Approved Plans 132005.638.04
Plans and drawings: the text below has words only, no drawings.
Very large file (12.9 MB): may take a few minutes to open.
NOOSA COUNCIL
Services and road works Notes APPROVED PLAN
Electrical, Data supply - relocate to new swbd. and data rm (reviva
bldg.) shown.
132005.638.04 18 DEC 2025
Sewerage treatment location for connection of new toilets etc
bp
Water supply allow for 5 new undergound concrete tanks to collect
SW from Roofs.
Solar - allow 30kw system and batteries for both buildings
SW treatment - connect all road and roof run off to SW treatment
location.
new road works to all areas shown grey.
6m double gate fp
fp
fen1
relocated lunch relocated truck
room wash bld
t2
t2
t2
t2
4m double gate 4m double gate
6m double gate B A
sewer
rf1
water
electrical and data stormwater
overflow
pumps
rf2
rf2 rf2
Protected habitat
fen
rf2 t1 zone, shown brown -
approximate,
requires accurate
survey
t1
t1
0 10 30 80
FLEXURE Pty Ltd Site - infrastructure
CLIENT USE FIGURED DIMENSIONS. ISSUE AMMENDMENT Title
NOOSA COUNCIL DO NOT SCALE FROM THE date details
DRAWINGS. CONFIRM ALL Date
GRANT CALDER ARCHITECTURE AND URBAN DESIGN DIMENSIONS ON SITE PRIOR 14 February 2025
TO CONSTRUCTION OR
FABRICATION. IT REMAINS Scale 1:700@ A3
PROJECT RECYLE/TRANSFER STATION CENTRE THE CONTRACTORS
RESPONSIBILITY TO ENSURE Drawn Grant Calder
21 Bursaria Street Peregian Beach SP298776 561 Noosa Eumundi Road COMPLIANCE WITH ALL
ph: 0488 084 184
email - [email protected] PLANNING APPLICATION RELEVANT CODES AND
REGULATIONS IS Checked Grant Calder
Registered Architect- BOAQ 3112 MAINTAINED AT ALL TIMES.
Drawing No GC 147 MPAC 7 Issue - 0
Document Set ID: 24333467
23617062
Version: 1, Version Date: 25/11/2025
05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.