Skip to the record
The only place to find full transcripts.

Council archive · source document

Operational Works Application OPW19-0053 · OPW19/0053

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Matters requiring referral to the chief executive of the distribution entity or transmission entity:
Ol Electricity? infrastructure

 

Matters requiring referral to:
e The Chief executive of the holder of the licence, if not an individual
¢ The holder of the licenée, if the holder of the licence is an individual
(J Oil and gas infrastructure N

Matters requiring referral to the Brisbane City Council:

(J Brisbane core port land SN

Matters requiring referral to the Minister under ‘the Transport Infrastructure Act 1994:
(Zl Brisbane core port land (inconsistent with Brisbane port LUP for transport reasons)
C Strategic port land NS

Matters requiring referral to the relevant port operator: NN

(J Land within Port of Brisbane’s port limits (below high-water mark)

 

 

 

 

Matters requiring referral to the Chief Executive of the relevant port authority:
(J Land within limits of another port (below high-water mark) NN

 

Matters requiring referral to the Gold Coast Waterways Authority: NN
(J Tidal works, or work in a coastal management district in Gold Coast waters

 

Matters requiring referral to the Queensland Fire and Emergency Service:

 

(J Tidal works marina (more than six vessel berths) 5

18) Has any referral agency provided a referral response for this development application?

(1 Yes - referral response(s) received and listed below are attached to this development application
—KI No

Referral requirement Referral agency Date of referral response

 

 

 

 

 

 

 

Identify and describe any changes made to the proposed development application that was the subject of the
referral response and the development application the subject of this form, or include details in a schedule to this
development application (if applicable).

 

 

 

 

PART 6 — INFORMATION REQUEST

   

  
 
   

19) Information request under Part 3 of the DA Rules

      
  
     
     
 

  

| agree to receive an information request if determined necessary for this development application
(11 do not agree to accept an information réquest for this development application
Note: By not agreeing to accept an information request |, the applicant, acknowledge:

« that this development application will be assessed and decided based on the information provided when making this development application
and the assessment manager and any referral agencies relevant to thé-development application are not obligated under the DA Rules to
accept any additional information provided by the applicant for the develop. t application unless agreed to by the relevant parties

* Part 3 of the DA Rules will still apply if the application is an application listed me. ection 11.3 of the DA Rules.

Further advice about information requests is contained in the DA Forms Guide. ae

 

  

       
   

 

Page 7
DA Form 1 — Development Application details
Version 1.4-— 22 JUNE 2018

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Operational Works Application OPW19-0053.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.