Delegated Planning Report Conditions - Approval (As Publihed) · OPW25/0077
Plan o. Rev. Plan/Document Name Date
PTG/02023 – 0001 1 Interim Geotechnical Investigation 28 April
Report – Proposed Residential 2025
Development
Prepared by PTG Consulting
ADG1808.25 0 Dewatering Management Plan May 2025
Prepared by ADG Consulting
Amendments Further acid sulphate soil investigations are required. An
updated Geotechnical Investigation Report is required including
an acid sulphate soils management plan. An updated
Dewatering Management Plan is required addressing the
management of acid sulphate soils and noise pollution.
23 DA05 Landscape Trees, prepared by Skale 1.08.2025
Amendments The above plans must be submitted to Council for agreement
prior to a prestart meeting and incorporate the following:
a. Updated landscape plans that include Acronychia
imperforate planted along the entire north east and
south east boundary.
b. Updated landscape plans that include substantial
screening shrubs along the entire southeastern
boundary where adjacent to the driveway that includes
a mixture of the following:
i. Syzygium ‘Straight and Narrow’
i. Callistemon viminalis ‘Slim’
c. Landscape capable of screening the private open
space of the studio from the neighbouring property.
CURRENCY PERIOD
Currency Period
2. The Currency Period for this development approval lapses if the use has not substantially
started by 27 August 2031, unless an application to extend the currency period is approved
by Council.
Site Specific Conditions
3. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
Bonds must:
a. meet the requirements of Council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be calculated using a schedule of works and relevant bond equation.
Page 10 of 21
Document Set ID: 24062787
Version: 1, Version Date: 27/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Planning Report Conditions - Approval (As Publihed)Related documentApplication case desk ↗
Delegated Planning Report Conditions - Approval (As Publihed).pdfRelated documentApplication case desk ↗
About this file
- File size
- 184 KB (small file)
- File type
No other editions are linked here.