Delegated Planning Report Conditions - Approval (As Publihed) · OPW25/0077
b. Oversee installation of all tree protection fencing prior to commencement of any works
onsite (including any clearing).
c. Supervise tree protection within the council road reserve, and neighbouring properties
prior to, during and following construction in accordance with AS 4970, Protection of
trees on development sites.
d. Oversee approved tree removal in proximity to retained trees.
e. Undertake a risk assessment of all trees within striking distance of the development
works and site and carry out hazard removal and amenity pruning in accordance with
AS 4373, Pruning of amenity trees.
*(Refer to Advisory Note)
Vegetation Clearing
40. Removal of trees and vegetation must be undertaken by a qualified person* and must
include:
a. No damage to vegetation for retention.
b. Legal disposal of all removed vegetation and debris.
Fauna Management
41. Prior to felling or pruning, all trees are to be checked for wildlife (i.e. koalas, possums, birds
etc.) If wildlife is present, the tree vegetation must not be felled or pruned until the wildlife
has left vegetation or has been relocated by a qualified fauna spotter catcher.
*(Refer to Advisory Note)
Landscaping Works
42. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
43. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
44. Street trees must:
a. Meet AS2303 Tree stock for landscape use.
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
FOLLOWING CONSTRUCTION
Certification
45. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
46. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
Supervision/Certification
47. Prior to commencement of use the following (prepared by respective qualified persons* and
certifying compliance with approvals) must be submitted to Council:
a. Landscaping certification confirming all works have been constructed in accordance
with conditions of approval.
Page 15 of 21
Document Set ID: 24062787
Version: 1, Version Date: 27/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Planning Report Conditions - Approval (As Publihed)Related documentApplication case desk ↗
Delegated Planning Report Conditions - Approval (As Publihed).pdfRelated documentApplication case desk ↗
About this file
- File size
- 184 KB (small file)
- File type
No other editions are linked here.