Table B: Post construction phase – stormwater management design objectives
Application:
(1) A material change of use for an urban purpose that involves premises 2500 metres2 or greater in size and:
(a) will result in six or more dwellings; or
(b) an impervious area greater than 25 per cent of the net developable area.
(2) Reconfiguring a lot for urban purposes that involves premises 2500 metres2 or greater in size and will result in six or more lots.
Climatic region Design objectives
Reductions in mean annual load from unmitigated development (%)
Total Total Total Gross Waterway stability
suspended phosphorus nitrogen pollutants management
solids (TSS) (TP) (TN) >5mm
South East Queensland 80 60 45 90 Limit the peak 1-year
ARI event discharge
Central Queensland (south) 85 60 45 90
within the receiving
Central Queensland (north) 75 60 4015 90 waterway to the
pre-development peak
Cape York14, wet tropics and 80 6016 40 90
1-year ARI discharge
dry tropics
Western Queensland14 85 60 45 90
Notes:
• Mapping of climatic regions is available on the State Planning Policy Interactive Mapping System.
• In lieu of modelling, the default bio-retention treatment area to comply with load reduction targets for all Queensland regions
in 1.5 per cent of the contributing catchment area.
• Water stability objective applies if development drains to an unlined waterway within or downstream of the site where a risk of
increased erosion exists due to changes in hydrology. Local government may also require application of the waterway stability
objective where there are planned future rehabilitation works to return a lined channel to a natural channel design.
• The SPP Water quality guidance material provides advice on the measures that demonstrate compliance with table B.
14
Note: Applies to population centres greater than 25,000 persons.
15
Note: Mackay Regional Council has adopted a 35 per cent reduction for TN.
16
Note: Townsville City Council has adopted a 65 per cent reduction for TP.
page 82
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2576 - SBSMP-01 (Feb 2026).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.