Skip to the record
Accept no substitutions.

Council archive · source document

RFI - Attachment F - Revised Architectural Plans · MCU25/0053

of 16

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                  GENERAL NOTES
                                                                                                                                                                                                                                                                                  VERIFY ALL DIMENSIONS AND LEVELS BEFORE COMMENCING WORK. DO NOT SCALE FROM DRAWING.

                                                                                                                                                                                                                                                                                  COPYRIGHT
                                                                                                                                                                                                                                                                                  THE COPYRIGHT OF THESE DOCUMENTS AND ALL WORKS EXECUTED FROM THESE DOCUMENTS



    PROPOSED RESIDENCE
                                                                                                                                                                                                                                                                                  SHALL REMAIN THE PROPERTY OF THE ARCHITECT OR ON CREATION VEST IN THE ARCHITECT.
                                                                                                                                                                                                                                                                                  THESE DOCUMENTS MAY ONLY BE USED TO PRODUCE THE PROJECT FOR THE CLIENT AND IN THE
                                                                                                                                                                                                                                                                                  LOCATION DESCRIBE HEREON



                                                                                                                                                                                                                                                                                   6               MCU RFI RESPONSE                                                    22.09.25



    7 NOOSA PARADE
                                                                                                                                                                                                                                                                                   5               CONSULTANT ISSUE                                                    02.05.25
                                                                                                                                                                                                                                                                                   4               CONSULTANT ISSUE                                                    30.04.25
                                                                                                                                                                                                                                                                                   3               UPDATED BASEMENT, STRUCTURE                                         11.03.25
                                                                                                                                                                                                                                                                                   2               GENERAL UPDATES                                                     30.01.25
                                                                                                                                                                                                                                                                                   1               CONSULTANT COORDINATION                                             16.01.25

                                                                                                                                                                                                                                                                                   REV DESCRIPTION                                                                     DATE
                                                                                                                                                                                                                                                                                   REVISION SCHEDULE




                                                                                                                                                                                                                                                                                   DRAWING LIST
                                                                                                                                                                                                                                                                                   NO.    TITLE                                                                         REV.

                                                                                                                                                                                                                                                                                   00 SERIES - COVER SHEET
                                                                                                                                                                                                                                                                                   00.01    COVER SHEET AND LOCALITY PLAN                                               6

                                                                                                                                                                                                                                                                                   10 SERIES - SITE INFO
                                                                                                                                                                                                                                                                                   10.01    SITE PLAN - EXISTING, GRID SETOUT &                                         4
                                                                                                                                                                                                                                                                                            PROPOSED

                                                                                                                                                                                                                                                                                   20 SERIES - AREA PLANS
                                                                                                                                                                                                                                                                                   20.01    AREA PLANS                                                                  7

                                                                                                                                                                                                                                                                                   21 SERIES - GENERAL ARRANGEMENT PLANS
                                                                                                                                                                                                                                                                                   21.02    G.A. GROUND FLOOR PLAN                                                      9
                                                                                                                                                                                                                                                                                   21.01    G.A. BASEMENT PLAN                                                          10
                                                                                                                                                                                                                                                                                   21.03    G.A. FIRST FLOOR PLAN                                                       8
                                                                                                                                                                                                                                                                                   21.04    G.A. ROOF PLAN                                                              7

                                                                                                                                                                                                                                                                                   30 SERIES - G.A. ELEVATIONS
                                                                                                                                                                                                                                                                                   30.01    NORTH & SOUTH ELEVATIONS                                                    7
                                                                                                                                                                                                                                                                                   30.02    EAST & WEST ELEVATION                                                       7

                                                                                                                                                                                                                                                                                   40 SERIES - G.A. SECTIONS
                                                                                                                                                                                                                                                                                   40.01    SECTIONS 1 & 2                                                              9
                                                                                                                                                                                                                                                                                   40.02    SECTIONS 3 & 4                                                              7
                                                                                                                                                                                                                                                                                   40.03    SECTIONS 5 & 6                                                              7
                                                                       GENERAL NOTES:                                                     SITE:                                                               TERMITE MANAGEMENT NOTES:
                                                                       1.  ALL BUILDING WORK MUST COMPLY WITH NATIONAL CONSTRUCTION       1.   DRAWING TO BE READ IN CONJUNCTION WITH SURVEY DRAWINGS,        1.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT
                                                                           CODE (NCC) OF AUSTRALIA, RELEVANT GOVERNMENT APPROVALS,             CONTOUR AND DETAIL SURVEY 10529-Det, AND NATURAL GROUND             ADEQUATE MEASURES ARE TAKEN IN MITIGATING THE RISK OF
                                                                           AUTHORITY / DA CONDITIONS, ALL STATUTORY AUSTRALIAN                 SURVEY 10529-NG GROUND LEVEL CONTOURS, PREPARED BY                  TERMITE DAMAGE TO EXISTING AND PROPOSED BUILDINGS AND
                                                                           STANDARDS AND ALL SPECIFIED AUSTRALIAN STANDARDS (AS).              SKYLINE SURVEYORS PTY LTD. CHECK FOR CURRENT                        STRUCTURES.
                                                                       2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL                REVISION BEFORE COMMENCING WORK.                               2.   THIS REQUIRES COMPLIANCE WITH THE NCC, VOLUME 2, PART 3.1.4,
                                                                           CONSULTANT DRAWINGS, SPECIFICATIONS, SCHEDULES AND                                                                                      WHICH OUTLINES THE NATIONAL REQUIREMENTS, AND ALL
                                                                           REPORTS.                                                       2.   ACTUAL DIMENSIONS AND LAYOUTS MAY VARY SLIGHTLY FROM                APPROPRIATE AUSTRALIAN STANDARDS, INCLUDING AS 3660.1 AND AS
                                                                       3. REFER TO THE NCC / BCA ASSESSMENT REPORTS AND APPROVALS.             THOSE INDICATED. VERIFY ALL SURVEY INFORMATION AND THE              3660.2.
                                                                       4. REFER TO ALL ARCHITECTURAL AND INTERIOR SCHEDULES FOR                LOCATION OF ALL AS BUILT EXISTING FORM AND SERVICES BEFORE     3.   THE PROPOSED TERMITE MANAGEMENT STRATEGY MUST BE
                                                                           MATERIALS, FINISHES, FFE, SYSTEMS, AND LININGS.                     COMMENCING WORK ON SITE.                                            SUBMITTED AND REVIEWED BY THE OWNER, BUILDING CERTIFIER AND
                                                                       5. REFER TO ALL ARCHITECTURAL AND INTERIOR DRAWINGS,                                                                                        ARCHTIECT PRIOR TO PURCHASING OR INSTALLATION OF THE
                                                                           SCHEDULES                                                      3.   SETOUT OF THE BUILDING WORKS IS TO BE UNDERTAKEN AND                SYSTEM, TO ALLOW FOR COORDINATION.
                                                                           AND SPECIFICATIONS.                                                 CERTIFIED BY A LICENCED SURVEYOR. CONDUCT A BOUNDARY
                                                                       6. THESE DRAWINGS HAVE BEEN PREPARED FROM THIRD PARTY                   IDENTIFICATION SURVEY TO LOCATE BUILDINGS, SITE BOUNDARIES
                                                                           INFORMATION.                                                        AND BOUNDARY FENCES PRIOR TO EXECUTION OR CONSTRUCTION OF
                                                                       7. REVIEW AND CONFIRM SURVEY INFORMATION, AND CONFIRM ALL               ANY WORKS.
                                                                           DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING WORK.
                                                                       8. SECURE THE BUILDING SITE TO THE SATISFACTION OF THE
                                                                           WORKPLACE HEALTH AND SAFETY ACT.
                                                                       9. INSTALL EROSION AND SEDIMENT CONTROL MEASURES TO THE
                                                                                                                                          DEMOLITION NOTES:
                                                                           SATISFACTION OF THE LOCAL AUTHORITY.                           1.   MAKE GOOD ALL FLOORS, WALLS, CEILINGS, AND OTHER SURFACES
                                                                       10. PROTECT EXISTING SIGNIFICANT TREES, SHRUBS ABD OTHER                WHERE AFFECTED BY DEMOLTION WORKS.
                                                                           LANDSCAPE FEATURES ON SITE AS DIRECTED. SEEK APPROVAL FROM     2.   NOTIFY THE OWNER IMMEDIATELY SHOULD ASBESTOS, OR ANY
                                                                           THE LOCAL AUTHORITY PRIOR TO REMOVAL OF ANY TREES.                  ASBESTOS PRODUCTS BE SUSPECTED OR DETECTED ON THE SITE.
                                                                       11. FALL ALL EXTERNAL GROUND SURFACES AWAY FROM THE BUILDING            DETECTION AND REMOVAL OF ASBESTOS IS THE RESPONSIBILITY OF
                                                                           50mm IN THE FIRST METRE                                             THE OWNER.
                                                                       12. MASONRY CONSTRUCTION TO COMPLY WITH AS 3700                    3.   PROVIDE TEMPORARY SUPPORT TO FLOORS, WALLS AND ROOFS
                                                                       13. SUBFLOOR VENTILATION TO COMPLY WITH NCC                             WHERE NECESSARY DURING DEMOLITION AND CONSTRUCTION.
                                                                       14. THE CONTRACTOR IS RESPONSIBLE FOR THE PROVISION OF ALL         4.   ERECT TEMPORARY HOARDING, SCAFFOLDING, BARRICADES OR
                                                                           NECESSARY PACKERS, STIFFENERS, NAIL PLATES AND SUPPORT              SAFETY FENCES TO PROTECT OPENINGS AND UNSTABLE STRUCTURE
                                                                           MEMBERS REQUIRED TO FRAME AND CLAD THE BUILDING.                    ACCORDINGLY.
                                                                       15. THE CONTRACTOR IS TO ALLOW TO PACK OUT WALLS AS REQUIRED       5.   SALVAGE ALL DOORS, WINDOWS, LIGHT FITTINGS, AND OTHER
                                                                           TO                                                                  FITTINGS AND FIXTURES AS DIRECTED BY THE OWNER.
                                                                           ACHIEVE A FLUSH AND PLUMB FINISH.                              6.   REMOVE ALL REDUNDANT SERVICES, INCLUDING ELECTRICAL AND
                                                                       16. REFER SECTION J ENERGY EFFICIENCY ASSESSMENT REPORT FOR             LIGHT FITTINGS, FIXTURES AND CABLING AS REQUIRED.
                                                                           ESD
                                                                           REQUIREMENTS INCLUDING INSULATION AND GLAZING.
                                                                       17. WALL AND CEILING SYSTEMS SELECTED REQUIRE LAGGING TO ALL
                                                                                                                                          WATERPROOFING NOTES:
                                                                           WASTE / STORMWATER PIPES TO ACHIEVE ACOUSTIC SEPARATION.
                                                                       18. WALL AND CEILING SYSTEMS SELECTED REQUIRE SEPARATION           1.   WATERPROOFING MEMBRANES SHOWN ON THE ARCHITECTURAL
                                                                           BETWEEN WASTE / STORMWATER PIPES AND FACE OF                        DRAWINGS ARE INDICATIVE ONLY; ACTUAL SCOPE AND EXTENT MAY
                                                                           PLASTERBOARD,                                                       VARY.
                                                                           TO ACHIEVE ACOUSTIC SEPARATION.                                2.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT
                                                                       19. ALL EXISTING SERVICES SHOWN ARE TO BE LOCATED ON SITE BY THE        ADEQUATE MEASURES ARE TAKEN IN MITIGATING THE RISK OF WATER
                                                                           CONTRACTOR PRIOR TO EXCAVATION OR CONSTRUCTION. EXISTING            ENTRY INTO EXISTING AND PROPOSED BUILDINGS AND STRUCTURES,
                                                                           SERVICES REPRESENTED ON DRAWINGS INDICATE APPROXIMATE               AND TO ALLOW FOR ALL REQUIRED WATERPROOFING MEASURES AND
                                                                           POSITIONS ONLY.                                                     SYSTEMS.
                                                                       20. LOCATE ALL SUBTERRANEAN SERVICES BY HAND.                      3.   WATERPROOFING SYSTEMS ARE TO ENSURE THAT WATER DOES NOT
                                                                       21. THE CONTRACTOR IS TO LIAISE WITH ALL SERIVCE AUTHORITIES            PENETRATE INTO THE BUILDING.
                                                                           PRIOR                                                          4.   THIS REQUIRES COMPLIANCE WITH THE NCC, VOLUME 2, PART 3.8.1,
                                                                           TO THE DISCONNETION AND CONNECTION OF EXISTING AND NEW
                                                 E
                                                                                                                                               WHICH OUTLINES THE NATIONAL REQUIREMENTS, AND ALL

                                                D                          SERVICES.

                                             RA
                                                                                                                                               APPROPRIATE AUSTRALIAN STANDARDS, INCLUDING AS 3740, AS
                                                                       22. THE CONTRACTOR IS RESPONSIBLE FOR THE WATERTIGHTNESS OF             4654.1,
                                          A
                                        AP
                                                                           THE BUILDING AND MUST PROVIDE FLASHING, CAPPING,                    AND AS 4654.2.

                                       S
                                                                           COMPRESSIBLE SEALS, TANKING AND DAMP PROOF COURSING            5.   THE CONTRACTOR IS TO REFER TO THE WATERPROOFING SYSTEM

                                     O                   NOOSA INLET       REQUIRED TO PREVENT THE ENTRY OF MOISTURE INTO THE BUILDING.

                                NO
                                                                                                                                               SPECIFICATION, PREPARED BY ARDEX; AND INSTALL THE SPECIFIED
                                                                       23. DAMP PROOFING OF THE BUILDING IS REQUIRED IN ACCORDANCE             SYSTEMS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
                                                                           WITH                                                                WRITTEN INSTRUCTIONS AND DETAILS.
                                                                           NCC AND AUSTRALIAN STANDARDS.                                  6.   ALL WATERPROFING SYSTEMS MUST BE INSTALLED BY AN
                                                     5                 24. ALL WET AREAS THROUGHOUT THE BUILDING ARE REQUIRED TO BE IN
                                                                           ACCORDANCE WITH NCC AND AUSTRALIAN STANDARDS.
                                                                                                                                               ACCREDITED
                                                                                                                                               SUB-CONTRACTOR, TO ENSURE WARRANTY CONDITIONS ARE MET.
                                                                       25. ALL GLAZING IS REQUIRED TO BE IN ACCORDANCE WITH NCC,          7.   THE PROPOSED WATERPROOFING STRATEGY, SYSTEM TERMINATION
                                                                           AUSTRALIAN STANDARDS AND SECTION J REQUIREMENTS.                    DETAILS, AND DETAILS OF LAPPING IN SYSTEMS MUST BE SUBMITTED
                                                                                                                                                                                                                                                                                  bureau^proberts PTY LTD
                                                                       26. ALL GLAZING TO MEET THE MINIMUM ACOUSTIC STANDARD AS                AND REVIEWED BY THE OWNER, BUILDING CERTIFIER AND ARCHTIECT                                                                        ABN 53 073 087 993 ACN 073 087 993
                                                                           SETDOWN IN THE ACOUSTIC ENGINEER'S REPORT IF PROVIDED.              PRIOR TO PURCHASING OR INSTALLATION OF THE SYSTEM, TO ALLOW                                                                        LEVEL 14, 100 CREEK STREET, BRISBANE QLD 4000, GPO Box 3204 QLD 4001
                                                                       27. ALL OPERABLE WINDOWS IN BEDROOMS ARE TO BE FITTED WITH                                                                                                                                                 P: 07 3221 0672 F: 07 3221 0683 EMAIL : [email protected] www.bureauproberts.com.au
                                                                                                                                               FOR COORDINATION.
                                                                           RESTRICTORS ENSURING A MAXIMUM OPENING OF 120mm.                                                                                                                                                       CLIENT:
                                                                       28. REFER TO RCP'S AND POWER AND DATA LAYOUT PLANS FOR NOTES,
                                                                           OUTLET ARRANGEMENTS, OUTLET MOUNTING HEIGHT, SWITCH            FIRE RATINGS:                                                                                                                           SEYMOUR GROUP
                                                                           LOCATION AND DIMENSIONS.                                                                                                                                                                               PROJECT:
                                                                       29. ALL STRUCTURAL & NON-STRUCTURAL BUILDING ELEMENTS
                                                                           (INCLUDING
                                                                                                                                                             FRL 60/60/60 (60 MINUTES FROM OUTSIDE)
                                                                                                                                                             OR; BE CONSTRUCTED OF MASONRY VENEER                                                                                 NOOSA RESIDENCE
                                 5                                         WALLS AND PARTITIONS; CEILINGS AND SERVICES) TO RESIST                            CONSTRUCTION IN WHICH THE EXTERNAL MASONRY                                                                           ADDRESS:
                                                                           EARTHQUAKE FORCES TO MEET THE NCC AND AUSTRALIAN
                                                                           STANDARDS REQUIREMENTS.
                                                                                                                                                             VENEER IS NOT LESS THAN 90mm THICK;
                                                                                                                                                             OR; BE OF MASONRY CONSTRUCTION NOT LESS                                                                              7 NOOSA PARADE
                                                                       30. ALL SYSTEMS AND MATERIALS TO COMPLY WITH STATUTORY                                THAN 90mm THICK.
                                                                           REQUIREMENTS AND TO SUIT SITE CONDITIONS.                                         IN ACCORDANCE WITH NCC VOLUME 2, PART 3.7.2
                                                                       31. ALL STRUCTURAL STEEL TO BE HOT DIPPED GALVANISED, REFER
                                                                                                                                                                                                                                                                                  DRAWN BY:                                                                                  NORTH:
                                                                           STRUCTURAL ENGINEERS DETAILS, UNLESS NOTED OTHERWISE.          FIRE PROTECTION:                                                                                                                                                                 TH
                                       WIT




                                                                       32. ALL EXPOSED CONCRETE WALLS / COLUMNS TO BE CLASS 2 FINISH,
                                                                                                                                                                                                                                                                                  CHECK BY:
                                                                           ANY BACK OF HOUSE CONCRETE WALLS / COLUMNS TO BE CLASS 3       1.   INSTALL SMOKE ALARMS IN ACCORDANCE WITH THE NCC,
                                                                                                                                                                                                                                                                                                                           JC
                                                                           FINISH, REFER STRUCTURAL ENGINEERS DETAILS, UNLESS NOTED            AUSTRALIAN
                                         TA




                                                                                                                                                                                                                                                                                  PROJECT
                                                                           OTHERWISE.                                                          STANDARDS, AND STATE REGULATIONS AND LEGISLATION.
                                                                                                                                                                                                                                                                                  ARCHITECT                                JC
                                                                       33. DISCONTINUOUS CONSTRUCTION TO BE ACHIEVED TO NATIONAL          2.   NO COMBUSTIBLE MATERIALS TO BE USED IN INSTALLATION OF FIRE
                                            C




                                                                           CONSTRUCTION CODE REQUIREMENTS, AS REQUIRED.                        RATED SYSTEMS. STAGGER JOINTS IN EACH LAYER OF CLADDING.                                                                           DESIGN
                                                                                                                                                                                                                                                                                  ARCHITECT                                AB
                                              IR




                                                                       34. SAMPLES, PROTOTYPES & SHOP DRAWINGS TO BE MADE AVAILABLE       3.   ALL PENETRATIONS IN FIRE RATED FLOORS, WALLS OR CEILINGS ARE
                                                                           TO                                                                  REQUIRED TO BE FORMED UP, LINED AND FIRE SEALED TO MAINTAIN                                                                                                                                                                       SCALE:
                                                                           THE OWNER & ARCHITECT PRIOR TO BEING REQUIRED FOR SITE.             THE INTEGRITY OF THAT PART, IN ACCORDACNE WITH THE NCC AND                                                                                                                                           50           1 : 1000 [A1]
                                                                       35. CONTRACTOR TO PROVIDE ALL TEST DATA AND REPORTS TO THE              AUSTRALIAN STANDARDS.
                                                                           CERTIFIER.                                                     4.   THE FIRE RATING OF ANY SHAFT THROUGHOUT THE BUILDING IS                                                                            DRAWING TITLE:
                                                                       36. ALL BALUSTRADES TO BE NON CLIMBABLE AND INSTALLED WITH A            REQUIRED TO BE NO LESS THAN THE HIGHEST FRL REQUIRED
                                                                           1050mm MINIMUM HEIGHT OR HIGHER ABOVE FFL, REFER TO
                                                                           BALUSTRADE DRAWINGS.
                                                                                                                                               BETWEEN THE STOREYS IT PASSES THROUGH. OPENINGS IN THE
                                                                                                                                               SHAFT MUST BE PROTECTED IN ACCORDANCE THE NCC AND
                                                                                                                                                                                                                                                                                  COVER SHEET AND LOCALITY PLAN
                                                                       37. ALL SWIMMING POOL FENCING AND BALUSTRADES TO BE NON                 AUSTRALIAN STANDARDS.
                                                                           CLIMBABLE AND INSTALLED WITH A 1200mm MINIMUM HEIGHT OR        5.   CONSTRUCTION JOINTS IN FLOORS, WALLS, AND CEILINGS MUST BE
                                                                           HIGHER ABOVE FFL, IN ACCORDANCE WITH THE NCC, AUSTRALIAN            CONSTRUCTED TO MAINTAIN THE FIRE INTEGRITY OF THE PART IN                                                                          CAD FILE REF:                                                                                   DATE:
                                                                           STANDARDS AND QDC.                                                  ACCORDANCE WITH THE NCC AND AUSTRALIAN STANDARDS.                                                                                  C:\_Revit Local\24048_7 Noosa Parade_B.A_larissaf4R2ZR.rvt
                                                                                                                                                                                                                                                                                                                                                                         22.09.25
                                                                       38. PROVIDE A TERMITE BARRIER SYSTEM.                                                                                                                                                                      PROJECT NO:                             PHASE:               DRAWING NUMBER:              REVISION:
                                                                       39. ALL WALLS, PARTITIONS AND CEILINGS TO ALLOW FOR STRUCTURAL
                                                                           DEFLECTION, STRUCTURAL MOVEMENT & WIND PRESSURES.
                                                                       40. CONTRACTOR TO CONFIRM ALL NOMINAL (NOM.) AND CHECK ON SITE                                                                                                                                             24048                                        B.A.            AR 00.01                             6
     LOCALITY PLAN - PROPOSED                                          41. (C.O.S) DIMENSIONS AND SETOUT PRIOR TO COMMENCING WORKS.                                                                                                                                                                                                                                   22/09/2025 3:36:53 PM

1    1 : 1000

Used in these records

About this file

File size
7.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment F - Revised Architectural Plans.pdf · 7.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.