Council archive · source document
0015A7FC.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NOOSA COUNCIL IDAS Development Application Decision Notice 8
Concurrence Agency Conditions -
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Schedule A - Activity
Maintenance of Plant and Equipment
(A1) The holder of this development approval must:
(i) install all plant and equipment necessary to ensure compliance with the conditions of this
development approval; and
(ii) maintain such plant and equipment in a proper and efficient condition; and
(iii) operate such plant and equipment in a proper and efficient manner.
In this condition, “plant and equipment” includes:
(a) plant and equipment used to prevent and/or minimise the likelihood of environmental harm
being caused;
(b) devices and structures to contain foreseeable escapes of contaminants and waste;
(c) vehicles used to transport waste;
(d) devices and structures used to store, handle, treat and dispose of waste;
(e) monitoring equipment and associated alarms; and
(f) backup systems that act in the event of failure of the primary system.
Display of Development Approval
(A2) A copy of this development approval must be kept in a location readily accessible to personnel
carrying out the activity.
Records
(A3) Any records or documents which are required to be kept by a development condition of this
development approval must be kept at the premises to which the development approval relates
for a period of at least five (5) years and be available for examination by an authorised person.
The record retention requirements of this development condition will be satisfied if any daily and
weekly records are kept for a period of at least three (3) years and these records are then kept
in the form of annual summaries after that period.
Alterations
(A4) No change, replacement or operation of any plant or equipment is permitted if the change,
replacement or operation of the plant or equipment increases, or is likely to substantially
increase, the risk of environmental harm above that expressly provided by this development
approval.
An example of a substantial increase in the risk of environmental harm is an increase of ten
percent (10%) or more in the quantity of the contaminant to be released into the environment.
Calibration
(A5) All instruments and devices used for the measurement or monitoring of any parameter under
any development condition of this development approval must be calibrated, and appropriately
operated and maintained.
Nuisance
(A6) Notwithstanding any other condition of this development approval, this development approval
does not authorise any release of contaminants which causes or is likely to cause an
environmental nuisance beyond the boundaries of the place to which this development approval
relates.
Complaint Recording
(A7) All complaints received by the holder of this development approval relating to operations at the
place to which this development approval relates must be recorded and include the following
details:
H o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A7FC.001.pdfRelated documentPublic source context ↗
20789 DA Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.