Delegated Planning Report Conditions - Approval (As Publihed) · OPW25/0077

of 21

Text shows just the words. Original shows the document exactly as it was published.

               17.    The ‘Plumbing and Drainage Regulation 2019’ states that at demolition or removal of a
                      building requires the existing sanitary drain upstream from the connection point for a service
                      provider’s sewerage system must be sealed water tight. This work is deemed as Notifiable
                      Work and must be carried out by a suitably licenced plumber who shall submit an As
                      Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.
               18.    The ‘Plumbing and Drainage Regulation 2019’ states work necessary for installing, replacing
                      or removing a testable backflow prevention device is included work for Notifiable Work.
                      Removal must be carried out by a suitably licenced plumber who shall submit a Form 9
                      (Registration & Report on Inspection and Testing of Backflow Prevention Devices) and Form
                      4 (Notifiable Works Form) to the QBCC (Queensland Building Construction Commission)
                      within 10 days of completing the work. Notification to Council once works and document
                      submission is complete allows removal of backflow prevention devices from Council’s
                      backflow register.
               19.    All activities associated with the removal or demolition must be contained within the property
                      boundaries at all times with site gateways opening inwards and at approved locations only.
                      If the works cannot be contained within the site, a road and footpath permit must be applied
                      for.

               OPERATIONAL WORKS
                      Building and Construction Industry (Portable Long Service Leave) Levy
               20.    The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Resubmission of Amended Documents Required
               21.    The conditions of this Decision Notice require resubmission of the referenced Geotechnical
                      Investigation Report Prepared by PTG Consulting Rev 1 dated 28 April 2025 and Dewatering
                      Management Plan Prepared by ADG Consulting Rev 0 to Council with amendments. Please
                      address the amended documents to Council’s Development Assessment Branch with the
                      Reference No. MCU25/0054 & OPW25/0077.
                      Qualified Person
               22.    For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                      b.      has a degree in civil engineering or engineering geology; and
                      c.      has a minimum of 5 years experience in the field of geotechnical engineering or
                              engineering geology.
               23.    For the purpose of preparing an Acid Sulfate Soil and Groundwater Management Plan, a
                      qualified person is considered to be either:
                      a.      a Registered Professional Engineer of Queensland (RPEQ); or
                      b.      a soil scientist with a minimum of 5 years experience in the field of acid sulfate soils.
                      General Advisory Notes
               24.    Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.



                                                                                                         Page 18 of 21

Document Set ID: 24062787
Version: 1, Version Date: 27/08/2025

Used in these records

About this file

File size
184 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Planning Report Conditions - Approval (As Publihed).pdf · 184 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.