Compiled Reference Documents - OPW25/0053 (As Published)
About this Report
Site Anomalies
In the event that conditions encountered on
site during construction appear to vary from
those which were expected from the
information contained in the report, DP
requests that it be immediately notified. Most
problems are much more readily resolved
when conditions are exposed rather than at
some later stage, well after the event.
Information for Contractual Purposes
Where information obtained from this report
is provided for tendering purposes, it is
recommended that all information, including
the written report and discussion, be made
available. In circumstances where the
discussion or comments section is not relevant
to the contractual situation, it may be
appropriate to prepare a specially edited
document. DP would be pleased to assist in
this regard and/or to make additional report
copies available for contract purposes at a
nominal charge.
Site Inspection
The company will always be pleased to provide
engineering inspection services for
geotechnical and environmental aspects of
work to which this report is related. This could
range from a site visit to confirm that
conditions exposed are as expected, to full
time engineering presence on site. intentionally blank
intentionally blank
2 of 2 www.douglaspartners.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.