Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Plan of filling in dam between 5 and 7 Triller court.jpg

Attached to the e-mail Operational works application OPW23/0045 - DA Form 1 - Site Plan - Owners Consent..

of 1

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Wa

Yellow = area to be filled
using material from
existing dam wall back to
natural ground levels

Dam is very shallow and
has already been

8 drained/is dry.
Exis ting Area of earthworks
HOUSE tobe seeded with

couch grass

Extent of fill is
approximately 440m3

=e

   
 
  
   
   

25:8

180°00’30”

60-035

   

SP 320405

a |

AA
Log in to download the original file

Plan of filling in dam between 5 and 7 Triller court.jpg · 217 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.