Original source · versioned page text
2576 - SBSMP-01 (Feb 2026)
Attached to the e-mail Fw_ Email 2 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 2).msg.
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
4.4 WBNM Analysis Pre-Development Scenario
A WBNM was approximated for the existing catchments according to existing site parameters.
The model estimated that the existing 1% AEP peak flow discharge from the site was
0.8m3/s overall. Pre-development peak flow rates for all design storms are provided in Table
4-4.
EXISTING CASE - COMBINED
Peak Flow Rates - Q (m3/s)
AEP WBNM RM Difference
63.2% 0.197 0.209 6.1%
50% 0.242 0.277 14.5%
20% 0.457 0.384 -16.0%
10% 0.485 0.465 -4.1%
5% 0.578 0.552 -4.5%
2% 0.725 0.704 -2.9%
1% 0.801 0.807 0.7%
Table 4-4 WBNM discharge flow rates for pre-development catchments
The Rational Method was used to provide an estimate of a range of flows for the total pre-
development catchment for comparison and verification of the WBNM model. See Appendix
D for calculations. The Rational Method results are within 20% of the results obtained from
the WBNM analysis for the pre-development case across all storm events. From the
comparison of results, it is determined that the Rational Method verification corresponds well
with the WBNM analysis results.
2576-SBSMP-01_Version 1.0 (February 2026) Page 17 of 23
SX/TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2576 - SBSMP-01 (Feb 2026).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.