Delegated Planning Report Conditions - Approval (As Publihed) · OPW25/0077

of 21

Text shows just the words. Original shows the document exactly as it was published.

                           Plan o.                  Rev.        Plan/Document Name                       Date

                           PTG/02023 – 0001         1           Interim Geotechnical Investigation 28           April
                                                                Report – Proposed Residential 2025
                                                                Development
                                                                Prepared by PTG Consulting

                           ADG1808.25               0           Dewatering Management Plan               May 2025
                                                                Prepared by ADG Consulting

                           Amendments               Further acid sulphate soil investigations are required. An
                                                    updated Geotechnical Investigation Report is required including
                                                    an acid sulphate soils management plan. An updated
                                                    Dewatering Management Plan is required addressing the
                                                    management of acid sulphate soils and noise pollution.

                           23                       DA05        Landscape Trees, prepared by Skale       1.08.2025

                           Amendments               The above plans must be submitted to Council for agreement
                                                    prior to a prestart meeting and incorporate the following:
                                                           a.   Updated landscape plans that include Acronychia
                                                                imperforate planted along the entire north east and
                                                                south east boundary.
                                                           b.   Updated landscape plans that include substantial
                                                                screening shrubs along the entire southeastern
                                                                boundary where adjacent to the driveway that includes
                                                                a mixture of the following:
                                                                 i.    Syzygium ‘Straight and Narrow’
                                                                 i.    Callistemon viminalis ‘Slim’
                                                           c.    Landscape capable of screening the private open
                                                                 space of the studio from the neighbouring property.


               CURRENCY PERIOD
                      Currency Period
               2.     The Currency Period for this development approval lapses if the use has not substantially
                      started by 27 August 2031, unless an application to extend the currency period is approved
                      by Council.
                      Site Specific Conditions
               3.     A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
                      pre-start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
                      Bonds must:
                      a.        meet the requirements of Council’s relevant Planning Scheme Policy for performance
                                and uncompleted works.
                      b.        be calculated using a schedule of works and relevant bond equation.
                                                                                                        Page 10 of 21

Document Set ID: 24062787
Version: 1, Version Date: 27/08/2025

Used in these records

About this file

File size
184 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Planning Report Conditions - Approval (As Publihed).pdf · 184 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.