Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

20517 App L.pdf [As Published] · 132007.1259

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Sp) Cardno

Essence of Peregian Beach Eppell Olsen

 

In terms of the car parking demands for the commercial precinct, it is expected that the peak
parking demands associated for the restaurant and those associated with the office will occur
at different times of the day. During the weekday lunchtime period, when the office is
expected to be fully operational, the restaurant is only expected to be achieving 50% of its
peak parking demand. Conversely, when the restaurant is fully occupied, either in the evening
or the weekend periods, the car parking demands associated with the office are expected to
be negligible.

Table 4.2, below, has therefore been prepared to indicate the likely peak demands for the
commercial precinct, considering the temporal demands.

Table 4.2 Commercial Car Parking Requirements Considering Temporal Demands

 

 

 

 

 

 

 

 

 

 

Car Parking Usage
Use Car Parking Weekday Lunch Weekend Lunch/Evening
Requirement
% Expected Car % Expected Car
Utilisation | Parking Demand | Utilisation | Parking Demand
Office 49 spaces 100% 49 spaces NIL NIL
Shop 39 spaces 100% 39 spaces 100% 39 spaces
Restaurant 32 spaces 50% 16 spaces 100% 32 spaces
Total 120 spaces 104 spaces 71 spaces

 

 

 

 

The above indicates that the car parking associated with the commercial development is
expected to peak at 104 cars, given the temporal demands.

The proposed car parking. provision is expected to be adequate, given:

. it is expected that there will be a cross-utilisation of the restaurant and retail
components with the accommodation precinct;
. the porte cochere for the accommodation precinct is capable of accommodating a

12.5m bus, which is larger than the requirements of Council and makes it possible
for large tour groups (i.e. OZ Experience) to stay on the site;

. a total of 40 bicycle parking spaces are proposed for the combined development;

° as indicated in Table 4.2, the car parking demands for the restaurant will peak at a
different times to the office components.

 

CE005616 290607 dz/bwits 10

 

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App L.pdf [As Published].pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.