NOOSA COUNCIL IDAS Development Application Decision Notice 10
Schedule B - Air
Odour Nuisance
(B1) Prevent the release of odour, which causes or is likely to cause a nuisance at any odour
sensitive place. Nuisance includes odour that is or is likely to be noxious or offensive to a person
or a nuisance in the opinion of an authorised person.
END OF CONDITIONS FOR SCHEDULE B
Schedule C - Water
Release of Contaminants to Waters
(C1) Contaminants must not be directly or indirectly released from the place to which this
development approval relates to any waters or the bed and banks of any waters except:
(i) as permitted under the stormwater management schedule; or
(ii) to a sewer as permitted or otherwise agreed from time to time by the relevant Local
Government.
Effluent Storage & Pipelines
(C2) All storages and pipelines used for the storage or treatment or transfer of sewage must be
installed and maintained to minimise any discharge from the storage or pipelines to any waters
(including groundwater).
Stormwater Management
Contaminant Releases Caused by Rainfall
(C3) Except as otherwise provided by the conditions of the stormwater management schedule and
the water schedule of this development approval, this environmentally relevant activity must be
carried out by such practicable means necessary to prevent the release or likelihood of release
of contaminated runoff from the place to which this development approval relates to any
stormwater drain or waters or the bed or banks of any such waters. ‘Contaminated runoff’ for
the purpose of this condition of the development approval means stormwater and/or stormwater
runoff that contains contaminants that may cause environmental harm.
END OF CONDITIONS FOR SCHEDULE C
Schedule D - Noise
Emission of Noise
(D1) In the event of a complaint about noise that constitutes intrusive noise being made to the
administering authority, that the administering authority considers is not frivolous or vexatious,
then the emission of noise from the place to which this development approval relates must not
result in levels greater than those specified in Schedule D, Table 1.
SCHEDULE D - TABLE 1
NOISE LIMITS AT A NOISE SENSITIVE PLACE
Time Periods Noise Level at a Noise Sensitive Place Measured as the
Adjusted Maximum Sound Pressure Level
LAmax adj, T
Monday to Friday 7 am - 6 pm Background noise level plus 5 dB(A)
Saturday 7 am - 12 noon
Monday to Saturday 6 am - 7 am Background noise level plus 5 dB(A)
Monday to Friday 6 pm - 10 pm
Saturday 12 noon - 6 pm
All other times and public holidays Background noise level plus 3 dB(A)
H o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A7FC.001.pdfRelated documentPublic source context ↗
20789 DA Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.