Council archive · source document
Reference Document - MCU26/0012 & OPW26/0034 (As Published) · MCU26/0012.01
slopes of the spur (where the gym is proposed) were at around 6°, with landscaping and the original
earthworks cut adjacent to the house steepened to about 10°.
Downslope of the existing residence a garden terrace had been formed by fill earthworks, which also
contained an in-ground swimming pool. The fill was estimated to be about 1.2 m height above natural
ground, and had been left battered at about 16° to 17°.
Ground slope angles were measured at the time of our site visit using a hand-held clinometer.
Site conditions at the time of our walk-over are shown in Text Figures 5 to 7 below, and on the following
page.
Text Figure 5: Looking east across site of proposed residence
13 February 2026
26020-001-Rev0 5 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - MCU26/0012 & OPW26/0034 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.