7 - ESC maintenance requirements.

                         ESC Measure                   Maintenance Trigger              Timeframe for Completion
                                                                                             of Maintenance

                  Sediment basins               When settled sediment exceeds          Within 7 days of the
                                                the volume of the sediment             inspection.
                                                storage zone

                  Other ESC measures            The capacity of ESC measures           By the end of the day.
                                                falls below 75%.

                 Sediment accumulation on ESC devices is to be removed and disposed of to the satisfaction of Noosa
                 Council.




                                                                                                                           8
Document Set ID: 23352733
Version: 1, Version Date: 15/11/2024

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Documents Plans - MCU24 0112.pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.