Appendix M - Ecology Report
34
Benchmarks have been included in this Detailed Ecological Assessment and S5
Environmental’s Natural Hazard Assessment.
COUNCIL PERMITS AND APPROVALS (ENVIRONMENTAL)
Development Approval WILL be required It is understood that the implications of the planning scheme for development will be
from Noosa Shire Council; reviewed by a qualified Town Planner;
In accordance with The Noosa Plan, the S5 Environmental understands that the proposal will be assessed against the
site is within the Rural and Rural requirements of The Noosa Plan; and
Settlement Zones; - The proposal will be required to meet the Biodiversity Overlay and Natural
Under The Noosa Plan the site is Hazard Codes;
mapped within the following: - S5 Environmental have prepared a Natural Hazard Assessment and
- Biodiversity Overlay and Management Plan for the site (S50335ER002, October 2017).
- Natural Hazard Overlay.
STORMWATER, POLLUTANTS AND EROSION
Unmanaged site stormwater runoff during It is recommended that appropriate sediment and erosion controls are in place prior
construction may carry sediment and to and during construction works;
pollutants into the local stormwater With appropriate control measures in place, impacts upon downstream waterways
networks and waterways, which may are expected to be negligible;
bring about deterioration in water quality. Runoff from the site during the construction phase of the development should be
This may, in turn, adversely affect the managed. During the construction phase, this will entail the development of and
health of flora and habitat value to local adherence to an erosion control procedure which will locate and describe measures
fauna. to ensure that sediments do not leave the site and degrade the receiving
environment;
Any fill introduced to the site should be certified as clean and free from
contaminants; and
With appropriate control measures in place, impacts upon downstream waterways
are expected to be negligible.
There is potential for nutrients to enter the Landscaping incorporated across the site, will aid in the uptake of nutrients that may
surrounding environment and drainage be present in runoff from the site.
REF:S50335ER001_rev a 10 & 22 Rose Gum Road and 521 Elm Street, Black Mountain
Detailed Ecological Assessment
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.