Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2576 - SBSMP-01 (Feb 2026)

Attached to the e-mail Fw_ Email 2 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 2).msg.

of 107

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

3.3.5 MUSIC Treatment Node Parameters

Bioretention Basin

Figure 3-2 shows the parameters used for the bioretention basin node. The basin has been
sized to fit within the available space at the southeast corner of the site, resulting in a filter
area of 210m². It features an extended detention depth of 300mm and has no saturated zone.




                               Figure 3-2 Bioretention parameters for the bioretention strip


Note: *Healthy Waterways recommends using MUSIC version 6 to ensure compliance with stormwater pollutant load reduction
objectives, with the following parameters adopted when modelling bioretention filter media:
• Minimum 30 mg/kg Orthophosphate (OP)
• Minimum 400 mg/kg Total Nitrogen (TN)
Source: http://hlw.org.au/initiatives/waterbydesign/water-sensitive-urban-design-wsud, viewed 28/05/19.




2576-SBSMP-01_Version 1.0 (February 2026)                                                                Page 10 of 23
SX/TB

Log in to download the original (2576 - SBSMP-01 (Feb 2026).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.