Delegated Report - Code - Planning OPW26 0061 (As Published)

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                   Street address:               15 Jirrima Cres Cooroibah Qld 4565

                   Real property description:       Lot 43 RP 136461

                   Planning Scheme:              Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works - Electrical and Street Lighting
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                          Plan No.              Rev.    Plan/Document Name                           Date

                          A251400               A       Locality Plan, Legend, Notes, Materials 15/04/2026
                                                        Summary & Ensar
                          Sheet 1 of 3

                          A251400               A       Electrical Reticulation Plan & Details       15/04/2026
                          Sheet 2 of 3

                          A251400               A       LV Schematic, Schedules,           Label   & 15/04/2026
                                                        Commissioning Plan
                          Sheet 3 of 3

               CURRENCY PERIOD
               2.      The Currency Period for this development approval lapses if the development has not
                       substantially started by 6 July 2028, unless an application to extend the currency period is
                       approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                       Engineering
               3.      All necessary approvals from external service providers and external parties on which the
                       development works are proposed have been obtained and a copy supplied to Council.
               4.      Any changes to the details associated with the supervising RPEQ or Principal Contractor
                       during construction, must be notified to council in writing within five business days of the
                       change occurring.
               5.      Any conflict between the development and an existing or proposed service must be referred
                       to the relevant service authority for determination prior to commencement of works.




                                                                                                         Page 4 of 7

Document Set ID: 24769858
Version: 5, Version Date: 07/07/2026
Log in to download the original file

Delegated Report - Code - Planning OPW26 0061 (As Published).pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.