Original source · versioned page text
Civil Response
83 Butler St, Tewantin QLD 4565 Rational Method Calculations File: 9279 Date: 06/05/22 Stormwater Drainage Runoff - Calculations Unit Value Reference / Comments Existing condition Average Recurrence Interval (ARI) Years 2 5 10 20 50 100 Area ha 0.107 0.107 0.107 0.107 0.107 0.107 Existing predeveloped lot catchment to west fi 0.250 0.250 0.250 0.250 0.250 0.250 C10 0.75 0.75 0.75 0.75 0.75 0.75 QUDM Table 4.5.3 Fy 0.85 0.95 1 1.05 1.15 1.2 QUDM Table 4.5.2 Cy = Fy * C10 0.6375 0.7125 0.75 0.7875 0.8625 0.9 Time of concentration (tc) minutes 5 5 5 5 5 5 QUDM Table 4.6.3 residential Rainfall Intensity (I) mm / hr 163 201 223 253 292 322.0 Qpost (Peak Runoff) = (C*I*A)/360 m3 / s 0.031 0.043 0.050 0.059 0.075 0.086 Stormwater Drainage Runoff - Calculations Unit Value Reference / Comments Developed Condition Average Recurrence Interval (ARI) Years 2 5 10 20 50 100 Area ha 0.0744 0.0744 0.0744 0.0744 0.0744 0.0744 Post development Lot 4 QUDM table 4.5.1 - Urban residential - lot density excluding fi 0.750 0.750 0.750 0.750 0.750 0.750 roads (max value in range given in table.) C10 0.83 0.83 0.83 0.83 0.83 0.83 QUDM Table 4.5.3 Fy 0.85 0.95 1 1.05 1.15 1.2 QUDM Table 4.5.2 Cy = Fy * C10 0.7055 0.7885 0.83 0.8715 0.9545 0.996 Time of concentration (tc) minutes 5 5 5 5 5 5 QUDM Table 4.6.3 residential Rainfall Intensity (I) mm / hr 163 201 223 253 292 322.0 Qpost (Peak Runoff) = (C*I*A)/360 m3 / s 0.024 0.033 0.038 0.046 0.058 0.066
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.