Original source · versioned page text
Waste Management Plan & Landscape Plan MCU16/0117 & OPW16/0212
MCU 16/0117 & OPW160212 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING TYPE 4 CONVENTIONAL (6 UNITS) & OPERATIONAL WORKS FOR EARTHWORKS, STO RMWATER, DRIVEWAYS, PARKING & LANDSCAPING SITUATED AT 11 OPAL STREET, COOROY Waste Management Plan The Development involves the relocation of 4 “Queenslander” style dwellings to the site and for the dwellings to be renovated and repurposed into 6 Units. The 4 dwellings for relocation have been carefully chosen to avoid asbestos. In addition waste items identified prior to the relocation will be disposed of prior to relocating the dwellings to the site at 11 Opal Street. The developer anticipates a moderate amount of waste that will require management which might include, old floor coverings, bathroom and kitchen cabinetry and tiles, window coverings etc. Items that can be refurbished will be re-incorporated in the development and remain on site. Where appropriate items that cannot practically be used in the development that are considered to have value will be offered to second hand dealers and scrap merchants such as “Pomona New and Recycled” 25 Hill Street Pomona. Material On-site Destination Re-use & recyclin Disposal Type of Material Estimated On-site reuse or | Off-site recycling ; Contractor Volume (m3) _| recycling outlet Excavation Material 5 Sit 0 0 Garden Organics 1 1# 0 0 Bricks 0 0 0 0 Concrete 1 0 Pomona Waste 0 Management Timber 2 1 1 0 Pomona New & Recycled Plasterboard 2 0 0 2 Kartaway QLD P/L Metals 2 0 1 1 Pomona New & | Kartaway QLD P/L Recycled Carpet 2 0 0 2 Kartaway QLD P/L Tiles 1 0 0 1 Kartaway QLD P/L # The developer anticipates reusing all excavation material and Garden organics in on-site gardening and landscaping.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Waste Management Plan & Landscape Plan MCU16_0117 & OPW16_0212.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
All waste will be segregated into three categories and stored on site until it is either reused, delivered to a recycling outlet or collected by a disposal contractor. It is anticipated the Disposal Contractor deliver a skip bin to site. Items for reuse or recycling will be protected from the weather by the use of tarpaulins (or similar) to provide a barrier from the elements. Page 2
Page 3
La5euls \ 0g) FIV NW 1d Sis
Page 4
83-7090-9L SLNVLTNSNOD Q3LVIDOSSY | WNLVO A3AuNS 021 ‘bug eS “e 9 4 6G s31v3s NV1d JdV3SONV1 JILL ONIMVYO A040) 1S Wd0 (91872dS) | 107 S3INIOISIY G3ISOdOYd AHduNW S 8 YILISSON L NOILdI4ISIO 193/ONd ONY 1N3IT) VONISVN VIDNINLS3M Gere} IINNYNHINT WMIDZAS gE W39 A3NOH V3TTIAZY9 6) MHLINS WN3WIV C) NOLIHDAHIVY@ C) O0¥ININL VINFTVTIW ONILSIXA VATWARY9 ONILSIXI NAVT Ipunwng sadmooavya Y & PDANPOUAD ~MSVoypOG “oe O02. O|eyual MI\ [1nd Joy (, a 002 31V3S \ NW1d 4dVISONV1 cawerd SB \ \ \ ¥