Original source · versioned page text
2576 - SBSMP-01 (Feb 2026)
Attached to the e-mail Fw_ Email 2 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 2).msg.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
DOCUMENT INFORMATION
Document Title: Site-Based Stormwater Management Plan
Document Reference No. 2576-SBSMP-01 – Version 1.0
Commissioned By: RMD Capital Pty Ltd
Prepared By: Barlow Shelley Pty Ltd
Author: Sheng Xie (BEng(Civil))
Tim Burke (BEng (Civil), CPEng, MIEAust,
Reviewed & Authorised By:
RPEQ, NER)
DOCUMENT CONTROL
Version Date Author Reviewer
1.0 27 February 2026 Sheng Xie Tim Burke
“©2026 Barlow Shelley Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document belongs to
Barlow Shelley Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or in or on any media to any person without the prior written consent of Barlow Shelley Pty Ltd”.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2576 - SBSMP-01 (Feb 2026).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.