Council archive · source document
20517 App L.pdf [As Published] · 132007.1259
APPENDIX L Traffic Impact Assessment Prepared by Cardno Eppell Olsen 743 Ann Street, PO Box 1559, Fortitude Valley QLD 4006 Phone 07 3237 8899 Facsimile 07 3237 8833 Page 41 | 20517_PlReport_FINAL_FW MC.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 26 pages
Page 2
Brisbane Office Level 1, 9 Gardner Close PO Box 388 Toowong Q 4066 Tel: (07) 3310 2401 Fax: (07) 3369 9722 Gold Coast Office Suite 2/20 Nerang Street PO Box 391 Nerang O 4211 Tel: (07) 5502 1585 Fax; (07) 5502 1586 Sydney Office 910 Pacific Highway Gordon NSW 2072 Tel: (02) 9496 7700 Fax: (02) 9499 3902 Wollongong Office PO Box 420 Wollongong NSW 2520 Tel: 0402 965 929 CD gareine essence of peregian beach Traffic Impact Assessment Scanlon Property Group June 2007
Page 3
Essence of Peregian Beach q Cardna Eppell Olsen Contents 1.0 2.0 3.0 4.0 5.0 6.0 INTRODUCTION 1.1. Background , 1.2 Scope of Work 1.3. References EXISTING SITUATION 2.1 Subject Site 2.2 Key Roads 2.3 Key Intersections 2.4 Existing Traffic Volumes 2.5 Public Transport PROPOSED DEVELOPMENT 3.1 Site Use 3.2 Car Parking 3.3. Access CAR PARKING REVIEW 4.1 Car Parking Requirements 4.2 Car Parking Provision 4.3 Site Layout Review 44 Bicycles 4.5 Pedestrians DEVELOPMENT TRAFFIC IMPACTS 5.1. Assessment Scenarios 5.2. Traffic Growth 5.3 Traffic Generation 5.4 Traffic Distribution 5.5 Summary of Development Traffic Generation 5.6 Traffic Impacts ~ CONCLUSIONS Page Number aa a ARRRONN NN QD 14 14 14 14 16 16 20 22 CE005616 290607 dz/bw/ts
Page 4
Essence of Peregian Beach TABLE: 3.1 41 4.2 5.1 5.2 5.3 S$: Schedule of Accommodation Uses Car Parking Requirement Commercial Car Parking Requirements Considering Temporal Demands Traffic Generation David Low Way/Heron Street/hotel access: SIDRA Analysis Results David Low Way/Unnamed Access Road: Analysis Results FIGURES: Site Location and Surrounding Environs David Low Way to the North David Low Way to the South Existing Peak Hour Turning Movements 2018 Background Volumes Development Traffic Generation 2008 Development Traffic Flow 2018 Post Development Traffic Flow 2.1 2.2 2.3 2.4 5.1 5.2 5.3 5.4 APPENDICES: A B Cc D Development Plans Swept Path Assessments Recommended Modifications SIDRA Results Docu ment Control Essence of Peregian Beach Version Date Author Reviewer Name Initials Name Initials Draft RevA 01 June 2007 Original David Zohar . not signed Beth Whelan Original signed Draft RevB 25 June 2007 Original David Zohar not signed Beth Whelan Original signed Draft RevC 26 June 2007 Original David Zohar not signed Beth Whelan Original signed Final 29 June 2007 David Zohar Not signed Beth Whelan Gd. Yeu "© 2007 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent of Cardno.” CE005616 290607 dz/bwits
Page 5
Lo C Cardne Essence of Peregian Beach ~ Eppell Glsen 1.0 INTRODUCTION 1.1 Background Cardno Eppell Olsen has been commissioned by Scanlon Property Group to undertake a traffic impact assessment to accompany a development application for a material change of use. The proposed development includes a commercial/retail building, visitor hostel and beach shacks on an existing caravan park site nestled behind the Peregian Beach Hotel. The site is described as 215 — 219 David Low Way, Peregian Beach and is on the northwest corner of an unnamed access road. The following report has been prepared to be submitted in conjunction with the development application. 1.2 Scope of Work This report has been prepared to document a review of the traffic, car parking and waste impacts of the proposed development in Peregian Beach, Noosa. In undertaking this report the following has been considered: . a review of car parking provision; . a review of car parking layout and serviceability; . pedestrians/cyclist review; . the requirements for manoeuvrability of service vehicles within the site; . an estimation of development traffic generation; . an estimation of development waste generation; * . awaste management plan; . assignment of traffic to surrounding road network; . impact of development traffic upon the surrounding road network. 1.3 References In preparing this report the following background materials have been considered: . ‘Transport Assessment Guide (TAG)’, Department of Main Roads (DMR); . ‘Guide to Traffic Engineering Practice’, AUSTROADS part 14 Bicycles; . Noosa Planning Scheme 2006; . a site visit by Cardno Eppell Olsen in May 2007; . manual traffic counts undertaken by Australian Traffic Surveys in May 2007; . Australian Standard - Parking Facilities, Part 1: Off Street Car Parking (AS/NZ2890.1:2004); . Australian Standard — Parking Facilities, Part 2: Off Street Commercial Vehicle Facilities (AS/NZ2890.2:2002); . Draft Peregian Beach Village masterplan. CE005616 290607 dz/bwits 1
Page 6
(J Gardno Essence of Peregian Beach Eppell Olsen 2.0 EXISTING SITUATION 2.1 Subject Site The proposed development site is approximately 2.161ha in area (broad hectare) and is located at 215 —- 219 David Low Way, Peregian Beach. The subject land is described as lots 8, 9 and 10 on P9315 and Lot 76 on MCH 2969, Parish of Weyba, County of March. The site is bounded by David Low Way to the east, an unnamed access road to the south, Noosa National Park to the west, a sports oval to the north and the Peregian Beach Hotel to the northeast. The site is currently used as a caravan park and camping grounds. The Peregian Beach Village is located on the eastern side of David Low Way in the vicinity of the site. Currently there is a pedestrian zebra crossing across David Low Way in the vicinity of the site. Access to the site is currently provided via the unnamed access road on its southern boundary. This access road also provides access for the Home Hardware development and connects to David Low Way at an unsignalised T-junction. The location of the proposed development and its environs is shown on Figure 2.1. Figure 2.1 Site Location and Surrounding Environs Subject Site CE005616 290607 dz/bwits 2
Page 7
Essence of Peregian Beach Eppell Olsen
2.2 Key Roads
2.2.1. David Low Way
In Noosa Council’s Road Hierarchy, David Low Way is classified as Major Road Network (i.e.
arterial road). It is currently constructed as a two-lane, two-way divided roadway and is
generally aligned in the north to south direction. The carriageway in the vicinity of the site is
currently in the order of 7.2m wide, set within an approximate 30m road reserve. It has the
following characteristics:
. pedestrian paths are provided on both sides of the carriageway;
. bicycle lanes and bicycle awareness zones are provided;
. the posted speed limit in the vicinity of the proposed development is 60km/h;
. access to other developments is permitted with left-in/left-out movements.
Figure 2.2 shows David Low Way looking from the site access road to the north. Figure 2.3
shows David Low Way looking from the site access road to the south.
Figure 2.2 David Low Way to the north
CE005616 290607 dz/bwits 3
Page 8
q) Cardno Essence of Peregian Beach Eppell Olsen Figure 2.3 David Low Way to the south 2.3 Key Intersections The following have been identified as key intersections in the vicinity of the site: ° David Low Way/Heron Street/hotel access: roundabout; . David Low Way/unnamed access road: priority controlled T-junction. The traffic impacts of the development have been assessed at these intersections. 24 Existing Traffic Volumes In order to determine the existing traffic volumes, Australasian Traffic Surveys completed manual traffic surveys on Thursday 3 May 2007. These surveys recorded turning movements from 7:00am to 9:00am and 4:30pm to 6:30pm at the following intersections: . David Low Way/Heron Street/hotel access; . David Low Way/unnamed access road. The observed peak hours occurred between 7:45am — 8:45am and 4:30pm — 5:30pm. The traffic volumes at these peak times are presented on Figure 2.4. 2.5 Public Transport Currently there are bus stops on each side of David Low Way in the vicinity of the site connecting to Noosa and to Coolum. The bus stops are in a short walking distance, i.e. less than one minute. CE005616 290607 dz/bwits 4
Page 9
LEGEND 000 AM Peak (000) PM Peak 000 Includes U-turn : Drawing Title: Figure No: 2.4 q) Cardno 2007 Existing Date: 20.06.07 Eppell Olsen Traffic Flows Project No: CE005616 GASE 16% 3 6 ohutnes_June OF cit
Page 10
qI9> Cardne Essence of Peregian Beach Eppell Olsen 3.0 PROPOSED DEVELOPMENT 3.1 Site Use The proposed development is known as “Essence of Peregian Beach”. The site is to be developed in two components, with a commercial building fronting David Low Way and an affordable accommodation resort adjacent to the National Park. The commercial development is a three level building, including one level of car parking. Plans for the proposed commercial building prepared by JMA Architects (Drawing No. 1024 A- 12, issue DA-P2 dated 20 June 2007) includes 1,928sq.m of floor area. This is comprised of: . 316sq.m at ground level of restaurant area (it has been advised that one of the ground floor tenancies, most likely the middle tenancy, will be a restaurant); . 636sq.m at ground level of retail area; . 976sq.m at the first floor of office space. Within the accommodation precinct, there will be a combination of stand-alone cabins (beach shacks) and hostel units. It is understood that the hostel units are to provide flexibility of accommodation providing for families who are holidaying together, whilst also providing ‘backpacker’ accommodation. Table 3.1 provides a summary of the proposed accommodation uses. The information contained in Table 3.1 is based on plans prepared by JMA Architects (Drawing No. 1024 A-16 and Drawing No. 1024 A-04, both issue DA-P2 and dated 19 June 2007) and as calculated by Cardno Eppell Olsen. Table 3.1 : Schedule of Accommodation Uses Use Size Number of Units Stand-Alone Cabin 2 and 3 bedrooms 30 units ‘Hostel Units 1 bedroom 66 independently lockable units 2 bedroom 66 independently lockable units Plans for the proposed development are provided at Appendix A to this report. CE005616 290607 dz/bwits 6
Page 11
CJD Gareino Essence of Peregian Beach Eppell Olsen 3.2 Car Parking The car parking proposed for the development is shown on the site plan/basement drawing prepared by JMA Architects (Drawing No. 1024 A-04, issue DA-P3, dated 26 June 2007). A total of 57 car spaces and seven motorcycle parking spaces are proposed at the basement level within the commercial building. Of these spaces, two are considered too short and are recommended to be removed. In addition, 45 car parking spaces are provided on the internal access road. It is understood that these spaces are provided for the commercial building. This results in a total of 100 car parking spaces and seven motorcycle spaces for the commercial building. Of these, two car parking bays are for disabled users. A total of 61 car parking spaces are proposed under the accommodation buildings, of which, six spaces are double bays capable of accommodating trailers. Included within the car parking supply are three spaces which are provided for people with a disability. The management of the above spaces will be the responsibility of the body corporate. A porte cochere including short-term parking and bus set-down/pick-up opportunities is to be provided at the front of the accommodation site. This is capable of accommodating pick- up/set-down of persons with a disability. Bicycle parking for some 22 bicycles is proposed within the commercial basement. In addition, 16 bicycle racks are provided in the accommodation car parking area at car park A. 3.3 Access Access for the site is proposed at two locations, one being an entry only, the other being an exit only. it is recommended that appropriate one-way and no entry signage be installed to reinforce the proposed one-way direction. The site access is via the unnamed cul-de-sac road to the south of the site. This access road also serves Home Timber and Hardware opposite the site. This access will provide vehicle access to the site via a porte cochere. This porte cochere has been designed accommodate access by a 12.5m rigid vehicle. CE005616 290607 dz/bw/ts 7
Page 12
cs Cardnoa Essence of Peregian Beach Eppell Olsen 4.0 CAR PARKING REVIEW 44 Car Parking Requirements The Noosa Planning Scheme (NPS) sets out the minimum number of car parking spaces for new developments. The following car parking rates are applicable to this development: . visitor hostel: - 1 space per 12 guests capable of being accommodated; - 1 space per staff member; - one (1) parking for a courtesy shuttle bus (no bigger than 30 seats). . cabin parks: - 1 space per cabin; plus - 1 space per 10 cabins. . office: 1 space per 20sq.m of use area or part thereof. . restaurant: 1 space per 10sq.m of use area. . retail: - 1 space per 20sq.m or part thereof of use are for areas up to 100sq.m; - 1 space per 15sq.m or part thereof of use area for areas in excess of 100sq.m. It is noted that the accommodation precinct is estimated to have a total of 15 staff members, but these staff would not all be working at the same time. It is envisaged that the staff would be on staggered shifts. As such, a maximum of eight staff are expected to be on the site at any one time. As the car parking ratios for the visitor hostel are based on the number of guests, the following tates have been assumed. These rates are based on ‘Table 6.1: Rates of Occupancy for Population Density’ in the Noosa Planning Scheme: . 1 bedroom unit: 1.4 persons; . 2 bedroom unit: 2.4 persons. Based on the above car parking rates, Table 4.1 sets out the parking requirement for the proposed development. CE005616 290607 dz/bwits 8
Page 13
CJ Gardno Essence of Peregian Beach Eppell Olsen Table 4.1 Car Parking Requirement Size or Cars Precinct Land Use No. of Car Parking Rate . Uni Required nits Stand- 2and3 Alone b 30 cabins 1.1 spaces per cabin 33 spaces . edrooms Cabin Accommodation | | 4.16, | guests | 250 guests 1 space per 12 guests 21 spaces Units staff 8 staff 1 space per staff member 8 spaces Sub Total | 62 spaces Office 976sq.m 1 space per 20sq.m 49 spaces . 1 space per 20sq.m Retail (shop 1 285sq.m 17 spaces (shop 1) 4 (first 100sq.m) P Commercial | 1 space per 15sq.m Retail (shop 2) 351sq.m (over 100sq.m) 22 spaces Restaurant 316sq.m 1 space per10sq.m _ 32 spaces Sub Toial | 120 spaces Total | 182 spaces The above shows that 62 car parking spaces are required for the accommodation precinct, with 120 spaces required for the commercial precinct. This is a total of 182 car parking spaces. 42 Car Parking Provision The car parking proposed for the development is shown on the site plan/basement drawing prepared by JMA Architects (Drawing No. 1024 A-04, issue DA-P3, dated 26 June 2007). These plans include the following car parking provision: . accommodation precinct: 61 car spaces plus porte cochere; — commercial precinct: 100 car spaces plus seven motorcycle spaces (assuming two spaces are lost, refer Section 4.3); . total: 161 car spaces plus seven motorcycle spaces. The Noosa Planning Scheme considers each four motorcycle parking bays to represent one car parking bay. As such, the car parking supply for the commercial precinct could be considered as 102 spaces. The car parking provision for the accommodation precinct is one space short of the car parking requirement, not considering the supply available within the porte cochere. The above analysis indicates that the car parking supply for the commercial precinct is 18 spaces short of the requirement. CE005616 290607 dz/bwits . 9
Page 14
Sp) Cardno Essence of Peregian Beach Eppell Olsen In terms of the car parking demands for the commercial precinct, it is expected that the peak parking demands associated for the restaurant and those associated with the office will occur at different times of the day. During the weekday lunchtime period, when the office is expected to be fully operational, the restaurant is only expected to be achieving 50% of its peak parking demand. Conversely, when the restaurant is fully occupied, either in the evening or the weekend periods, the car parking demands associated with the office are expected to be negligible. Table 4.2, below, has therefore been prepared to indicate the likely peak demands for the commercial precinct, considering the temporal demands. Table 4.2 Commercial Car Parking Requirements Considering Temporal Demands Car Parking Usage Use Car Parking Weekday Lunch Weekend Lunch/Evening Requirement % Expected Car % Expected Car Utilisation | Parking Demand | Utilisation | Parking Demand Office 49 spaces 100% 49 spaces NIL NIL Shop 39 spaces 100% 39 spaces 100% 39 spaces Restaurant 32 spaces 50% 16 spaces 100% 32 spaces Total 120 spaces 104 spaces 71 spaces The above indicates that the car parking associated with the commercial development is expected to peak at 104 cars, given the temporal demands. The proposed car parking. provision is expected to be adequate, given: . it is expected that there will be a cross-utilisation of the restaurant and retail components with the accommodation precinct; . the porte cochere for the accommodation precinct is capable of accommodating a 12.5m bus, which is larger than the requirements of Council and makes it possible for large tour groups (i.e. OZ Experience) to stay on the site; . a total of 40 bicycle parking spaces are proposed for the combined development; ° as indicated in Table 4.2, the car parking demands for the restaurant will peak at a different times to the office components. CE005616 290607 dz/bwits 10
Page 15
CJ Garcdne Essence of Peregian Beach ~ Eppell Olsen 4.3 Site Layout Review 4.3.1 Car Parking Layout A review of the car parking layout against the requirements of the Noosa Planning Scheme and the Australian Standards for Off Street Car Parking (AS/NZS2890.1-2004) has been undertaken. This review indicates the following: . in general, car parking bays are 2.6m wide by 5.4m long; . access aisles are generally in excess of 5.8m wide. Further to the above review, the following are noted: . it is recommended that car spaces #49 and #50 within the commercial car parking basement be deleted as they are effectively 4.6m long; . a number of car parking bays are 4.8m long, which allow for a 600mm overhang at the end of the car parking bay; . car spaces #24 and #30 within the accommodation car parking area are incorrectly drawn and are meant to be 2.6m wide; . a vehicle turn around area is provided at the top of the car parking access aisle. Subject to the removal of car spaces #49 and #50, the car parking layout is considered appropriate. 4.3.2 Servicing The Noosa Planning Scheme requires that the site shall include adequate space for the loading and unloading of vehicles. As these are effectively two separate sites, loading for each site has been provided. The anticipated commercial vehicles requiring access to the development include: . a 6.4m SRV to the accommodation precinct; . an 8.0m mini-bus to the accommodation precinct; . an 8.8m HRV to the commercial precinct. This is tn addition to refuse collection requirements. This requires manoeuvrability of a 12.5m rigid vehicle within the site, with front loading of the vehicle. CE005616 290607 dz/bwits 11
Page 16
NY CJ Gardno Essence of Peregian Beach Eppell Olsen An assessment of the anticipated swept path for above turning movements have been conducted using AutoTURN, which is an AutoCAD based design tool. The result of the swept path assessment is shown at Appendix B. This assessment shows that: . minor amendments to the central feature island are required to accommodate access by a 12.5m rigid vehicle, as required by Council, which are shown at Appendix C; . given that a 12.5m rigid vehicle and an 8.8m HRV are able to traverse the porte cochere, access by an 8.0m mini-bus is possible; . the loading bay for the commercial building will operate as a parking bay, as it is not appropriate for vehicles to reverse into this location; . the use of contrasting pavement at the entry to the refuse area would better define the through traffic route in this area. 4.4 Bicycles The subject site is well connected for bicycles, being adjacent to the north-south route of Noosa’s bikeway network on David Low Way. This is an on-road route which connects the Peregian Beach Village and north Noosa. The Noosa Planning Scheme sets out the minimum number of bicycle parking spaces required for new developments. This includes a requirement for commercial business of: . office: 1 space per 50sq.m or part thereof of GFA; . retail: 1 space per 100sq.m or part thereof of GFA; . dining business: 1 space per 50sq.m or_part thereof of GFA. This equates to a requirement for 32 bicycle parking spaces. The site plans currently include 22 bicycle spaces within the basement. The 10 remaining spaces could be U-racks installed at ground level in front of the retail. In addition, end-of-trip cycle facilities should be provided as follows: . one locker per two bicycle parking spaces; . one shower cubicle with ancillary change rooms per 10 bicycle spaces or part thereof. This equates to 15 lockers and three shower cubicles with ancillary change rooms. It is expected that these could be accommodated within development. The Noosa Planning Scheme does not have a bicycle requirement for visitor accommodation. The basement has been designed with 18 bicycle racks where guests can store their bicycles. CE005616 290607 dz/bwits 12
Page 17
SL q Carcino Essence of Peregian Beach “~ Eppell Olsen 45 Pedestrians The proposed site plan includes pedestrian connectivity from the site to David Low Way. This is achieved via a link between the site to the north and the commercial building at a first floor level. This can be accessed directly from the first floor of the central hostel buildings or via stairs to the east of the internal access road. The Peregian Beach Village Masterplan recommends the integration of the proposed development with the village square by providing a pedestrian and visual connection. This is achieved by the abovementioned pedestrian linkage which approximately connects to the pedestrian crossing on David Low Way. Connections for pedestrians within the site between the cabins, hostel buildings and the commercial precincts are provided at ground level. CE005616 290607 dz/bwits 13
Page 18
CJ Gardno Essence of Peregian Beach Eppell Olsen 5.0 DEVELOPMENT TRAFFIC IMPACTS 5.1 Assessment Scenarios The impact of the proposed development on the operation of the following intersections has been assessed: . David Low Way/Heron Street/hotel access; . David Low Way/unnamed access road. The above intersections have been assessed for the following design traffic scenarios: . 2008 background traffic volumes; . 2018 background traffic volumes; . 2008 post development traffic volumes; . 2018 post development traffic volumes. The methodology for calculating the background traffic volumes and traffic generated by the proposed development are set out in the following sections. It is noted that the traffic surveys at David Low Way/unnamed access road included traffic generated by the current operation of the site. This traffic has not been removed from the background traffic counts. As such, the following traffic impact assessment is considered conservative. 5.2 Traffic Growth In order to predict the future background volume of traffic at the abovementioned intersections without the proposed development, a linear growth rate of 5% has been applied to the existing traffic volumes at the intersections. This growth rate is at the higher end of the typically adopted range which considered a conservative approach. This is to account for further anticipated development of the Peregian Beach Village. The calculated background traffic volumes at 2018 are shown on Figure 5.1. 5.3 Traffic Generation To determine the peak hour traffic generation of the proposed development, reference has been made to the draft ‘Transport Assessment Guide’, prepared by Eppell Olsen and Partners for the Department of Main Roads. The traffic generation rates adopted and the resultant traffic generation for the proposed development are set out in Table 5.1. CE005616 290607 dz/bw/ts 14
Page 19
LEGEND 000 AM Peak (000) Pi Peak 000 includes U-turn Drawing Title: Figure No: 5.1 Forecast 2018 Background Date: 31.05.07 Traffic Volumes Project No: CE005616 GASE1ECoreiDrawisi he Volumes_Jurie 07.odr
Page 20
Essence of Peregian Beach Eppell Olsen Table 5.1 Traffic Generation Size or Adopted Traffic . Land Use : No. of Units Generation Rate Traffic Generation Stand-Alone Cabin 30 cabins 0.4 vph/unit 12 vph Hostel Units 132 units*** 0.4 vph/unit 53 vph Office 976sq.m 3.4 vph/100sq.m 33 vph Restaurant 316sq.m 5 vph/100sq.m- 16 vph Retail 636sq.m 12.3 vph/100sq.m 78 vph Total 192 vph ** based on independently lockable units. Based on the above, it is expected that the development will generate 192vph in the road network peak hour. 5.4 Traffic Distribution In distributing the proposed development traffic on the surrounding road network, the following splits have been adopted for the peak periods: . accommodation development: - 30% in/70% out during the AM peak period; - 70% in/30% out during the PM peak period. . commercial development: - 95% in/5% out during the AM peak period; - 10% in/90% out during the PM peak period. In addition to the above, the following directional distribution has been assumed: . north to/from Noosa Heads: 60%; . south to/from Coolum: 40%. 5.5 Summary of Development Traffic Generation Based on the assumption listed above, the resultant anticipated development traffic volumes are presented on Figure 5.2. ’ The post development traffic flows anticipated at 2008 and 2018 are shown on Figure 5.3 and Figure 5.4, respectively. These volumes have been used for the purposes of assessing the traffic impacts. . CE005616 290607 dz/bwits 16
Page 21
Drawing Title: Figure No: 5.2 Ci > Cardno Development Date: 20.06.07 ~ Eppell Olsen Traffic Generation Project No: CE005616
Page 22
Cc Cardno Eppell Olsen Drawing Title: 2008 Post Development Traffic Flow LEGEND 000 AMPeak (000) PM Peak 000 Includes U-turn Figure No: 5.3 Date: 20.06.07 Project No: CE005616
Page 23
a> Cardno Eppell Olsen Drawing Title: 2018 Post Development Traffic Flow LEGEND 000 AM Peak (000) PM Peak 000 Includes U-turn Figure No: 5.4 Date: 20.06.07 Project No: CE005616
Page 24
CJ Cardno Essence of Peregian Beach Eppell Olsen 5.6 Traffic Impacts As indicated earlier, the following study intersections have been identified for assessment: . David Low Way/Heron Street/hotel access; . David Low Way/unnamed access road. Each of these intersections has been analysed for each of the scenarios outlined above using the SIDRA3.1 analysis programme. This programme calculates the operation of intersections based on input parameters, including geometry and traffic volumes. As an output SIDRA3.1 provides values for the degree of saturation (DOS), queues and delays. The DOS is a commonly used value, which is essentially a volume to capacity ratio. The typically adopted upper limits for the DOS, where it is considered that the operation of the intersection is constrained, are: : . unsignalised intersection: 0.80; . roundabouts: 0.85. A DOS exceeding these values indicates that the intersection is nearing its operational capacity. Above these values, users of the intersection are likely to experience unsatisfactory queuing and delays. The following summarises the analysis of the nominated intersections. 5.6.1 David Low Way/Heron Street This intersection is a single lane roundabout, at which the development traffic flows on the through movement are likely to exceed the 5% rule. The operation of this intersection has been assessed for both a background and a with development traffic situation. This is for the purposes of identifying the impact which the development is likely to have on the intersection operation. The results of this analysis are provided at Appendix D and are summarised in Table 5.2. CE005616 290607 dz/bw/ts 20
Page 25
CJ Cardno Essence of Peregian Beach Eppell Olsen Table 5.2 David Low Way/Heron Street/hotel access: SIDRA Analysis Results AM Peak PM Peak Scenarios 95" %le 95" %le bos Delay Queue DOs Delay Queue 2008 Background 0.48 7 sec 22m 0.44 7 sec 21m With Development 0.56 7 sec 27m 0.50 7 sec 26m 2018 Background 0.72 8 sec 51m 0.69 8 sec 54m With Development 0.83 8 sec 63m 0.74 9 sec 61m The analysis shows that the intersection of David Low Way/Heron Street/hotel access is capable of accommodating the traffic which is likely to be generated by the proposed development. 5.6.2 .David Low Way/Unnamed Access Road The intersection of the unnamed road providing access to the development. with David Low Way has been assessed. In recognition that the median is wide enough to store a right turning vehicle, it has been considered that a staged right turn is possible at this location. As such, the assessment has been based on basic gap acceptance theory (as per the ‘Traffic Engineering Practice’, Ogden and Bennett) and a spreadsheet analysis too! which has been developed by Cardno Eppell Olsen. The results of this analysis, which shows the results for the turning movements only (i.e. not the through movements) can be found at Appendix D and are summarised in Table 5.3. Table 5.3 David Low Way/Unnamed Access Road: Analysis Results Scenarios | AM Peak: DOS PM Peak: DOS Background 0.02 0.01 2008 With Development 0.12 0.15 2018 Background 0.04 0.02 With Development 0.21 0.17 The analysis shows that the T-intersection as it is currently formed is capable of accommodating the traffic which is likely to be generated by the proposed development. This is, in part, due to the ability for a vehicle turning right out of the unnamed access road to complete a two-part turn by propping within the central median. CE005616 290607 dz/bwits 21
Page 26
CJ Gardno Essence of Peregian Beach ~ Eppell Olsen 6.0 CONCLUSIONS This report discusses the traffic impacts and car parking requirements for a proposed commercial and accommodation development located in Pergian Beach, known as “Essence of Peregian Beach”. This development incorporates a commercial building, with retail and a restaurant at ground level and office at first floor, fronting David Low Way and an affordable accommodation resort adjacent to the Noosa National Park. Based on the car parking requirements set out within the Noosa Planning Scheme, 120 car parking spaces are required for the commercial building, with 62 car parking spaces required for the accommodation. The car parking provision for the accommodation precinct is one space short of the car parking requirement, not considering the supply of the porte cochere. The analysis indicates that the car parking supply for the commercial precinct is 18 spaces short of the requirement, or two spaces short when consideration is given to temporal demands. The proposed car parking provision is expected to be adequate, given: . it is expected that there will be a cross-utilisation of the restaurant and retail components with the accommodation precinct; . the porte cochere for the accommodation precinct is capable of accommodating a 12.5m bus, which is larger than the requirements of Council and makes it possible for large tour groups (i.e. OZ Experience) to stay on the site; . a total of 40 bicycle parking spaces are proposed for the combined development; . the car parking demands for the restaurant will peak at a different times to the office components. A review of the car parking layout indicated that, subject to car spaces #49 and #50 within the commercial car parking basement being deleted, the car parking layout is expected to operate adequately. Bicycle parking for 22 bicycles is proposed within the basement of the commercial building. It is considered a further 10 spaces could be provided at ground level as U-racks. In addition, 18 bicycle racks are proposed within the basement of the accommodation buildings. CE005616 290607 dz/bwits 22
Page 27
Essence of Peregian Beach Eppell Oisen A review of the service vehicle accessibility indicates that: . minor amendments to the central feature island are required to accommodate access by a 12.5m rigid vehicle; . the loading bay for the commercial building will operate as a parking bay, as it is not appropriate for vehicles to reverse into this location; . the use of contrasting pavement at the entry to the refuse area would better define the through traffic route in this area. The development is likely to generate some 192 vehicle movements in the road network peak hours. An assessment of the operation of key intersection in the vicinity of the site indicates that the subject intersections are capable of accommodating the traffic which is likely to be generated by the proposed development. CE005616 290607 dz/bwits 23
Used in these records
20517 App L.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.