During the operational phase, frequent flow management will be achieved using
rainwater harvesting and proprietary water quality treatment devices which will capture
frequent minor storm events. All stormwater outlets to the existing flow path will be
provided with appropriate scour protection and flow dissipation devices.
14.0 CONCLUSION
The proposed development at 27 Attunga Heights, Noosa Heads can be readily serviced
by existing infrastructure available at or near the subject site.
Water quality management will be provided for the site in accordance with Council’s
Planning Scheme Policy. Stormwater quantity management (peak flow management) is
not required for the development site. Stormwater connection points are available for
the site and external upstream catchments.
There are no constraints or impediments to the proposed residential development that
cannot be overcome by sound engineering design and best practice construction
methods.
20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info Request - Attachment 4a - Engineering Report Part 1 MCU18-0015 & RAL18-0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.