2022-02-14 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
MINUTES
General Committee
Meeting
Monday, 14 February 2022
10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 25 sections
Section 2
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
1. ATTENDANCE & APOLOGIES
COUNCILLORS
Cr Frank Wilkie
Cr Karen Finzel (via Microsoft Teams)
Cr Joe Jurisevic (via Microsoft Teams)
Cr Amelia Lorentson
Cr Clare Stewart (via Microsoft Teams)
Cr Brian Stockwell (via Microsoft Teams)
Cr Tom Wegener
EXECUTIVE
L Sengstock, Acting Chief Executive Officer & Director Infrastructure Services
L Jensen, Acting Director Environment & Sustainable Development (via Microsoft Teams)
T Grauf, Acting Director Corporate Services (via Microsoft Teams)
D Iezzi, Director Executive Services (via Microsoft Teams)
K Contini, Director Community Services (via Microsoft Teams)
APOLOGIES
Nil
The meeting commenced at 10.01am.
2. CONFIRMATION OF MINUTES
Committee Resolution
Moved: Cr Finzel
Seconded: Cr Lorentson
The Minutes of the General Committee Meeting held on 17 January 2022 be received and
confirmed.
Carried unanimously.
3. PRESENTATIONS
Nil.
4. DEPUTATIONS
1. DAVID MCCREADY, GOETZ VON SCHWEINFURTH & JAN DAVEY
(via Microsoft Teams)
Topic: 30 Toulambi Street Zoning to Environmental Management & Conservation
Zone
Page 2 of 26
Section 3
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
5. ITEMS REFERRED FROM COMMITTEES
PLANNING & ENVIRONMENT COMMITTEE
1 PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY FOR NOVEMBER
& DECEMBER 2021
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Stewart, inform the meeting that I have a declarable conflict of interest in this matter in relation to
the application by Altum Constructions in Item 31 – MCU20/0150.1. I have a close personal friendship
with Leigh and Rob McCready, who are associated with the applicant. As a result of my conflict of
interest I will now leave the meeting room while the matter is considered and voted on.
Cr Stewart left the meeting.
In accordance with Chapter 5B of the Local Government Act 2009, Cr Finzel provided the following
declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Finzel, inform the meeting that I have a declarable conflict of interest in this matter in relation to
the application by Altum Constructions in Item 31 – MCU20/0150.1. Leigh McCready who is
associated with the applicant was involved in a volunteer capacity with my 2020 election campaign
where I was one of three candidates that ran as a group known as 'Future Noosa' (which is no longer
an entity). As a result of my conflict of interest I will now leave the meeting room while the matter is
considered and voted on.
Cr Finzel left the meeting.
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the following
declaration to the meeting of a prescribed conflict of interest in this matter:
I, Cr Stockwell declare I have a prescribed conflict of interest in this matter as follows: Suncoast
Building Approvals are identified as the applicant in number 26 for Development Application
EXE21/0035. I contracted Suncoast Building Approvals to undertake Building Certification for my
proposed residence in Boreen Point on the 29 November 2021. This process is currently underway.
The total fees associated with the completion of the certification and inspection regime is $5,904 which
includes Noosa Council Plumbing and Drainage fees. As a result of my conflict of interest I will now
leave the meeting room while the matter is considered and voted on.
Cr Stockwell left the meeting.
Committee Recommendation
Moved: Cr Wegener
Seconded: Cr Lorentson
That Council note the report by the Development Assessment Manger to the Planning &
Environment Committee Meeting dated 8 February 2022 regarding planning applications that
have been decided by delegated authority.
Carried unanimously.
Cr Stockwell, Cr Stewart and Cr Finzel returned to the meeting
2 REFER TO CLOSED SESSION AT ITEM 7 – (REPORT 10)
Page 3 of 26
Section 4
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
SERVICES & ORGANISATION COMMITTEE
3 2021 DELEGATIONS OF AUTHORITY ANNUAL REVIEW
Committee Recommendation
Moved: Cr Lorentson
Seconded: Cr Stockwell
That Council note the report by the Governance Officer to the Services & Organisation
Committee Meeting dated 08 February 2022 and adopt:
A. New Delegations - Pursuant to section 257 of the Local Government Act 2009, to
delegate the powers of the Local Government outlined in the Delegations of Authority
provided at Attachment 1, to the Chief Executive Officer of Council;
B. Updated Delegations - Pursuant to section 257 of the Local Government Act 2009, to
delegate the powers of the Local Government outlined in the Delegations of Authority
provided at Attachment 2, to the Chief Executive Officer of Council; and
C. Unchanged Delegations - Pursuant to section 257 of the Local Government Act 2009,
to delegate the powers of the Local Government outlined in the Delegations of Authority
provided at Attachment 3, to the Chief Executive Officer of Council.
Carried unanimously.
6. REPORTS DIRECT TO GENERAL COMMITTEE
4 30 TOULAMBI STREET, NOOSA HEADS DESCRIBED AS LOT 15 RP129286 - SITE
INVESTIGATION FOR SOCIAL HOUSING AND MEMORANDUM OF UNDERSTANDING
WITH COMMUNITY HOUSING PROVIDER
Motion
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Council note the report by the Senior Strategic Planner to the General Committee
Meeting dated 14 February 2022 and agree to:
A. Not proceed with any further investigation at 30 Toulambi Street for social or affordable
housing;
B. Resolve to amend the Noosa Plan 2020 by having 30 Toulambi Street included in the
Environmental Management and Conservation Zone;
C. Delegate to the Chief Executive Officer to finalise the details of a Memorandum of
Understanding with Coast2Bay Housing Group to allow collaboration and
investigations for social housing/affordable housing outcomes on Council owned land
and other land or opportunities across the Shire.
D. Invite the Federal Member for Wide Bay to a roundtable meeting to discuss the
implications of the phase-out of the National Rental Assistance scheme.
Page 4 of 26
Section 5
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
Amendment No.1
Moved: Cr Jurisevic
Seconded: Cr Wegener
That the item E be added to read:
E. Prepare an updated Management Plan for Pinnaroo Park in accordance with the Noosa
Bushland Reserve Strategic Management Plan and refer the consideration of this to
the 2022/2023 budget process.
Carried unanimously.
Amendment No.2
Moved: Cr Lorentson
Seconded: Cr Finzel
That item F be added to read:
F. Acknowledge the commitment, dedication, local knowledge and years of volunteering
work from the former Pinnaroo Park Community Bushland Care Group and adjacent
residents who have assisted with management activities within the Reserve, including
assisting with the control of environmentally damaging weed species, assisting with
revegetation of denuded areas by planting local native species and for providing
opportunities for community members to connect and become involved in the
management of bushland values of the area.
Carried unanimously.
Committee Recommendation
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Council note the report by the Senior Strategic Planner to the General Committee
Meeting dated 14 February 2022 and agree to:
A. Not proceed with any further investigation at 30 Toulambi Street for social or affordable
housing;
B. Resolve to amend the Noosa Plan 2020 by having 30 Toulambi Street included in the
Environmental Management and Conservation Zone;
C. Delegate to the Chief Executive Officer to finalise the details of a Memorandum of
Understanding with Coast2Bay Housing Group to allow collaboration and
investigations for social housing/affordable housing outcomes on Council owned land
and other land or opportunities across the Shire.
D. Invite the Federal Member for Wide Bay to a roundtable meeting to discuss the
implications of the phase-out of the National Rental Assistance scheme.
E. Prepare an updated Management Plan for Pinnaroo Park in accordance with the Noosa
Bushland Reserve Strategic Management Plan and refer the consideration of this to
the 2022/2023 budget process.
F. Acknowledge the commitment, dedication, local knowledge and years of volunteering
work from the former Pinnaroo Park Community Bushland Care Group and adjacent
residents who have assisted with management activities within the Reserve, including
assisting with the control of environmentally damaging weed species, assisting with
revegetation of denuded areas by planting local native species and for providing
opportunities for community members to connect and become involved in the
management of bushland values of the area.
Carried unanimously.
Page 5 of 26
Section 6
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
5 MCU21/0162 - APPLICATION FOR A MATERIAL CHANGE OF USE – COMMUNITY USE
(SURF MUSEUM), FOOD AND DRINK OUTLET, INDOOR SPORT AND RECREATION
AND OFFICES AT 3 HILTON TERRACE, TEWANTIN
Committee Recommendation
Moved: Cr Stewart
Seconded: Cr Stockwell
That Council note the report by the Development Planner to the General Committee Meeting
dated 14 February 2022 regarding Application No. MCU21/0162 for a Development Permit
for Material Change of Use - Community Use (Surf Museum), Food and Drink Outlet
(Restaurant), Indoor Sport and Recreation (Gym) & Offices situated at Noosa Lakes Resort
3 & 95/3 Hilton Tce Tewantin:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
TP101 A Site Plan, Skeco Building Design 13/08/21
TP202 A Existing First Floor Plan, Skeco Building Design 13/08/21
(annotated)
TP203 A New Ground Layout Plan, Skeco Building 13/08/21
Design (annotated)
TP204 A Café Bar Restaurant, Skeco Building Design 13/08/21
TP205 A Gymnasium, Skeco Building Design 13/08/21
Nature and Extent of Approved Use
3. Service vehicle movements associated with the approved use (including loading and
unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday and
not at all on Sundays or public holidays.
4. The outdoor dining area associated with the Food and Drink establishment must not
exceed 39m2.
5. Classes in the gymnasium are limited to a maximum of 10 people at any given time
(excluding staff).
6. The offices must be in accordance with the approved first floor plan, and include a
minimum of 16 small office tenancies, with rooms 17 and 18 comprising a shared multi-
purpose room and boardroom.
Currency Period
7. This development approval lapses if the use has not happened by 17 February 2028,
unless an application to extend the currency period is approved by Council.
Street Identification
8. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Page 6 of 26
Section 7
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
Damage to infrastructure
9. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Building Appearance
10. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties. Where screened by landscaping, landscaping beds
must be at least 1.5 metres wide.
No part of the site may be used for outdoor storage of materials unless specified on
the Approved Plans or the conditions of this Decision Notice. Materials stored outside
of the building must not exceed 4 metres in height or half the height of the building,
whichever is the greater.
Car Parking
11. A minimum of 31 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the uses are open for business. All
car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
12. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Landscaping Works
13. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. the works shown on the Approved Plans
b. revitalisation of the existing landscape beds and landscape setbacks along the
Hilton Terrace Road frontage of the subject site (where the conference building
is located), exclusive of the access driveway, generally uncompromised by
infrastructure items.
14. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
15. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
B. Refuse the proposed Offices for the following reasons:
1. The proposed Offices are not consistent with the purpose of the Tourist
Accommodation Zone as the use does not support short-term accommodation
and tourist attractions.
2. The proposed Offices are not consistent with Overall Outcomes (2)(a), (2)(b) and
(2)(y) and Performance Outcomes PO1, PO2, PO3 and Acceptable Outcome 3.2
of the Tourist Accommodation Zone Code because:
a. The offices will not complement and enhance the function and
attractiveness of the areas a visitor destination as the offices do not cater
to the needs of visitors or residents enjoying the area.
Page 7 of 26
Section 8
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
b. The offices will not serve visitors and preserve the role of the area as
tourism focus area.
c. Offices are not intended to establish in the Tourist Accommodation zone
unless they support the area’s accommodation facilities and tourism and
recreation activities.
3. The proposed offices are contrary to the Strategic Intent and Outcomes for the
Shire as commercial offices are intended to be located in the defined centres and
key visitor areas intended for tourism activities.
4. There is no need for additional land or floor space outside the designated
business centres for offices.
B. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The proposal is consistent with the Tourist accommodation zone overall outcome
2(b) which envisages that visitor accommodation in the urban areas is supported
by a mix of business activities which create a vibrant atmosphere and
complement and enhance the function and attractiveness of the area as a visitor
destination
2. The office space will encourage business tourism and act as an incubator for
start-up businesses and is of a scale that is ancillary to the visitor
accommodation.
3. The office space is of a nature and scale that is compatible with the mixed-use
character and coastal amenity of the area.
4. The proposed office space will not compromise the viability of the Noosa Shire
centres hierarchy considering the specific nature of office space and it small
gross floor area.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried unanimously.
6 ORGANISATIONAL STRUCTURE
Committee Recommendation
Moved: Cr Finzel
Seconded: Cr Wegener
That Council note the report by the Director Executive Services Department to the General
Committee Meeting dated 14 February 2022 and adopt the Noosa Council Organisational
Structure as set out in Attachment 1 to the report.
Carried unanimously.
Page 8 of 26
Section 9
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
7 COUNCILLOR REPRESENTATION ON COUNCIL OF MAYORS WORKING GROUPS
Committee Recommendation
Moved: Cr Stewart
Seconded: Cr Lorentson
That Council note the report by the Acting Chief Executive Officer to the General
Committee Meeting dated 14 February 2021 and
1. Appoint Cr Stewart as Council’s representative on the SEQ 2032 Legacy Working
Group;
2. Appoint Cr Joe Jurisevic as Council’s representative and Cr Tom Wegener as the proxy
for the SEQ Waste Working Group;
3. Appoint Cr Amelia Lorentson as Council’s representative and Cr Karen Finzel as the
proxy for the SEQ Economic Development Working Group.
Carried unanimously.
8 FINANCIAL PERFORMANCE REPORT – JANUARY 2022
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Stewart
That Council note the report by the Financial Services Manager (Acting) to the General
Committee Meeting dated 14 February 2022 outlining January 2022 year to date financial
performance against budget, including changes to the financial performance report with the
inclusion of key financial sustainability indicators.
Carried unanimously.
9 OPERATIONAL PLAN PROGRESS REPORT – SECOND QUARTER 2021-22
Committee Recommendation
Moved: Cr Wegener
Seconded: Cr Stockwell
That Council note the report by the Chief Executive Officer to the Services and Organisation
Committee Meeting dated 14 February 2022 regarding the 2021-22 Operational Plan and:
A. Note the progress report for the 2021-22 Operational Plan to 31 December 2021
provided as Attachment 1; and
B. Note the status of Council’s Key Performance Indicators provided as Attachment 2.
Cr Finzel left the meeting (offline due to power outage)
Carried unanimously.
Cr Finzel returned to the meeting.
Page 9 of 26
Section 10
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
7. CLOSED SESSION
10 MCU21/0013 & OPW21/0031 – PLANNING & ENVIRONMENT COURT
APPEAL NO. BD2677 OF 2021 – REFUSAL OF AN APPLICATION FOR MULTIPLE
DWELLING UNITS (19 UNITS), FOOD & DRINK OUTLET, INDOOR SPORT &
RECREATION, HEALTH CARE SERVICE, OFFICE & OPERATIONAL WORKS AT 30-32
DOONELLA ST, TEWANTIN
In accordance with Chapter 5B of the Local Government Act 2009, Cr Jurisevic provided the following
declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Jurisevic declare I have a declarable conflict of interest in this matter as the matter is a planning
application for a Doonella St property that is at least in part owned by Chris Wright, as I understand it.
My family and I have had a close relationship with Chris Wright and his family over the years that we
have lived in Tewantin. The nature of the relationship stems from my wife having worked for Chris’
wife, Kelly and in the same office where Chris’ business is located. Kelly was also the Treasurer of the
Sunshine Beach State High School P&C during my term as P&C President. My wife and I attended
Chris and Kelly’s wedding as well as several social gatherings at each other’s houses over the years
as our children were close friends and attended the same playgroup and schools growing up. As a
result of my conflict I will leave the meeting room while the matter is considered and voted on.
Cr Jurisevic left the meeting.
CLOSURE OF THE MEETING TO THE PUBLIC
Committee Resolution
Moved: Cr Stockwell
Seconded: Cr Lorentson
That the meeting be closed to the public pursuant to section 254J(3) of the Local Government
Regulation 2012 for the purpose of discussing Legal advice obtained by the local government
or legal proceedings involving the local government including, for example, legal proceedings
that may be taken by or against the local government.
Carried unanimously.
RE-OPENING OF THE MEETING TO THE PUBLIC
Committee Resolution
Moved: Cr Lorentson
Seconded: Cr Finzel
That the meeting be re-opened to the public.
Carried unanimously.
Committee Recommendation
Moved: Cr Lorentson
Seconded: Cr Stewart
That Council note the report by the Manager Development Assessment to the General
Committee Meeting dated 8 February 2022 regarding Planning & Environment Court Appeal
No. BD267 of 2021 and agree to settle the appeal generally in accordance with the following
conditions:
MATERIAL CHANGE OF USE - MCU21/0013
PLANNING
When Conditions must be Complied With
Page 10 of 26
Section 11
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SD01 13 Site Plan, prepared by Archicology P/L 08/07/21
SD02 12 Ground / Carpark Plan, prepared by Archicology P/L 08/07/21
SD03 10 Level 1 Plan, prepared by Archicology P/L 31/05/21
SD3A 2 LHA-SDA Compliance Plan, prepared by Archicology P/L 14/05/21
SD04 6 Level 2 Plan, prepared by Archicology P/L 23/04/21
SD06 6 Roof Plan, prepared by Archicology P/L 31/05/21
SD10 10 Elevations, prepared by Archicology P/L 08/07/21
SD11 10 Elevations, prepared by Archicology P/L 08/07/21
SD12 7 Sections A, B, prepared by Archicology P/L 23/04/21
SD13 7 Sections C, D, prepared by Archicology P/L 14/05/21
SD14 10 3D Impression 01, 02, prepared by Archicology P/L 08/07/21
SD15 9 3D Impression 03, 04, prepared by Archicology P/L 08/07/21
SD16 6 3D Impression 05, 06, prepared by Archicology P/L 23/04/21
SD17 6 3D Impression 07, prepared by Archicology P/L 23/04/21
Nature and Extent of Approved Use
3. No more than one Food and drink outlet is approved to operate at any one time and
must be located in one tenancy only as identified on the approved plans of
development. The Food and drink outlet must only operate between the hours of 7am
and 9pm, 7 days per week.
4. Class sizes for the Indoor Recreation use are not to exceed 5 persons at any one time
between the hours of 9am and 5pm.
5. All dwelling units must have a gross floor area of no more than 100m 2 pursuant to the
definition of a ‘small dwelling’ under the Noosa Plan 2020.
6. Service vehicle movements associated with non-residential uses on the premises
(including loading and unloading) must not occur outside the hours of 7am to 6pm
Monday to Saturday and not at all on Sundays or public holidays. The requirements of
this condition must be included in the Community Management Statement for any body
corporate for the subject site.
Currency Period
7. This development approval lapses if the use has not happened by 17 February 2028,
unless an application to extend the currency period is approved by Council.
Building Height
8. The maximum height of the development must not exceed the building height and
storeys shown on the approved plans.
9. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the buildings do not exceed the maximum height requirement of this Decision
Notice.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
Page 11 of 26
Section 12
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond
or guaranteed sum to effect compliance with conditions.
Built form
11. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining
properties.
12. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like, except where required to
satisfy any privacy condition of this Decision Notice.
13. External finishes must be as per the approved plans of development.
14. External colours must be muted environmental tones that blend with the natural
environment.
15. The Energex PMT and the Fire hydrant booster must be finished in a colour that blends
with the natural environment and the development.
Communal Recreation Areas
16. Communal recreation area/s must be provided as shown on the approved plans of
development.
Street Identification
17. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Water & Sewer Connections
18. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
19. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
ENGINEERING
Site Access and Driveways
20. Sealed access driveways must be provided from Doonella Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with the conditions of this Decision Notice and must include in particular:
a. driveway crossovers generally in accordance with Council’s standard drawing
RS-051;
b. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning signage must
be provided near the exit ramp from the parking area to warn motorists of
pedestrian movement along the frontage street.
Car Parking
21. Thirty three (33) car parking spaces must be provided and marked on the site and
made available and accessible at all times. The works must be undertaken in
accordance with the conditions of this Decision Notice and must include in particular:
a. for the residential development, a maximum of 20 parking spaces within the total,
which are clearly marked for that purpose and accessible at all times; and
Page 12 of 26
Section 13
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
b. the balance of carparking for the commercial uses; and
c. 12 motorcycle spaces; and
d. disabled parking spaces as shown on the approved plans; and
e. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
22. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
23. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Pedestrian and Bicycle Facilities
24. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with the conditions of this Decision Notice and must
include in particular:
a. a 2 metre wide concrete footpath within the road verge, the same colour as the
existing (dark), for the entire length of the site’s frontage to Doonella Street;
b. a 2m wide concrete pathway for the full length of the ‘public thoroughfare’
easement, along the full length of the easement located along the northern
boundary
c. pedestrian pathways between the proposed car parking area and the building/s;
d. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels;
e. signage and lighting at strategic locations to direct people to building entries and
public toilet facilities;
f. bicycle parking spaces and lockers as shown on the approved Ground / Carpark
Plan (Plan SD02, Iss.12).
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with the conditions
of this Decision Notice.
Services
26. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
27. 27.Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
28. A 3 metre wide easement for “Public Thoroughfare” must be registered against the title
of the property in favour of Council. The easement must be located as shown, in red,
on Drawing No. SD03, titled “Level 1 Plan”, Issue 10, dated 31/05/2021 and prepared
by Archicology P/L.
29. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
Page 13 of 26
Section 14
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
registered against the title of the property.
30. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
32. All works must be carried out generally in accordance with geotechnical investigation
report 18151-001-Rev0, titled: “Proposed Commercial & Residential Development 30-
32 Doonella St Tewantin”, dated 22 June 2018 and prepared by Tectonic Geotechnical
and Environmental Engineers.
33. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the recommendations
contained in geotechnical investigation report 18151-001-Rev0, titled: “Proposed
Commercial & Residential Development 30-32 Doonella St Tewantin”, dated 22 June
2018 and prepared by Tectonic Geotechnical and Environmental Engineers, and that
the development has a minimum factor of safety against landslip of 1.5 in the long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
34. All fill and associated batters must be undertaken in accordance with the conditions of
this Decision notice, and must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
35. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
36. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
37. The retaining wall located to the north of the bio basin (shown on section D of
A6035/21/D1, E with a TOW of RL8.4) must be amended to not exceed 0.8m above
the NGL. The area between this retaining wall and the footpath further north can either
be tiered (retaining walls no greater than 0.8m above NGL) or battered (1:4) to the
footpath to the north.
Damage to Services and Assets
38. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Page 14 of 26
Section 15
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
Water quality
39. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must include in particular:
a. Water quality treatment features that achieve the following pollutant reduction
targets as measured by a MUSIC model developed in accordance with the Water
by Design MUSIC modelling guidelines;
b. the use of gravity stormwater drainage and not surcharge pits;
c. A stormwater quality treatment system must be provided for the development
that achieved 80% reduction in Total Suspended Solids, 60% reduction in Total
Phosphorous, 45% reduction in Total Nitrogen compared to an unmitigated
scenario. The works must be undertaken in accordance with an Operational
Works approval and the Water by Design Guidelines.
40. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A
copy of this document must be retained on the site together with the approved
Operational Works drawings for the stormwater quality treatment system and a detailed
life cycle costing of the system attached as an addendum. Records of all maintenance
activities undertaken must be kept and made available to Council upon request.
41. Any proposed Community Management Statement required for the development must
include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets
(Version 1) document and must include the full cost of maintaining the system in
accordance with that document.
42. Operating rainwater collection and stormwater harvesting tanks must be provided as
shown identified in section 6.2 of the Engineering Report & Stormwater Management
Plan report For Proposed Residential and Commercial Tenancies at 30-32 Doonella St
(A6035/21/ENG/RevB). The tanks must be provided in accordance with an Operational
Works approval.
43. Certification must be submitted to Council from a qualified person* which certifies that
the rainwater collection tank/s and associated reticulation has/have been installed in
accordance with the requirements of this Decision Notice.
*(Refer to Advisory Note)
Acid Sulfate Soils
44. All waters, including stormwater runoff, groundwater seepage and leachate must
achieve the following quality prior to release from the site at all times:
a. a pH range of 6.5-8.5 pH units;
b. 50mg/L maximum total suspended solids concentration;
c. 0.3mg/L maximum total iron concentration;
d. 0.2mg/L maximum total aluminium concentration; and
e. no visible plume at either the point of release from the site or within a waterway.
ENVIRONMENTAL HEALTH
Waste Storage
45. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened
from public places and neighbouring properties.
Page 15 of 26
Section 16
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
46. A bin wash area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
to the sewerage system which can be achieved by a bunded area, with a nib wall height
of 100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max
0.7m²). Alternatively, the waste area can be roofed, or any other appropriate design
approved by Council.
Noise
47. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
• 7am to 10pm: Maximum level allowable = background + 5dB(A)
• 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps
• 7am to 7pm: Maximum level allowable = background + 5dB(A)
• 7pm to 10pm: Maximum level allowable = background + 3dB(A)
• 10pm to 7am: No audible noise.
48. The certification must be submitted to Council, which certifies that operational noise
from any fixed plant and equipment complies with the requirements of this Decision
Notice.
Kitchen Exhaust (Food and drink outlet)
49. Kitchen exhaust points for the Food and drink outlet must be located and operated in
accordance with Australian Standard AS1668.2-2002 “The use of ventilation and air-
conditioning in buildings” (specifically Section 5.10 – Air Discharges).
50. The development must be constructed with reticulated ducting inside the building to
transfer kitchen exhaust fumes to a discharge point on the roof.
51. Submission of written certification must be provided from a suitably qualified person
confirming that the kitchen exhaust is constructed, installed and is operating in
accordance with Australian Standard AS1668.2-2002.
52. The assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building, and in a format approved by
Council.
Outdoor Lighting Devices
53. Lighting associated with the use must be designed, sited, installed and tested to comply
with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive
effects of outdoor lighting” using a control level of 1.
54. Certification must be submitted to Council from a qualified person which certifies that
all outdoor lighting devices comply with the requirements of this Decision Notice at the
time of commissioning.
For the purpose of certifying outdoor lighting devices for the development, a qualified
person is:
a. a Registered Professional Engineer of Queensland;
b. an environmental or electrical design consultant with a minimum of 3 years
current experience in the field of outdoor lighting.
LANDSCAPING
55. The development site must be landscaped. The works must be undertaken in
Page 16 of 26
Section 17
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
accordance Noosa Plan PSP 2 – Landscaping and generally in accordance with the
approved Landscaping Plans and in particular:
a. A 1m wide garden along the south side of the ‘public thoroughfare’ easement
must be provided which includes native species that effectively screen the
development and grow to a minimum mature height of 4m.
b. Plantings along the eastern side of the bio basin must grow to a minimum height
of 3-4m and provide screening to the car parking area.
c. Landscaping works to provide a suitable visual screening buffer between the
building and the easement with a minimum garden bed width of 800mm.
d. The proposed 25 litre pot size feature trees within the front setback (facing
Doonella Street) must be replaced with 45 litre pot size plants (the SYZ hem,
CUP ana, ELA ret, ACR imp species)
e. The existing street trees in the road reserve may be removed. If removed they
must be replaced with 4 x ex-ground Delonix regia (poinciana’s) as shown on
the approved operational works landscape plans.
56. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Signage
57. Advertising devices must comply with Council’s signage policy.
OPERATIONAL WORKS - OPW21/0031
Approved Plans
58. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SD02 12 Ground / Carpark Plan, prepared by 08/07/2021
Archicology P/L
A6035/21/EW01 F Earthworks Layout Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/R01 F Roadworks Layout Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/R03 E Roadworks Doonella Street – Cross 25/05/2021
Sections, prepared by Alta Engineering
A6035/21/R04 B Roadworks Setout Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/R08 A Roadworks Boundary Cross Sections, 25/05/2021
prepared by Alta Engineering
A6035/21/D01 E Stormwater Layout Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/D02 E Stormwater Drainage Details, prepared by 25/05/2021
Alta Engineering
A6035/21/D03 B Stormwater Drainage Setout Plan, prepared 25/05/2021
by Alta Engineering
A6035/21/WQ01 E Stormwater Treatment Catchment Plan, 25/05/2021
prepared by Alta Engineering
A6035/21/WQ02 E Stormwater Quality Layout Plan and Notes, 25/05/2021
prepared by Alta Engineering
A6035/21/WQ03 E Stormwater Quality Bio Basin Calculations 25/05/2021
and Details, prepared by Alta Engineering
Page 17 of 26
Section 18
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
CD-001 J Vegetation Management Plan, prepared by 2021.05.28
Project Urban
CD-002 L Landscape Plan – In Ground, prepared by 2021.05.28
Project Urban
CD-003 K Landscape Plan – In Ground, prepared by 2021.01.25
Project Urban
CD-004 I Landscape Plan – On Podium, prepared by 2021.01.25
Project Urban
CD-005 I Landscape Plan – Boundary Fences, 2021.01.25
prepared by Project Urban
CD-200 L Construction Details, prepared by Project 2021.01.25
Urban
CD-201 C Planting Schedule, prepared by Project 2021.01.28
Urban
CD-202 B Planting Schedule, prepared by Project 2021.07.07
Urban
CURRENCY PERIOD
59. The Currency Period for this development approval lapses if the development has not
substantially started by 17 February 2024, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
60. All necessary approvals from external service providers (e.g. Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
61. A condition report of the drainage system must be completed for agreement prior to
the prestart meeting. The condition report is to include a CCTV inspection of the
existing pipe and must include at least 50m upstream and downstream of all works.
62. A condition report including photographs of the frontage of the site must be completed
and submitted to council prior to the prestart meeting.
63. Certificates demonstrating currency of public liability insurance and works insurance
covering the works must be submitted to Council prior to the prestart meeting.
64. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500.
The pre-start meeting must include the relevant parties for the following aspects of the
works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
65. A Construction Management Plan must be submitted to Council prior to the pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased;
Page 18 of 26
Section 19
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
iii. Proposed fencing to the site during the construction phase of the
development;
iv. Adequate parking arrangements for construction workers;
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures;
c. Provision for safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased;
d. Works programme identifying key components of the works and their respective
durations;
e. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues;
f. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
g. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details;
h. identification of complaint management procedures including:
i. contact details for the on-site manager;
ii. dispute resolution procedures;
i. For haulage operations involving significant volumes of excavated material being
transported off the site: details on the location of external site, the haulage route,
type of vehicle to be utilised during excavation operations and frequency of
usage. NB any damage to the existing road system as a result of haulage
operations must be fully repaired at the applicant’s expense.
66. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five business
days of the change occurring.
67. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
DURING CONSTRUCTION
Engineering
68. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal works
are involved, such confirmation must be submitted for the respective hold points prior
to any site inspection by Council Officers.
69. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines;
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
Page 19 of 26
Section 20
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
quality devices to be constructed on site.
Roadworks
70. The installation and/or modification of any traffic signs, street signs, line marking and
Raised Reflective Pavement Markings (RRPMs) must be in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD). New or relocated signage must
be installed using the VLok installation system. All new signage must be Class 1
retroreflective material in accordance with AS 1906.1, Retroreflective materials and
devices for road traffic control purposes – Part 1: Retroreflective sheeting.
71. The developer must notify Council’s Traffic Engineer for any works involving the
removal or modification of existing council traffic signs and/or parking bays prior to such
works commencing.
Pavement Design and Construction
72. Pavement design for privately owned works must be undertaken in accordance with
the relevant standards. Structural integrity of the driveway and car park areas will
remain the responsibility of the property owner/developer and must be certified by an
RPEQ.
Works within Road Reserve/Reinstatement
73. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the proposed
closure and all requirements complied with.
74. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable
transition to existing road and verge/footpath profiles.
75. Electrical conduits or other services proposed to be installed within existing and
proposed road reserves under existing sealed carriageways, concrete pathways,
concrete/sealed driveways or significant vegetation must be installed by boring.
Trenching is not permitted, unless specifically approved by Council.
Pathways
76. All pathways must be constructed in accordance with the following requirements:
a. All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065;
b. Provision must be made for disabled access at all kerb crossings associated with
pathways, in accordance with Council's current standards;
c. All paths must have a slip resistant surface, with a colour to match the existing
(dark);
d. Expansion and contraction joints must provide a flush finish. Installation of joints
by saw cutting is preferred to ensure a smooth ride for cyclists;
e. Pram ramps where required.
f. The required work includes any modifications to ensure the footpath finishes
flush with all existing service covers and the like, or alternatively these services
are raised or altered, so as not to create a pedestrian safety hazard.
77. Pathways must:
a. terminate in a manner that ensures smooth transition to existing surfaces for
public safety;
b. be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
Page 20 of 26
Section 21
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
AS1428 Design for access and mobility.
Site Access and Driveways
78. Driveway crossovers must be constructed generally in accordance with Council’s
Standard Drawing RS-051.
79. Any existing unnecessary or redundant property accesses must be removed, and the
kerb, footpath and verge area reinstated to match the existing footpath and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and grass seed or turf, and must be maintained by the developer until
established.
80. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete;
b. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties;
c. Where there is an existing pedestrian path, a matching crossfall must be provided
for the driveway on the alignment of the path, for the full width of the path;
d. The property accesses must be located a minimum of 1m clear of existing power
poles, streetlights or other signage. The developer is responsible for any
necessary relocation of existing services to provide this clearance and must
contact the relevant service authorities and comply with their requirements in
relation to these works.
Earthworks and Retaining Walls
81. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical testing undertaken in accordance with Section 8 of the Standard, and to
a minimum of ‘Level 2’ as defined in Appendix B. Test results as required by AS 3798,
and a certificate of quality and uniformity of fill must be provided by a RPEQ and
submitted to Council prior to Council undertaking the On-Maintenance inspection.
82. Fall protection must be provided to retaining walls that are over 1m high.
83. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies;
b. 1 in 4 for grassed areas;
c. 1 in 3 for planted areas;
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
84. Appropriate scour protection must be provided at the outlet of all stormwater pipes
including temporary outlets.
85. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g. by blocking or interfering with natural overland
flows).
86. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Page 21 of 26
Section 22
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
Landscaping
87. The development site must be landscaped. The works must be undertaken in
accordance Noosa Plan PSP 2 – Landscaping and generally in accordance with the
approved Landscaping Plans and in particular:
a. The along the south side of the easement must include native species that
effectively screen the development and grow to a minimum mature height of 8m.
b. Plantings along the eastern side of the bio basin must grow to a minimum height
of 4m and provide screening to the car parking area.
c. The proposed 25 litre pot size feature trees within the front setback (facing
Doonella Street) must be replaced with 45 litre pot size plants
d. The existing street trees in the road reserve may be removed. If removed they
must be replaced with 4 x ex-ground Delonix regia (Poinciana’s) 400L trees as
shown on the approved landscape plans.
88. The finished level of all mulch in garden beds and landscaped medians is to be a
minimum of 50mm below the level of the adjacent top of kerb. All landscaping is to be
constructed in accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
89. Suitable root barriers must be installed where proposed trees are adjacent to paths,
pavement etc in accordance with Council’s Planning Scheme Policy PSP2
Landscaping.
Damage to Services and Assets
90. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
a. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Erosion & Sediment Control - Works adjacent to High Ecological Significance Water
91. Prior to the requesting the pre-start meeting the applicant must engage a Certified
Professional and Erosion Control to prepare and provide to Council scheduling plans
for the development which demonstrate that construction can be undertaken in a
manner consistent with Accepted best practice standards and all relevant conditions of
this approval. * (Refer to Advisory Note).
92. The applicant must engage a CPESC, or other suitably trained professional, (i.e. who
has completed the CPESC training, and has a minimum of 5 years site experience
supervising Erosion and Sediment Control management) to undertake weekly site
visits to inspect and certify whether or not required Erosion and Sediment controls are
properly installed and maintained to achieve the requirements on this approval.
93. Construction must be managed such that less than 2,500m2 of soil is exposed at any
time.
94. Exposed soil is only permitted between the months of May to October, and all
catchments with these soils must drain to sediment treatment features to achieve
50mg/L TSS prior to release of waters from the site. Outside these months the site
must achieve a C factor of 0.05 at all times.
95. A construction hold point with a council delegate and supervising RPEQ must be
established prior to commencement of cut to fill earthworks for each stage of the
development. The hold point must be held as soon as reasonably practical and prior to
Page 22 of 26
Section 23
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
the first rain event forecast following initial tree clearing or removal of soil stabilising
material for each stage. At the hold point inspection, all required sediment basins,
drains and bunds to divert waters away from disturbed soil or soils about to become
exposed through cut to fill activities must be installed. All areas that will not require
earthworks in the imminent cut to fill operation must be stabilised to prevent
entrainment of sediments into receiving waters.
96. Cut to fill earthworks must not commence until after the Supervising CPESC has
certified that all installed erosion and sediment controls required by this approval are
sized in accordance with conditions of the approval and the written acceptance of the
certification is provided to the supervising RPEQ by Council officers.
97. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental
Protection Regulation 2019) must not be released from the site or to waters within the
site, or be likely to be released should rainfall occur, unless all reasonable and
practicable measures are taken to prevent or minimise the release and concentration
of contamination.
98. Sediment and erosion control measures must be in place prior to works commencing.
If such measures are not in place or are not satisfactory, “on the spot” fines may be
issued. Such fines can be issued if sediments from the site are found to enter or have
the potential to enter Council’s stormwater system, natural waterways, any
downstream stormwater filtration system or adversely impacting on other properties.
The sediment and erosion control design and measures have NOT been approved, it
is the site's Supervising Engineer who is responsible for ensuring that the sediment
and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with
"best practise" methods;
b. Been revised by an RPEQ or CPESC to address the issues raised by changes
in the projected construction schedule and/or methods;
c. Been revised to address predicted rainfall events, and
d. Achieve the desired environmental outcomes.
99. Council may request further controls to be installed should the implemented measures
be found inefficient.
100. The erosion and sediment control measures must be designed, installed and
maintained in accordance with the supervising engineer instructions and the current
best practice standards * (Refer to Advisory Note).
101. The developer must ensure non-essential exposure of soil is prevented by restricting
the extent of disturbance and minimising the duration of soil exposure to adverse
weather conditions and effectively turf, cover or stabilise any disturbed area without
delay and prior to rainfall occurring.
102. The developer in conjunction with the engaged CPESC must ensure measures
installed to divert the upstream water are designed and certified by the supervising
RPEQ and installed prior to commencement of bulk earthworks.
103. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles
and/or machinery. It is essential to implement appropriate approved erosion and
sediment control measures throughout the site during all phases of construction
including vehicle shakedown pad/grid (or similar) at the access to the construction site.
Where sediments or other contaminants are deposited on a road, they must be
removed so as not to enter Council’s drainage system or waterways.
Page 23 of 26
Section 24
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
104. Prior to the completion of the development, all site surfaces must be effectively
stabilised. For the purpose of this condition, an effectively stabilised surface is defined
as one that does not, or is not likely to result in visible evidence of soil loss caused by
sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Water Sensitive Design
105. The active filter media of the bioretention device must be 27m². Active filter media area
is the area of the bioretention basin surface that is not covered by any impermeable
structure such as a sediment forebay, riser, etc.
106. During construction and establishment of the bioretention devices, the supervising
RPEQ must certify forms contained in section 3.15 of the Construction and
Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
Design, 2009). These forms and certification must be submitted to council prior to the
sealing of the survey plan.
107. A construction hold point with a council delegate must be established once the
bioretention device underdrainage pipe work is installed. At the time of inspection, a
sample of the drainage layer, transition layer, and filtration media materials must be
stockpiled onsite accompanied by laboratory results that demonstrate that the media
complies with the specifications contained in the latest version of the Guidelines for
Soil Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and
that the minimum hydraulic conductivity of 180mm/hr or as specified on the approved
engineering plans will be achieved. The drainage layer, transition layer, and filtration
media materials shall not be installed until the catchment draining to the bioretention
device has 80% groundcover as determined by council’s delegate.
108. Eighty percent (80%) of the catchment flowing to the bioretention basin must be
effectively stabilised prior to the construction holdpoint for the Bioretention device.
109. Prior to the release of the plan of survey, the supervising RPEQ must certify must certify
that all hardstand areas of the development drain to a bioretention device designed
and constructed in accordance with all relevant conditions of this approval, the Water
by Design Bioretention Technical Design Guidelines, relevant aspects of the IPWEAQ
Standard Drawing WSUD-drawing series and Construction and Establishment
Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009).
Bioretention Devices - Landscaping
110. Landscape plans must include a mixture of at least five of the following species for
planting in the bioretention basin extended detention surface at a minimum density of
8 plants/m2:
a. Carex appressa
b. Carex fascicularis
c. Ficinia nodosa
d. Juncus usitatis
e. Lomandra longifolia
f. Ghania sieberiana
111. Landscape plans for the areas surrounding the bioretention basin filter media footprint
must be arranged to minimise shading to the filter media footprint are. Suitable plants
include the following:
a. Cared appressa
b. Carex fascicularis
c. Ficinia nodosa
Page 24 of 26
Section 25
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
d. Juncus usitatis
e. Lomandra longifolia
f. Ghania sieberiana
g. Banksia robur
h. Dianella brevipendunculata
i. Themada triandra
j. Cymbopogan refractus
k. Melaleuca thymifolia
112. Where landscaping/garden beds are proposed adjacent to the bioretention basin, or
where the basin is located adjacent to naturally forested areas, a 900mm deep root
barrier must be installed to the interface between the landscape/garden/forest area and
the bioretention basin to prevent root intrusion to the biobasin infrastructure.
113. Landscaping to the surface of the bioretention basin filter media area must not
commence until 80% of building work within each contributing catchment is complete
or after 3 years, whichever occurs first. An uncompleted works bond of 150% of the
value of the planting to the surface of the bioretention basin filter media area must be
provided to Council prior to the release of the Plan of Survey.
114. Where required, mulch within the batters of bioretention basins must be installed in a
manner that it will not escape into receiving stormwater drainage infrastructure or water
courses.
Bioretention Devices - Education
115. The development shall be provided with approved permanent signage that is deigned
in accordance with Noosa’s Look and Feel document to educate the public on the
function of the bioretention basin. The wording for the signage for each bioretention
basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the
pollution of our waterways by reducing the amount of heavy metals, litter, suspended
solids, and nutrients discharged to Lake Doonella”.
FOLLOWING CONSTRUCTION / PRIOR TO THE ON-MAINTENANCE INSPECTION
Certification
116. Upon completion of the work a certificate must be issued by an RPEQ certifying that
the works have been constructed in accordance with the Operational Works permit.
117. A condition report of the drainage system must be completed for agreement prior to
requesting the works to be accepted On-Maintenance. The condition report is to
include a CCTV inspection of the existing pipe and must include at least 50m upstream
and downstream of all works.
As Constructed Plans and ADAC XML Files (Council)
118. Prior to acceptance of civil works to become Council assets “On Maintenance”,
satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As
Constructed” information must include:
a. As-Constructed Engineering Drawings. Data is to be submitted in an electronic
drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along
with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing
files), and;
b. ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
prepared in accordance with industry standards and recorded in “MGA - UTM56
/ GDA94” projection.
Page 25 of 26
Section 26
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
c. Please Note: Further information and advice relating to the as-constructed
drawing presentation, as-constructed survey capture and associated guidelines
for preparation of a compliant ADAC XML digital file are available on the webpage
titled “As-Constructed Guidelines” and accessible at the Noosa Council Website:
Planning & Development / Development Tools & Guidelines / As-Constructed
Guidelines.
d. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Licensed Surveyor in regard to the cadastral and locational information,
levels and applicable survey datum.
e. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering
works including but not limited to the drainage network and structures, finished
ground and pavement surface levels.
On Maintenance
119. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to the On-Maintenance inspection. To
achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance
with the requirements of this Permit;
b. as Constructed details in accordance with Council’s Planning Scheme Policy;
c. maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance
120. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
121. A re-inspection fee in accordance with Council’s Fees and Charge Register will be
charged where:
a. a Council inspection reveals works do not comply with approval requirements;
b. submitted certification falsely states works comply with approval requirements.
Carried unanimously.
The meeting closed at 2.16pm.
Page 26 of 26