Council archive · source document
Response to Info Request - Attachment 4a - Engineering Report Part 1 MCU18-0015 & RAL18-0001 · MCU18/0015
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
A conceptual layout of the treatment train as input to the MUSIC Model is shown in Figure
7.3.1a below.
Figure 7.3.1a: MUSIC Model Layout
The locations and details of the water quality treatment devices are shown on Engineering
Drawings C5756/18/P33, attached as Appendix C.
The Rainfall Runoff Parameters for the source catchments have been taken from Water
By Design’s – MUSIC Modelling Guidelines, Version 1.0 2010 and are shown in Table 7.3.1b
below.
Table 7.3-1b: Rainfall Runoff Parameters
Rainfall Threshold mm/day 1
Pervious Area Properties
Soil Storage Capacity (mm) 500
Initial Storage (% of Capacity) 10
Field Capacity (mm) 200
Infiltration Capacity Coefficient - a 211
Infiltration Capacity Exponent - b 5.0
Groundwater Properties
Initial Depth (mm) 50
Daily Recharge Rate (%) 28.0
Daily Baseflow (%) 27.0
Daily Deep Seepage Rate (%) 0.0
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info Request - Attachment 4a - Engineering Report Part 1 MCU18-0015 & RAL18-0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.