Council archive · source document
07/2482 - MCU - Multiple Housing Type 4 Conventional (3 Units) [As Published] · 132007.2482
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local goverment (see EPA website for more
information on devolved ERAs)
Hf you answered NO to Q20 you do not need to
complete Qs 21-24.
If you answered YES to 020 and the
development is in a PA, your application must be
assessed by the administering autharity?*
against the Wild Rivers Cade and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
Tequirements (see Q2}. You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.
{f you answered NO to Q21, you do not need to
complete Q22. If you answered YES to Q21 you
are required to complete Q22.
It you answered NO to Q22, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,
tf you answered NO to 023 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to 023, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
If you answered YES to Q24 the application will
nat be accepted. If you answered NO to 024,
your appiication must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
It the development is proposed in a designated
urban area there may be no wild river
tequirements. See Section 2 02.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).
Documentation
If you answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed.
20.
21.
22.
23.
24,
25.
(DAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?
(no
Is the application for an ERA 20 instream?
(No (Yes
ls a quarry allocation notice held for the proposed ERA 20 instream?
me) (yes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
(no (Yes
ts the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.
LJno (Yes
(11 YES (ensure you have completed Part G of Form 1)
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?
(No (Yes
™ The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.
Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2482 - MCU - Multiple Housing Type 4 Conventional (3 Units) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.