Skip to the record
Every meeting, every word.

Original source · versioned page text

2576 - SBSMP-01 (Feb 2026)

Attached to the e-mail Fw_ Email 2 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 2).msg.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 67, section 1. The text section number identifies this passage in the reader.

               Rational Method Calculations
                                                                    Cooroy
                  Job Number            2576         IFD         ANY LOCATION           NEW IFD

                    Address        mfr-cmp                                      By         CL


               Pit 1/1                                                               Pit 1/2

Ref 1          Catchment Details                                                     Catchment Details
                      Area             1.8403        ha                                    Area            1.8403            ha
                        fi              0.00                                                 fi             0.86
                      C10                0.7                                               C10              0.872
                       I10              84.24       mm/hr                                   I10             84.24          mm/hr


Ref 2          Standard Inlet Time                                                   Standard Inlet Time
                     Time                0          mins                                   Time               5             mins


Ref 3          Overland Sheet Flow (Friend's Eqn)                                    Overland Sheet Flow (Friend's Eqn)
                    Length             240           m                                    Length             20              m
                     Slope            1.32           %                                     Slope              2              %

                   Surface 'n'        av. grass     0.045                               Surface 'n'        paved           0.015

                     Time              28.31        mins                                   Time             3.79            mins

Ref 4          Pipe Flow Travel Time                                                 Pipe Flow Travel Time
                 Flow Distance           0           m                                 Flow Distance       200               m
                     Avg. Dia            0          mm                                     Avg. Dia        450              mm
                 Fall of Channel         1           m                                 Fall of Channel      1                m
                       Time              0          mins                                     Time          1.52             mins

               Kerb Flow                                                             Kerb Flow
                     Length              0           m                                    Length              0              m
                      Slope              1           %                                     Slope              1              %
                      Time              0.0         mins                                    Time             0.0            mins


Ref 4              Channel Flow (Figure 4.8 QUDM, or                                  Channel Flow (Figure 4.8 QUDM, or Manning's
                           Manning's Equation)                                                          Equation)
                Flow Distance                     m                                    Flow Distance                      m
                Fall of Channel                   m                                   Fall of Channel                     m
                      Time                      mins                                        Time                         mins


                    Time of                                                               Time of
                                        28.3        mins                                                    10.3            mins
                 Concentration                                                         Concentration



               Peak Discharge Calculations

               Pit 1/1                                                               Pit 1/2

Design
                                     Frequency
Storm              Area (ha)                         Cy       Iy (mm/h) Qy (m3/s)        Area (ha)           Cy           Iy (mm/h)   Qy (m3/s)
                                     Factor (Fy)
(AEP)
 63%       1      1.84029982            0.80         0.56        73         0.209       1.84029982         0.6976           116        0.414
 39%       2      1.84029982            0.85        0.595        91         0.277       1.84029982         0.7412           145        0.549
 18%       5      1.84029982            0.95        0.665        113        0.384       1.84029982         0.8284           179        0.758
 10%      10      1.84029982            1.00         0.7         130        0.465       1.84029982          0.872           205        0.914
  5%      20      1.84029982            1.05        0.735        147        0.552       1.84029982         0.9156           233        1.091
 2%       50      1.84029982            1.15        0.805        171        0.704       1.84029982            1             268         1.37
 1%      100      1.84029982            1.20        0.84         188        0.807       1.84029982            1             294        1.503

Ref 5          Advice on Selection of AEP design events for various scenarios
Log in to download the original file

2576 - SBSMP-01 (Feb 2026).pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.