Original source · versioned page text
Civil Response
10 May 2022
The other lots are intended to have the following stormwater connections:
• Lot 1, 2, 3 – kerb adapter connections to Butler Street
• Lot 5 – Kerb adapter connection to Ghostgum Court
Refer to drawing DA.01 in Appendix 3 of the Stormwater Management Plan prepared by
MPN Consultants for details of the proposed stormwater connections.
Rational Method Calculations have been undertaken for the pre-development and post-
development flows to the south west of the site. The results indicate that the peak flows are
non-worsening from the pre-development scenario to the post-development scenario. Refer
Table 1 below and the attached calculations for details.
South West Catchment
Peak Flows (m3/sec)
Average 2 5 10 20 50 100
Recurrence
Interval (Years)
Site Pre- 0.031 0.043 0.050 0.059 0.075 0.086
Development
Site Post- 0.024 0.033 0.038 0.046 0.058 0.066
Development
Table 1 – Rational Method Flows
Attached for your reference are:
• Pre-development catchment sketch
• Rational method calculations
Yours faithfully
Sam Rowen
For and on behalf of
MPN CONSULTING PTY LIMITED
sr:sr
Excellence with Economy in Engineering 2
l:\9000-9999\9200-9299\9279\rfi\10-05-22 nsc rfi response.docx