Original source · versioned page text
2576 - SBSMP-01 (Feb 2026)
Attached to the e-mail Fw_ Email 2 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 2).msg.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
3.3 MUSIC Modelling
MUSIC (Version 6.3.0) was used to model both the expected pollutant loads generated by the
development and the effectiveness of the proposed WSUD treatments. Rainfall, pollutant
loads, and treatment node parameters were derived from the MUSIC Modelling Guidelines
(for South East Queensland) V1.0 (Water by Design, 2010).
3.3.1 Split Catchment Approach
The development site was divided into catchments based on surface types (roof, paved,
pervious) as shown in Table 3-2. This approach allows for accurate representation of runoff
volumes and pollutant generation from different surfaces. Surface areas were calculated from
electronic CAD drawings of the development plan, consistent with the methodology outlined
in Table 3.4 of the MUSIC Modelling Guidelines.
The developed site has an average impervious area of 86%. The pervious "Mixed" surface
type (0% impervious) encompasses all landscaped and vegetated areas, accounting for their
rainfall absorption capacity.
Source Node Area (Ha) Surface Type % Impervious
C1-Roof 0.900 Roof 100
C1-Hardstand 0.647 SealedRoad 100
C1-Pervious 0.259 Mixed 0
C2-Roof 0.000 Roof 100
C2-Hardstand 0.035 SealedRoad 100
C2-Pervious 0.000 Mixed 0
Table 3-2 Adopted areas and percentage imperviousness for the subject site
2576-SBSMP-01_Version 1.0 (February 2026) Page 8 of 23
SX/TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2576 - SBSMP-01 (Feb 2026).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.