GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
b. the balance of carparking for the commercial uses; and
c. 12 motorcycle spaces; and
d. disabled parking spaces as shown on the approved plans; and
e. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
22. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
23. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Pedestrian and Bicycle Facilities
24. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with the conditions of this Decision Notice and must
include in particular:
a. a 2 metre wide concrete footpath within the road verge, the same colour as the
existing (dark), for the entire length of the site’s frontage to Doonella Street;
b. a 2m wide concrete pathway for the full length of the ‘public thoroughfare’
easement, along the full length of the easement located along the northern
boundary
c. pedestrian pathways between the proposed car parking area and the building/s;
d. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels;
e. signage and lighting at strategic locations to direct people to building entries and
public toilet facilities;
f. bicycle parking spaces and lockers as shown on the approved Ground / Carpark
Plan (Plan SD02, Iss.12).
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with the conditions
of this Decision Notice.
Services
26. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
27. 27.Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
28. A 3 metre wide easement for “Public Thoroughfare” must be registered against the title
of the property in favour of Council. The easement must be located as shown, in red,
on Drawing No. SD03, titled “Level 1 Plan”, Issue 10, dated 31/05/2021 and prepared
by Archicology P/L.
29. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
Page 13 of 26