Skip to the record
Every meeting, every word.

Council archive · source document

Development Application part 1 of 2 Application Forms · OPW11/0299

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                  Place Barcode here



    THIS IS THE NEXT PART OF A
 MULTIPLE PART RECORD
                     Part I                      Of 2-

Application number:                                        0PvA1,(N-99--
       C Documents and Settings\eje\Desktop'+Multi Pan Record Cover Sheet NEXT PART (3) doe
Full text of the other 21 pages

Page 2

     Appendix A
     Certificate of Title and Owners Consent




fl




P




                                               Page 5


[OCR of page images]
ss

Appendix A

Certificate of Title and Owners Consent

Page 5

 

Page 3

    Queensland Land Titles                                                                    Page I of I




                                CURRENT TITLE SEARCH
                        ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
     Request No: 12171228
    Search Date: 23/08/2011 14:27                                   Title Reference: 50717025
                                                                       Date Created: 24/04/2008

    Previous Title: 16193113
                      50025851
                      50517081


    REGISTERED OWNER


    Dealing No: 711590266 18/04/2008

    BUNN:NGS PROPERTIES PTY LTD A.C.N. 008 557 622




    ESTATE AND LAND


E    Estate in Fee Simple


     LOT 80           SURVEY PLAN 211687
                      County of MARCH               Parish of TEWANTIN
                      Local Government: SUNSHINE COAST


    EASEMENTS, ENCUMBRANCES AND INTERESTS


            1.    Rights <ind interests reserved to the Crown by
                  Deed of Grant No. 10431149 (POR 396)

           2.     EASEMENT No 707966835 11/08/2004 at 15:49
                  benefiting the land over
                  EASEMENT A ON SP170294


    ADMINISTRATIVE ADVICES - NIL
    UNREGISTERED DEALINGS - NIL




    CERTIFICATE OF TITLE ISSUED - No


      gut i ;t:     'hare ; do not nrcessar i 11 appear in order of pr          1.


                                ** End of Current Title Search **


     :OPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) [20111
     tequested By: D APPLICATIONS ABR




                                                                                       Page




    https://ipsgroup.portal.abr.com.au/live/qldlt/formprocess.php                             23/08/2011

Page 4

     ZUNNINGS
     Date:          26 August 20111


     The Chief Executive Officer
     Sunshine Coast Regional Council
     Locked Bag 72
     SUNSHINE COAST MAIL CENTRE QLD 4560

     Dear Sir / Madam
     RE:                LAND OWNER CONSENT FOR DEVELOPMENT APPLICATION

     We, the undersigned, of Bunnings Properties Pty Ltd (A.C.N. 008 557 622) consent to the lodgement of the necessary
     development application/s (under the Sustainable Planning Act 2009) by RPS Australia East Pty Ltd for the
     establishment of advertising devices on land at 178 Eumundi Noosa Road, Noosaville, more formally described as Lot
     80 on SP211687.

.Yours faithfully




                                                                                 Date:           'Le • G,Vy^n1^t 20
     Name:

     Position:           m-
                                               c 3 (HT

                                                                                 Date:              26lell
    Name:

     Position:                            -^^
                      I2^FE277 i c`ELv/^4^^


    The ACN must be included and accompanied by -
    •    the signature of either-
         -     Two directors of the company
• - A director and a company secretary of the company or
               If a proprietary company that has a sole director who is also the sole company secretary, that director
    OR
             The company seal (if the company has a common seal) witnessed by-
             -    Two directors of the company
             -    A director and a company secretary of the company or
             -    For a propriety company that has a sole director who is also the sole company secretary, that director.


        P-G       0096 lo12^^1"l




    Bunnings Group Limited                                                Level 3, Nexus Building                           Telephone : +(61) 7 3452-5600
    A.B.N. 26 008 672 179                                                 96 Mt Gravatt Capalaba Road                       Facsimile :+(81)73452-5910
    A member of the Wesfarmers Limited                                    Upper Mt Gravatt. OLD 4122                         Web www bunnings.com.au
    Group of Companies                                                    PO Box 2277, Mansfield BC
                                                                          Mansfield, OLD 4122

Page 5

      Application Details - IDAS form 1
      (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)



      You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
      necessary information and documentation will result in your application not being a properly made application.

      For all development applications, you must:

      •      complete this form (Application details - IDAS form 1)

      •      complete any other forms relevant to your application

      •      provide any mandatory supporting information identified on the forms as being required to accompany your
             application.
      All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
      Planning Regulation 2009.


C71   Applicant details (note: the applicant is the person responsible for making the application and need not be the
      owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
      correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
      be issued to the applicant.)


      Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
      applicant" button below.


      Name/s (individual or company name in full)                   Bunnings Properties Pty Ltd C/- RPS


      For companies, contact name                                   Morgan Jones


      Postal address                                                PO Box 1559, Fortitude Valley, QLD 4006


      Contact phone number                                          (07) 3237 8816


      Mobile number (non-mandatory)                                 n/a

• Fax number (non-mandatory)                                        (07) 3237 8833


      e-mail address (non-mandatory)                                [email protected]




      1. What is the nature of development proposed? (tick all applicable boxes)


      q     material change of use of premises

            building work

      ® operational work

      q     reconfiguring a lot




          Department of Infrastructure and Planning                            QPlan                          Queensland
                                                                                                              Government

Page 6

2. What type of approval is being sought?


® development permit

q    preliminary approval

q    both - provide details below



3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


® No

q     Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                                 Lot on plan
                 Street Address
                                                                                 description
                                                                                                      Local government area
                 Unit   Street       Street name and official        Post             Plan type         (e.g. Logan,Cairns)
                                                                            Lot No..
                 No.     No.          suburb/locality name           code            and plan no.

                                 Eumundi Noosa Road,
        F-   1          178

                            '
    Street address / lot on plan
                                 Noosaville
                                                                 4566       80      SP211687        Sunshine Coast



    Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

                 Coordinates (note: place each set of
                 coordinates in a separate row)                          Zone                              Local government
                                                                                         Datum
                                                                       reference                           area ( If app li ca bl e)
                   Easting       Northing     Latitude   Longitude

                                                                                    q GDA94
                                                                                                                                        fl
                                                                                    q WGS84
             1
                                                                                    q other




5. Total area of the premises on which the development is proposed (indicate hectares or m2)

3.162ha
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


         1       Bunnings Warehouse under construction



7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)


9 painted on "Wall Signs" on the facade of the Runnings Warehouse




                                                                                                    )plicatfc H Details - IDAS form 1
                                                                                                    Version 1.0 18 December 2009

Page 7

  8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)


  ® No

  q    Yes - complete either table D, table E or table F as applicable



  9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
  materials. Refer to the notes at the end of this form for more information)


  Z No                            q Yes - complete table G



  10. Identify if any of the following apply to the premises (tick applicable box/es)


         adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H

         on strategic port land under the Transport Infrastructure Act 1994 - complete table I

         in a tidal water area - complete table J


  11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
      water, etc.)


  q No ® Yes - ensure the type, location and dimension of each easement is included in the plans submitted

  12. Does the proposal include new building work or operational work on the premises? (including any
      services)

  ® No F-I Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted


  13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
      end of this form for more information)


  ® No - Go to question 15                   q Yes


  15. Has the local government agreed to apply a superseded planning scheme to this application under
     section 96 of the Sustainable Planning Act 2009?



• Z No

  q    Yes - provide details below


  16. List below all of the forms and supporting information that accompany this application (include all IDAS
  forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
  question does not apply for applications made online using Smart eDA)

                                                                                                 Method of lodgement to
                               Description of attachment or title of attachment
                                                                                                  assessment manager


              1    IDAS Form 6, Checklist 1 and 4                                                e-mail



              2    Letter, Proposal Plans and Code Response                                      e-mail




                                                                                            Appiff   ,i Details - IDAS form 1
                                                                                              Version 1.0 18 December 2009

Page 8

17. Applicant's declaration


® By making this application, I declare that all information in this application is true and correct (note: it is
    unlawful to provide false or misleading information).


Notes for completing this form

Question 8:
•  Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
   for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
   required under section 263, then an application must contain, or be accompanied by, the written consent of the
  owner, or include a declaration by the applicant that the owner has given written consent to the making of the
   application.
•  Owner's consent is not required for a mobile and temporary ERA.

Question 9:
•  Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
   regulation may require the application to be supported by certain evidence prescribed under the regulation.
   Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
   required to be given, and the evidence required, to support the application.
                                                                                                                               C
Question 13:
•  The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
   long service leave levy is payable.
•  The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
   are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
•  The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
   permit is issued.
•  Building and Construction Industry Notification and Payment Forms are available from any Queensland post
   office or agency, on request from QLeave, or can be completed on the QLeave website at
   www.gleave.glc! go. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required      e P blic Records Act 2002.


OFFICE USE ONLY' j- nXAX I


     r    ^ 1^                    p11         Refe nce numbers

  \\           ' ??^^
NOTIFICATION OF ENGAGEMEN,,
                         ,P i, RIVAT CERTIFIER
                                      CERTIFIER


                                                       Council. I have been engaged as the private certifier for the
                                                       building work referred to in this application.


Date of                                                                     BSA Certification       Building
                    Name
engagement                                                                  license number          classification/s




                                                                                             plication Details - IDAS form 1
                                                                                             Version 1.0 18 December 2009

Page 9

    qqq
    QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                                  Date receipted
                                          QLeave Project   Amount                 form sighted by Name of officer who
                  Description of the work                             Date paid
                                          Number           paid ($)               assessment      sighted the form
                                                                                  manager


            1


    The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
    form and all other required application materials should be sent to your assessment manager and any referral
    agencies.




E




C




                                                                                           ,p11c,1^^ " !?etails - IDAS form 1
                                                                                            Version 1.0 18 December 2009

Page 10

                                   Integrated Development Assessment System form


    Building or operational work assessable
    against a planning scheme - IDAS form 6
    (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


    This form must be completed for development applications for building works or operational work assessable against
    a planning scheme.
    You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
    necessary information and documentation will result in your application not being a properly made application.

    For all development applications, you must:

    •      complete Applicant details - IDAS form 1

    •      complete any other forms relevant to your application
    •      provide any mandatory supporting information identified on the forms as being required to accompany your
           application.
C
    All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
    Regulation 2009.

    This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.


    1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)


    q building work - complete table A                    ® operational work - complete table B



    Table B


              What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)


              q road works                   q stormwater                    q water infrastructure
              q drainage Works               q earthworks                    q sewerage infrastructure
C
              q landscaping                  ® signage                       q clearing vegetation under the planning scheme
              q other - please specify below

              What type of approval is being sought? (if you have indicated multiple works in the above question, please
              use an attachment to this form to detail each approval request)


              ® development permit                q preliminary approval                q both - specify below


              Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)


              ® No          q Yes - specify the number of lots being created


              Are there any current approvals associated with this application? (e.g. material change of use)


              q No          ® Yes - provide details below




        Department of Infrastructure and Planning                             QPlan                               Queensl

Page 11

   LL
               List of approval reference/s                 Date approved            Date approval lapses

               2007/256




2. What is the dollar value of the proposed building work? (inc GST, materials and labour)




                                                                                                                        E




                                                                                                                        P




                                                                                       4 r,r +ng scheme - IDAS form 6
                                                                                      Version 1,0 18 December 2009

Page 12

3. Confirm the following mandatory supporting information accompanies this application

                                                                                  Confirmation
                                                                                                     Method of lodgement
                                                                                  of lodgement
All applications for operational works

site plans drawn to scale which show the following:
•   the location and site area of the land to which the application relates
    (relevant land)
•   the north point
•   the boundaries of the relevant land
•   the allotment layout showing existing lots, any proposed lots (including
    the dimensions of those lots), existing or proposed road reserves,            q confirmed
    building envelopes and existing or proposed open space (note:
    numbering is required for all lots)
•   any existing or proposed easements on the relevant land and their
    function
•   any access limitation strips
•   all existing and proposed roads and access points on the relevant land

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents                    q confirmed
relevant to the application

Applications for operational works involving earthworks (filling and excavating)


drawings showing:
•   existing and proposed contours
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works                                          q confirmed
•   the location of any proposed retaining walls on the relevant land and
    their height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)

Applications for operational works involving roadworks

drawings showing:
•   existing and proposed contours
•   the centreline or construction line showing chainages, bearings, offsets
    if the construction line is not the centreline of the road and all
    intersection points
• information for each curve including tangent point chainages and
    offsets, curve radii, arc length, tangent length, superelevation (if
    applicable) and curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed                                q confirmed
•   position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
    street furniture
•   pavement markings including details on raised pavement markers
•   catchpit, manhole and pipeline locations
•   drainage details (if applicable)
•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
•   location and details for access points, ramps and invert crossings
•   changes in surfacing material

                                              Building and operational work assessable against a                     IDAS form 6
                                                                                                   Version 1.0 18 December 2009

Page 13

    I""
                                                                            Confirmation
                                                                                             Method of lodgement
                                                                            of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
   easements
                                                                            q confirmed
•   manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation



drawings showing:
•   kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments                                                   fl confirmed
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation

drawings showing:
•   location of all existing and proposed services
•   location of all existing and proposed sewer lines and manhole locations
•   location of all house connection branches
•   kerb lines or edge of pavement where kerb is not constructed
•   chainages                                                               []confirmed
•   design sewer invert levels
•   design top of manhole levels
•   type of manhole and manhole cover
•   pipe diameter, type of pipe and pipe alignment                                                                        W
•   location of house connections (if applicable)
•   sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
•   type of wattage and lighting
•   any traffic calming devices                                             q confirmed

•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                                                                                 gsche,. -IDASIorm6
                                                                                           Version 1.0 18 December 2009

Page 14

LJLJL
                                                                           Confirmation
                                                                                            Method of lodgement
                                                                           of lodgement
Applications for operational works involving public utility services

drawings showing:
•   any existing light poles and power poles
•   any existing underground services                                         confirmed
•   details of proposed services
•   alternation to existing services

Applications for operational works involving landscaping works

drawings showing:
•   the location of proposed plant species
•   a plant schedule indicating common and botanical names, pot sizes
    and numbers of plants
•   planting bed preparation details including topsoil depth, subgrade
    preparation, mulch type and depth, type of turf, pebble, paving and       confirmed
    garden edge
•   the location and type of any existing trees to be retained
•   construction details of planter boxes, retaining walls and fences
•   the proposed maintenance period
•   irrigation system details


Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
    against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
    mentioned, take it to mean the land use plan for the airport land.



Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.




                                r
The Su tainable Planning^A'cT^20   is administered by the Department of Infrastructure and Planning. This form and
all other\equired apption materials should be sent to your assessment manager and any referral agencies.




                                                                                                y scheme - IDAS form 6
                                                                                          Version 1.0 18 December 2009

Page 15

             II-                      Integrated Development Assessment System Checklist


    Development assessment checklist - IDAS
    checklist 1
    (Sustainable Planning Act 2009, version 1.0 18 December 2009)


    This checklist applies to the carrying out of development generally.

    You are not required to complete this checklist as part of your development application, however you may submit the
    checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

    •    whether you need to make a development application for the proposed development
    •    if a development application is required, the relevant IDAS forms you need to complete as part of your application

    •   whether you need to give a copy of your application to any referral agencies.

    If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
    that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
    works - IDAS checklist 4, as applicable.

• If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
     Department of Infrastructure and Planning's website at www.dip.gld.gov.au.

    All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
    Planning Regulation 2009.


    Part 1 - General questions


    1.1 Have you received a referral agency response in relation to this proposed development prior to making
    an application?

    ZNo
                         To assist you in preparing your application, completing Referral agency responses - IDAS checklist
    q Yes
                         6 is recommended


    1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?


    ® No
                         You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
C
    q Yes                form 2 and give this notice to the relevant local government. If the local government agrees to
                         your request, details must be provided in Application details - IDAS form I



    1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
    notice is required under the Water Act 2000?


        No

    q Yes                It is recommended that you complete part 2 of this checklist


    1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
    the Queensland Heritage Act 1992?


    ® No

    q Yes                It is recommended that you complete part 3 of this checklist




        Department of Infrastructure and Planning
                                                                                                                uu1:4

Page 16

1.5 Does the proposal involve development on a local heritage place?


® No
q Yes              It is recommended that you complete part 4 of this checklist



1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?


Z No

q Yes I            It is recommended that you complete part 5 of this checklist


1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)


  No

q Yes              It is recommended that you complete part 6 of this checklist


1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?


® No

q Yes              It is recommended that you complete part 7 of this checklist


1.9 Is any part of the premises designated for community infrastructure?


Z No

q Yes              It is recommended that you complete part 8 of this checklist


1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?


ZNo

q Yes              It is recommended that you complete part 9 of this checklist


1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?
                                                                                                                                    C
[K No

q Yes              It is recommended that you complete part 10 of this checklist


Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
   While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
   checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
   not rely on the information without first making your own enquiries regarding the interpretation and application of
   the applicable legislation to your circumstances.

   To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
   negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
   other consequence which may arise from your reliance on this process and the information contained on this
   checklist.



                                                                                               (" c nt c t,nst - IDAS checklist 1
                                                                                              Version 1 0 18 December 2009

Page 17

OFFICE USE ONLY


Date received                           Reference numbers

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.




                                                                                       ent checklist - IDAS checklist 1
                                                                                       Version 1.0 18 December 2009

Page 18

                                      Integrated Development Assessment System checklist                       11           I
          I



    Operational Works - IDAS Checklist 4
    (Sustainable Planning Act 2009, version 1.0, 18 December 2009)


    This checklist only applies when the development application seeks approval for operational works.

    You should complete all questions unless the checklist indicates otherwise.

    All planning and development applications require applicants to complete the following:

    •       Applicant details --IDAS form 1

    •       any forms or mandatory supporting information identified as forming part of your application.

    If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
    Infrastructure and Planning's website, www_dp.q_ld.go_v.au.
    The checklist and relevant sections do not need to be completed for applications relating only to building work
    requiring assessment against the Building Act 1975.


•   Part I - General questions

    1.1           Is the proposed operational work assessable under the planning scheme?


    q No

                      •       You must complete Building and operational work assessable against a planning scheme - IDAS
    ® Yes                     form 6
                      •       Continue on to question 1.3


    1.3           Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
                  state-controlled road?


    ® No
    q Yes
       e
          NoY s               It is recommended that you complete part 2 (starting from question 2.1) of this checklist.
                              It is recommended that you complete part 2 (starting from question 2.2) of this checklist.


    1.4           Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils
                  apply to the development?

P
    ® No

    F-1 Yes                   It is recommended that you complete part 3 of this checklist.


    1.5           Is there any proposed operational work for filling or excavation?




    E
    ® No
    ql Yes            •
                              It is recommended that you complete part 4 (starting from question 4.5) of this checklist.
                              It is recommended that you complete part 4 (starting from question 4.1) of this checklist.




          Department of Infrastructure and Planning                    QPlan                                  queensiana
                                                                                                         %\\ Government

Page 19

1.6         Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
            2009 and does it exceed the specified threshold?


® No
               •       This application requires assessment by the Department of Transport and Main Roads as a
      Yes
                       concurrence agency

Section reference:
•           Sustainable Planning Regulation 2009, schedule 7, table 3, item 14

1.7         Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
            2009 and does it exceed the specified threshold?


      No
               •       This application requires assessment by the Department of Transport and Main Roads as a
      Yes
                       concurrence agency

Section reference:
•           Sustainable Planning Regulation 2009, schedule 7, table 3, item 15


1.8         Is any part of the premises in an interim koala habitat protection area identified under the South East
            Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?


Z No

      Yes              It is recommended that you complete part 5 of this checklist.


1.9         Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
            also assessable?


® No

q Yes                  It is recommended that you complete part 6 of this checklist.


1.10        Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
            clearing of native vegetation?


Z No

q Yes                  It is recommended that you complete part 7 of this checklist.
                                                                                                                                fl
1.11        Is any of the proposed operational work for any thing constructed or installed that allows, under the
            Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
            using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
            or from a dam constructed on a watercourse or lake?


Z^ YNos
      No
       e
       es
                       It is recommended that you complete part 8 (starting from question 8.8) of this checklist.
                       It is recommended that you complete part 8 (starting from question 8.1) of this checklist.

1.12        Is any of the proposed operational work tidal work, other than excluded work defined under the
            Sustainable Planning Regulation 2009?

® No

E] Yes         •        It is recommended that you complete part 9 of this checklist.




                                                                                                  a! works - IDAS checklist 4
                                                                                                  ersion 1.0 December 2009

Page 20

            JL

      1.13       Is any of the operational work proposed to be carried out within a coastal management district?


      Z No

      q Yes                   It is recommended that you complete part 10 of this checklist.


      1.14       Is any of the proposed operational work for constructing or raising waterway barrier works under the
                 Fisheries Act 1994?


      Z No

      q Yes                   It is recommended that you complete part 11 of this checklist.


      1.15       Is any of the proposed operational work to be carried out completely or partly within a declared fish
                 habitat area under the Fisheries Act 1994?


      ® No

      q Yes                   It is recommended that you complete part 12 of this checklist.


      1.16       Is any of the proposed operational work removing, destroying or damaging marine plants under the
C7J              Fisheries Act 1994?


      ® No

      q Yes                   It is recommended that you complete part 13 of this checklist.


      1.17       Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
                 Rivers Act 2005?

      ® No

      q Yes                   It is recommended that you complete part 14 of this checklist.


      1.18       Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
                 state-controlled road?

      ® No
      q Yes                   It is recommended that you complete part 15 of this checklist.


11    Part 2 - State-controlled roads
      2.1        Is the proposed operational work for filling or excavating listed in the Sustainable Planning
                 Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?

      ® No           •        End of part 2 of this checklist.
                     •        This application requires assessment by the Department of Transport and Main Roads as a
      q Yes
                              concurrence agency.

                 End of part 2 of this checklist.


      Section reference:
      •          Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2


      Part 4 - Easements and Substations




                                                                                                 tiona;    -., - IDAS checklist 4
                                                                                                    Version 1 0 December 2009

Page 21

4.5         Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
            I issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
            strategic pipeline?


^,o
® No
      Yes
                        End of part 4 of this checklist.

                        This application requries assessment by the pipeline licence holder as an advice agency.


Section reference:
•           Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17


Part 8 - Taking or interfering with water

8.8         Is any of the proposed operational work for any thing constructed or installed that allows, under the
            Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
            water)?


      No

                •       You must complete Taking artesian or sub-artesian water - IDAS form 12.
      Yes               This application requires assessment by the Department of Environment and Resource
                        Management as a concurrence agency.


8.9         Is any of the proposed operational work for any thing constructed or installed that allows, under the
            Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?


® No                    Go to question 8.12.
      Yes


8.12        Is any of the proposed operational work for any thing constructed or installed that allows, under the
            Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
            pump water)?


® No                    Go to question 8.14

      Yes

8.14        Does any of the proposed operational work for any thing constructed or installed that allows, under
                                                                                                                                C
            the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
            water)?


® No                    Go to question 8.19
0 Yes

8.19        Is the proposed operational work for the following?


for the construction of a referable dam as defined under the Water Supply (Safety
                                                                                         El Yes            ®No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent             E] Yes            ®No



            If yes to any of the above you must complete Referable dam - IDAS form 16.
•           This application requires assessment by the Department of Environment and Resource Management
            (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
            concurrence agency and you must give DERM a copy of the application



                                                                                                        ks - IDAS checklist 4
                                                                                                 Version 1.0 December 2009

Page 22

          IL
     Section reference:
     •       Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
     •       Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
     •       Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
     •       Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
             with subartesian water as assessable)
     •       Wild Rivers Act 2005, section 43A
     •       Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
             artesian water)
     •       Relevant wild river declarations

     Notes for completing this form:
     •      Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
            completed for all development applications to be considered.
     •      The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

     Privacy - please refer to the assessment manager for further details on the use of information recorded in
     this form.

    Disclaimer:
• While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
    provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
    information without first making your own enquiries regarding the interpretation and application of the applicable
    legislation to your circumstances.

     To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
     negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
     consequence which may arise from your reliance on this process and the information contained on this form.




                                                                                                      nal works - IDAS checklist 4
                                                                                                      Version 1.0 December 2009

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2 Application Forms.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.