REFERENCED DOCUMENT - Weed Management & Vegetation Rehabilitation Plan - MCU13/0064
Plans and drawings: the text below has words only, no drawings.
TO §
abe “5”
cs
WM 2
&&
a 2
O=
WEED MANAGEMENT AND = 5
VEGETATION REHABILITATION en 6
PLAN CLL &
PROPOSED RESIDENTIAL DWELLING = i : 5 i
LOT 55 ON MCH1667 B38 2345
moameecss
MAKEPEACE ISLAND,
NOOSA NORTH SHORE
RECEIVED \~
For 25 MAY 2007 ir
ROBERT JAMES SHERRARD & GFT (TEE! Po
AD07631REHAB
MAY 2007
SHijs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 32 pages
Page 2
*
* *
{PB} 07 5493 3322 *
07 5493 3422 U @
(E} [email protected] : , *
PO Box 78 Wurtulla 4575 FE UE 0 IAAL Cy. i |
Powerful Owl Qld Pty Ltd Nvi roni I en a
T/A Duke Environmental .
ABN 59 11 368944 Environmental Management Consultants
| MEE Document Control nine
‘|i Revision saa | at Parenthood mmm | EEE Authorised.for Issue mM
| No. ma |i Date ma |‘ Authora| Reviewer |.Name ma || Document Status
0 15/05/07 | Stephen | Paula Paula Duke A
Hayes Duke :
A _- Approval B — Building Approval | C- Construction _| R— Revision
T~For Tender _| X - Information P — Preliminary
The content of this document is provided in strict commercial confidence. The content of this
document shall not be disclosed to any’ third party, without the express written authority of /
Duke Environmental. Copyright © Duke Environmental 2007.
AD07631REHAB
May 2007
SH/js:
Page 3
-3- Executive Summary Duke Environmental was commissioned by Robert James Sherrard and GFT )TEE) Pty Ltd to undertake this Weed Management and Vegetation Rehabilitation Plan. The site is located at Makepeace Island, Noosa North Shore in South East Queensland, and is described as Lot 55 on MCH1667. Proposal details associated with this plan consist of a development application (dwelling house) for Material Change of Use of premises. The aims of the report were to comply generally with requirements of the Land Protection (Pest and Stock Route) Management Act 2002, the Fisheries Act 1994 and to provide a framework for compliance with regard to relevant Local Legislation and Planning Guidelines. Objectives for the report involved providing detailed methodology for weed management and the development of rehabilitation works including plant schedule details, performance and monitoring requirements, corrective actions, timeframes, responsible persons and maintenance schedule/bond details; ensuring all environmental safeguards are carried out correctly and to provide a framework for managing site activities effectively. In general, It is considered that the site rehabilitation and weed management to provide benefits that, within the site context, outweigh the loss of mature trees resulting from the proposed development. Further, in our opinion, we consider the proposal to provide environmental gains generally above and beyond the existing situation. This report should be read in conjunction with the Ecological Assessment Report (Ref DE07631ECO) by Duke Environmental dated May 2007. AD07631REHAB May 2007 SHijs
Page 4
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
-4-
TABLE OF CONTENTS
INTRODUCTION.......cscssecsccssencccsssasesesteconessensssacecesesssnenneneseeceesseeasersseeanensesnneseesscannensvasea 6
1.1 Preamble ..........ccsccsssctssesessssesscensesnsessees sseeaccuscerseeseasecaesseesee .6
1.2 Aims and Objectives... .6
1.3 Site Location.......... . .7
1.4 Site Characteristics «0.00.2... .ccsssssescessserersenssessecsscerssesersesssortensecssanseneessenaae 7
PROPOSAL DETAILS. ....cescssscscsssestessosssscscasesesnesssesscssecsessseenseasearsresnseverosaserssnsnsnesacorae 7
LEGISLATION / OTHER GOVERNMENT INFORMATION ........sssessessscssorsessersrersoeneanes 8
3.1 State Government... csssesssssessecssecssosnensenssnesscssectescneesarsecseansensnsnaasaes 8
3.2 Local Government .......ccsescssserssstserccessennesesenscetscesecescccenseenseeseeeeneeensseettes 9
REHABILITATION PLAN... ae
4.1 Plan SUMMALY. 0... ceccscceeressesseeeeeesseesescseseneesevesesessnereeteesersesrenssoaseasone 10
4.2 Project Timing............ 1
4.3 Rehabilitation strategy ..............cc0. 12
4.4 Maintenance Schedule/Requirements......... 12
4.5 Project Monitoring and Performance Criteria 14
PROPOSED ENVIRONMENTAL OFFSETS.......... soesteesseneeaeseseaceeensesenensaeessessenanenseonea 15
CONCLUSIONG..............
RECOMMENDATIONS
LIMITATIONS OF THIS REPORT..............-.:ssssscsssssorsssessssesecvsnserssseesnecneeresstasseaneeveees 17
CLOSURE.......csscscsssssssenssscesssssrseesssnsacsuseanoneneasssnvenseesoseeussessesousosensosesnessserseneasensssersenroes 17
RECEiven
285 May 2ny7
RO05¢ sen
PROT. House fe
AD07631REHAB
May 2007
SHijs
Page 5
APPENDIX A APPENDIX B APPENDIX C APPENDIX D -5- APPENDICES Figures and Drawings Figure 1.0 — Locality Figure 2.0 - Aerial Landgraphics Drawing LA01, Issue C, Sheet 01 af 05 Drawing No. DE07631/02 Sheet 1 of 2 Drawing No. DE07631/03 Sheet 2 of 2 Site Photos Plant Schedule Rehabilitation and Weed Management Procedures AD07631REHAB May 2007 SHijs
Page 6
1.0 INTRODUCTION 1.1 Preamble Duke Environmental was commissioned by Robert James Sherrard & GFT (TEE) Pty Ltd to undertake this Weed Management and Vegetation Rehabilitation Plan. The report has been compiled generally in accordance with the Land Protection (Pest Route Management) Act (2002), the Fisheries Act (1994), Planning Scheme Policy (PSP) 18 (Ecological Assessment Guidelines) and PSP 3 (Landscaping Plants and Guidelines) of the Noosa Plan (2006). The Vegetation Rehabilitation Plan addresses revegetation strategies and weed Management procedures for degraded areas identified in the Duke Environmental Ecological Assessment Report (EAR) (Ref: ACO7631ECO) dated May 2007, and provides advice in regards to local authority legisiation and planning guidelines. This report should be read in conjunction with the EAR (Ref: AC07631ECO) dated May 2007. 1.2 Aims and Objectives The aims of this document are to: 1. Provide procedures and management guidelines with the intent of rehabilitating degraded areas within the subject site; 2. Provide a framework for compliance with regard to relevant State and Local Legislation and Planning Guidelines; Specific objectives of the document include the following: » To provide detailed methodology for the rehabilitation of river bank vegetation and rehabilitation works including plant schedule details, performance and monitoring requirements, corrective actions, timeframes, responsible persons and maintenance schedule/bond details; e To provide procedures detailing the management of exotic/invasive weed species; . ¢ To provide methodology to allow environmental safeguards to be carried out correctly; and ¢ Tomanage site activities effectively. ADO7631REHAB May 2007 SH/is
Page 7
1.3. Site Location The site is located at Makepeace Island, Noosa North Shore, approximately 40m offshore within the Noosa River, and is described as Lot 55 on MCH 1667. Refer Locality Pian (Figure 1.0) and Aerial Photograph (Figure 2.0) included in Appendix A. . The location of the rehabilitation works will address the majority of the degraded areas identified in Duke Environmental Ecological Assessment Report (Ref: AC07631ECO) and additionally include areas outside the proposed building works as identified within this report. Rehabilitation works are non-inclusive of proposed landscaping associated with the development. Refer Landscape Architectural Details by Landgraphics (Drawing LA01, Issue C, Sheet 01 of 05). Refer Drawing DE07631/02 Sheet 1 of 2 and Drawing No. LA01, Issue C, Sheet 01 of 05 included in Appendix A. 1.4 Site Characteristics The site is generally flat with some minor relief, grading towards areas of lower topography within the site. Signs of previous flooding in the lower lying areas were observed during assessment. Vegetation on the site can be generally described as a mosaic of grasslands, mangroves, woodland and landscaping, ranging from disturbed to relatively pristine in nature, Refer Section 4.3 of Duke Environmental (DE) Ecological Assessment Report (Ref: ACO7631ECO) for vegetation community descriptions. The site currently contains one (1) residential dwelling with associated facilities including a separate boathouse and barge/boat landing docks. Also observed was an additional unused dwelling raised on temporary supports. We understand this dwelling to be part of the original house existing on the site. Disturbed areas on the site appeared to be generally associated with the dwellings and consisted of small clearings and vehicular tracks. Some areas of regrowth vegetation were also observed as being degraded with significant invasion of declared and environmental weeds. The area of the subject site is approximately 9.3ha; however, the focus study area is approximately Sha in size. Desktop analysis of published geology maps for the site indicates soil types/geology as Estuarine channels and banks: sandy mud, muddy sand and minor gravel. Refer DE Ecological Assessment Report (Ref: ACO7631ECO) Aerial Photograph (Figure 2.0) in Appendix A and Site Photographs in Appendix B in this report for further details. 2.0 PROPOSAL DETAILS The proposal consists of a development application (dwelling house) for material change of use of premises. We understand that the application is to be assessed under the superseded Planning Scheme. For further details regarding the implications of the Planning Scheme changes refer to Ken Hicks Town Planning Report (Ref: 070137T, dated February 2007). Details for the proposed development can be seen on Drawing No. LAO1, Issue C, Sheet 01 of 05 included in Appendix A. AD07631REHAB May 2007 SHfjs
Page 8
3.0 LEGISLATION / OTHER GOVERNMENT INFORMATION 3.1 State Government 3.1.1 Land Protection (Pest and Stock Route Management) Act 2002 Under the Land Protection (Pest and Stock Route Management) Act 2002, a list of declared species has been targeted for control due to their potential negative impacts. The species have been designated under three (3) classes, each possessing differing management obligations. Where a relevant species has been identified on a parcel of land, the land holder is legally obliged to control the declared plant in the following manner: Class 1 pests — Landowner must take reasonable steps to keep the land free of Class 1 pests. Class 2 pests — Landowner must take reasonable steps to keep land free of Class 2 pests. Class 3 pests — Landowners are not required to control Class 3 pests unless the land is adjacent an environmentally sensitive area. Ecological Assessment of the subject site (Refer ACO7631ECO) has identified the following declared plants within the study area: Bryophylium sp. (Mother of Millions) - Class 2 pest. Baccharis halimifolia (Groundsel Bush) — Class 2 pest. Asparagus aethiopicus (Asparagus Fern) — Class 3 pest. Lantana camara (Lantana) — Class 3 pest. Sphagneticola trilobata (Singapore Daisy) — Class 3 pest. 3.1.2 Fisheries Act 1994 Under the Fisheries Act 1894 the subject site is located within a Fish Habitat Area (FHA) and as such all marine plants (alive or dead) are protected. Vegetation or communities relevant to this legislation and identified in the Ecological Assessment Report (Ref: DE07631ECO dated May 2007) include: Sporobolus virginicus closed grassland Closed mangrove forest Casuarina glauca/Melaleuca quinquenervia open forest Regrowth vegetation with Eucalypt spp. emergents. Landscaped areas with scattered Eucalypts. Any interference to the communities (or native vegetation) associated with the proposal will require a Permit to Damage Vegetation under the Act. For further details refer to Duke Environmental Ecological Assessment Report (DE07631ECO) dated May 2007. Additionally, rehabilitation and weed management is to generally conform to provisions provided under the following Fisheries Guidelines documentation: « Fisheries Guidelines Ref: FHGO03 (2000) (Fish Habitat Buffer Zones) AD07631REHAB May 2007 SHijs
Page 9
-9-
e Fish Habitat Area Code of Practice Ref: FHACoPO1({2005) (The
Lawful Use of Physical, Pesticide and Biological Controls in a
Declared Fish Habitat Area).
¢ Fish Habitat Management Operational Policy Ref: FHMOP001 (2002)
(Management and Protection of Marine Plants).
3.2 Local Government
3.2.1 Local Authority Planning Scheme (Superseded)
The site is designated as a “Rural Preservation Zone” under the superseded
Planning Scheme.
Under the superseded Strategic Designation the site is located within the Noosa
North Shore/Cooloola locality and is also designated as “Open Space —
Conservation and Waterway protection” area. We understand that under the
superseded planning scheme the development of a “dwelling house” is a
consistent and as of right use in the Rural Preservation Zone
Refer Appendix E of Report ACO7631ECO for Local Authority Information.
3.2.2 Local Authority Zoning Issues
The site is subject to the following assessment processes under the superseded
Planning Scheme;
Table of Zones — Rural Preservation
Specifically, the site is designated “Rural Preservation”. As such, we understand
development of a “dwelling house” within the site is self assessable under Table
2.4 (Table of Zones).
3.2.3 Planning Scheme Policy 03 (Landscaping Plants and Guidelines)
Under PSP03 of the Noosa Plan, Section 9.0 lists undesirable plant species
that are not acceptable for inclusion in landscaping and are to be removed
where possible. The following species listed in PSPO03 have been observed
on the subject site (Refer Duke Environmental Report NO. ACO7631ECO for
details):
Asparagus aethiopicus (Asparagus fern — highly invasive)
Jacaranda mimisifolia (Jacaranda)
Sanservieria trifasciata (Mother in Laws Tongue)
Schefflera actinophylla (Umbrella Tree)
Sphagneticola trilobata (Singapore Daisy ~ highly invasive)
Passiflora sp. (Passionfruit Vine) ~
3.2.4 Biodiversity Overlay Code
As detailed in the Noosa Council Information Request (Ref: 2007/445) the
proposal is to conform to the specific outcomes of Division 4 (Biodiversity Overlay
Code) of the current Noosa Plan. Refer to Appendix F (in Duke Environmental
Ecological Assessment Report Ref: ACO07631ECO) for a detailed response to the
Code.
A0D07631REHAB
May 2007
SHfjs
Page 10
4.0 -10- REHABILITATION PLAN 4.1 Plan Summary This rehabilitation plan is required to rehabilitate areas on the subject site identified as degraded in Duke Environmental Ecological Assessment Report (AC07631ECO). Areas of degradation were generally observed as being infested with a variety of non-native species including several declared species as listed under the Land Protection (Pest and Stock Route Management) Act 2002. Refer to Appendix G in Duke Environmental Ecological Assessment Report (AC07631ECO) for detailed species lists. A summary of the rehabilitation plan for zones 1-4 (as identified on Drawing DE07631/02 Sheet 01 of 02 included in Appendix A) is below. 4.1.1 Zone 1- Weed Control and Natural Recrultment Areas designated as Zone 1 were observed as generally possessing significant canopy cover of native species combined with some invasive species and understorey invaded with weedy/exotic species (in some cases significantly). For detailed vegetation community descriptions refer to Duke Environmental Ecological Assessment Report (Ref: ACO7631ECO). Management of these areas is to consist of thorough removal of invasive and exotic species with particular focus on the species listed in Sections 3.1.1 and 3.2.3. Refer to Appendix D for weed control procedures. After clearance of all invasive species, rehabilitation will rely on on-going maintenance of the areas and natural recruitment of native species from in- situ seed stock. We expect that by relying on natural regeneration, an appropriate suite of species associated with several stratum will develop. 4.1.2 Zone 2—Weed Control and Supplementary River Bank Planting Areas designated as Zone 2 were generally analogous to the eastern riparian zone of the Noosa River, Vegetation adjoining the watercourse was observed as degraded with patches of invasive species (Singapore Daisy in particular) holding bank integrity stable. The banks were observed to also contain many native trees and mangroves, acting to support the riparian zone (Refer Duke Environmental Ecological Assessment Report (Ref: ACO7631ECQ) for detailed descriptions). In accordance with FHMOP 001 (2002) no interference with these riparian species is to occur. Management of this zone will incorporate weed control and additional plantings to supplement existing native species. Invasive species supporting bank integrity are to be removed but additional bank support may be required during the initial establishment of planted tube stock (eg. Jute matting with intensive planting). Species to supplement existing vegetation and create a buffer zone of at least 5m width (in general accordance with FHG003 — Fish Habitat Buffer Zones) include those observed in intact vegetation on-site incorporating trees (at 2m x 3m centres) and ground covers (1m centres). Refer to Appendix C (Plant Schedule) for details. AD07631REHAB May 2007 SHijs
Page 11
-11- The estimated number of plants (trees and ground covers) required for rehabilitation in this area is approximately 3630, assuming no native vegetation present. The actual number of species needed will be dependant on native species coverage. Weed Gunnel mutchmats are to be used to prevent weed establishment around planted tree species. "Refer Drawing No. DE07631/03, sheet 02 of 02 in Appendix A for Rehabilitation Plan details, Appendix C (Plant Schedule) and Appendix D (Rehabilitation and Weed Management Procedures) for details. 4.1.3 Zone 3—No Rehabilitation Zone 3 was observed as areas proposed for landscaping works associated with the development. As such, no rehabilitation or weed control methods are proposed in this report. However, landscaping works (developed by others) are to pay due attention to PSP03 (Landscaping Plants and Guidelines) of the Noosa Plan. 4.1.4 Zone 4- Weed Control and Disturbance Plantings Zone 4 areas were observed as consisting of generally pristine grasslands and mangrove forests (Refer Duke Environmental Ecological Assessment Report for detailed vegetation descriptions). However, a disturbed vehicular track was noted in the grassland to the east of Zone 4 (Refer Drawing DE07631/02, sheet 1 of 2 for track location). The proposed development intends to incorporate a boardwalk along this disturbance; therefore rehabilitation of the site (Post construction) will be required. Additionally, under the Fisheries Act (1994), any interference with native marine vegetation associated with the development may require a permit to damage vegetation from the Department of Primary Industries and Fisheries. A dense planting of appropriate ground-cover species will be utilised in conjunction with weed removal and on-going maintenance to rehabilitate the pathway. Weed Gunnel mulch mats are proposed to prevent weed establishment and facilitate maintenance around planted species. The area of the proposed boardwalk is approximately 183m?, therefore an estimated 732 seedlings will be required to provide a density similar to that of the grassland present. Additionally, the entirety of Zone 4 is to be monitored for the development of any invasive species that may germinate in response to disturbance from the proposal. Where non-desirable species are observed, removal according to the procedures in Appendix E is required. Refer Drawing No. DE07631/02 and DE07631/03 in Appendix A, Plant Schedule in Appendix C and Rehabilitation and Weed Management Procedures in Appendix D for details. Project Timing Rehabilitation will be undertaken in one (1) stage. Stage 1: Complete weed management and revegetation works within the subject site. AD07631REHAB May 2007 SHijs
Page 12
-12- 4.3 Rehabilitation strategy Rehabilitation is to be undertaken in general accordance with Section 4.0, Drawing DE07631/02 (in Appendix A) and with regard to relevant local legislation guidelines. Refer Section 3.0 — Legislation/Other Government Information. Refer to Drawing LA01, Issue C, Sheet 01 of 05 for Preliminary Landscape Plan, Drawings DE07631/02, Sheet 01 of 02 and DEO7631/03, sheet 02 of 02 for Rehabilitation and Weed Management Plans included in Appendix A; Appendix C for Plant Schedule; and Appendix D for details of procedures regarding rehabilitation strategy and weed management. 4.4 Maintenance Schedule/Requirements To assist successful revegetation, maintenance is to be on-going during the plant establishment period (minimum of 2years) with the first year being critical. Seedlings are to be kept weed free (to minimise competition for sunlight and nutrients) and a thick muich layer is to be retained around seedlings at all times. The following requirements and corrective actions are to be implemented after all declared and environmental weeds have been removed and all replanting and rehabilitation works have been finalised. ‘AD07631REHAB May 2007 SHijs
Page 13
-13- Requirement Year One Monthly maintenance for the first 6 months reduced to every 2 months for the second six month period. Eradication and control of all environmental and declared weeds. Mulch cover as applied at planting stage. >90% seedling survival. Revegetation to be well established with heights, density and diversity similar to that of naturally occurring areas of similar vegetation at a similar age. Year Three Maintenance to be performed at a minimum of 3 monthly periods. Clearance of ail declared and environmental weeds. Rehabilitation Plantings are to resemble a naturally structured ecosystem of a similar age; plant height and foliage cover are comparable to similar vegetation communities in the area (of similar age) with no less than 80% of naturally occurring foliage cover and height. Corrective Action/Comment N/A Remove all environmental and declared weeds, treat stumps and regrowth. Remulch to original depth. Replant species as required. Replant species as required, increase water to seedlings and ensure mulch cover. N/A Additional weed removal and alternative weed removal methods. Additional planting of advanced tree " stock with additional watering regime in order to achieve 80% foliage cover and height. Apply slow release organic fertiliser to existing and additional tree stock where necessary. AD07631REHAB May 2007 SHijs
Page 14
-14- 4.5 Project Monitoring and Performance Criteria The success of the Vegetation Rehabilitation Plan will be determined by compliance with performance criteria defined below. Under the principles of due-diligence for self-assessable development; we consider it prudent to undertake project monitoring based on assessment of performance criteria at regular intervals. Performance: Criteria are based on recognised vegetation rehabilitation principles, and on mimicking structural and floristic parameters of similar naturat vegetation communities in the area. The maintenance period will commence after all declared and environmental weeds have been removed and all replanting and rehabilitation works have been finalised. The monitoring of rehabilitation progress will be undertaken at regular intervals (12 and 24 month basis) commencing from the initiation of the maintenance period. Required variables for the monitoring program are to reflect the objectives described for Performance Criteria including: e Level of declared and environmental weed recovery; e Density and diversity of planted species (level of senescence); and « Growth rate of planted species (Height and Foliage Cover). Detailed Performance Criteria milestones are to be assessed periodically by a suitably qualified consultant. Where performance criteria are assessed as insufficient, corrective actions (refer to Section 4.4 - Maintenance Schedule/Requirements for details) are to be undertaken. Performance Criteria milestones are as follows: a) Upon Completion of initial plantings b) “On Maintenance’ inspection. e® The maintenance period has been in progress for no less than 1 year; Control of environmental and declared weeds; e Cleared and degraded areas have been planted with appropriate native species at densities comparable to those at “As Planted” levels and/or levels in similar natural vegetation communities (>90% survival of seedlings); . e¢ Revegetation is well established with planted tree species at heights of no less than 1m and with supplementary planting to be undertaken to replace losses; ¢ Species diversity levels are comparable with “As Planted” levels and/or levels in similar/surrounding natural vegetation communities. c) “Off Maintenance” inspection e The maintenance period has been in progress for no less than 2 years; e Rehabilitation resembles a naturally structured ecosystem — plant height and foliage cover are generally comparable to similar vegetation communities of similar age in the area (no less than 80% of naturally occurring foliage cover and height). Species AD07631REHAB May 2007 SHijs
Page 15
-15- diversity levels are comparable to “As Planted” levels and to similar vegetation communities in the area; and e Control (to suitable standard) of declared and environmental weeds. Compliance with the above Performance Criteria is to be assessed by a suitably qualified consultant. 5.0 PROPOSED ENVIRONMENTAL OFFSETS In our opinion, we consider details included in Table 5.1 below to qualitatively provide details of proposed environmental offsets. Table 5.1 Proposed Environmental Offsets Environmental Neutralities/Gains Environmental Losses Proposed development restricted to areas of disturbance Development to be limited to an area of Sha within the 9.3ha total site area. Development will afford protection to areas of undisturbed forest, marine plants, vegetation and potential habitat areas during the construction and operational phases of the development. Loss of approximately 59 mature trees of Diameter Breast Height (DB) between 300mm and 1000mm - (Refer to Drawing DEQ7631/01 for details). Reduced vegetative buffer between the proposed development and waterway/wetland areas. Potential reduction of mature habitat area for use by local fauna species. e Development area is to also provide control of invasive and declared weed species. e Potential increase in biodiversity value through contro! of invasive species Development area to be rehabilitated including existing degraded vegetation communities with appropriate species. e Rehabilitation will supplement existing native species populations on the site. « Rehabilitation plans will potentially result in greater stabilization of beach areas through supplemental bank area plantings (Mangroves). . e Upgrading of existing on-site sewerage treatment and effluent disposal syste. e Improved water conservation management through effective re-use of non-potable water. ¢ Effective non-worsening of flood impacts to neighbouring properties. ADO7631REHAB May 2007 SH/js
Page 16
-16- In general, we consider site rehabilitation and weed management to provide benefits (including those described above) that potentially outweigh the loss of existing mature trees resulting from the proposed development. Details of the number of trees proposed for removal and their estimated Diameter Breast Height (DBH) are detailed in Table 5.2 below: Table 5.2 TREES FOR PROPOSED REMOVAL NUMBER OF TREES APPROXIMATE DIAMETER BREAST PROPOSED HEIGHT (DBH) RANGE (mm) 18 800-1000 31 500-800 410 300-500 Based on the Table 5.1 and 5.2, and in our opinion, we consider the proposal to provide net environmental gains above and beyond the existing situation. 6.0 CONCLUSIONS In order to comply with the requirements of the Fisheries Act 1994, PSP03 (Landscaping Plants and Guidelines) and Division 4 (Biodiversity Overlay Code) of the Noosa Plan, the methods detailed within this plan are to be adhered to as a minimum. Notwithstanding that the proposal is to be undertaken under the superseded planning scheme, we have undertake a review of the requirements of the Biodiversity Overlay Code (Division 4 of the Noosa Plan). A detailed response to specific outcomes contained therein can be found in Duke Environmental Ecological Assessment Report (Ref: AC07631ECO). Additionally, we believe weed management and rehabilitation procedures contained within this report to be of sufficient extent/detail to satisfy requirements of the Land Protection (Pest and Stock Route Management) Act 2002. 7.0 RECOMMENDATIONS Overall it is recommended that the rehabilitation of on-site vegetation be subject to the following: ¢ The methods for rehabilitation contained within are adhered to as a minimum standard of performance in order to generally comply with requirements contained within the Fisheries Act 1994, PSP18 and PSP3 and Biodiversity Overlay Code (Division 4) of the Noosa Plan and the Land Protection (Pest and Stock Route Management) Act 2002. AD07631REHAB May 2007 SHijs
Page 17
-17- 8.0 LIMITATIONS OF THIS REPORT This Vegetation Rehabilitation Plan has been tailored to report on issues in the.aréa of interest being Lot 55 on MCH 1667, Makepeace Island, Noosa North Shore. The information in this report is not to be. used outside of the subject area. We consider that this Plan accurately considers conditions at the area of interest at the time the plan was developed, and based on information supplied to us by second and third parties. This rehabilitation plan is to be reviewed, if site conditions change inthe future. This Weed Management and Vegetation Rehabilitation Plan has: been undertaken for the ‘specific purposes of Robert James Sherrard & GFT (TEE) Pty Ltd, as detailed in our correspondence to them, and is ‘solely for the use of Robert James Sherrard & GFT (TEE) Pty Ltd. This Weed Management and Vegetation Rehabilitation Plan should only be used in full, and may-not be used to support objéctives other than those sét out herein, except:where written approval, with comments, are provided by Duke Environmental. Duke Environmental accept no liability with respect to the accuracy of information supplied by second and third parties. 9.0 CLOSURE Should further information be réquired, please. contact: Stephen Hayes Paula Duke BSc(Env)Hons MEngSc BAppSc(Chem) PGDipEd CEnvP MEIANZ Environmental Scientist / Ecologist Principal Environmentai Scientist For Duke Environmental For Duke Environmental 2006 ADO7631REHAB May 2007 SHijs
Page 18
-18- 10.0 REFERENCES 1. Environmental Protection Agency / National Parks and Wildlife Service, 2006. Regional Ecosystems Database. http:/www.epa.qid.gov.au/nature_conservation/biodiversity/r “Queensland Government, Brisbane. . 2. Noosa Council, 2000. The Noosa Plan. Noosa Council. ionalecosystems/. AD07631REHAB May 2007 SHijs
Page 19
DOCUMENT STATUS a ROBERT JAMES SHERRARD & GFT (TEE) PTY LTD FOR APPROVAL ro som mu D uké _ PROPOSED RESIDENTIAL DEVELOPMENT Not for Construction) - —— LOT 55 ON MCH1667 [en ss | Environmental "MAKEPEACE ISLAND, NOOSA NORTH SHORE | : as DEO7631/02 nS PAS COPA PTE momar Tris __ WEED MANAGEMENT/REHABILITATION PLAN
Page 20
‘Sitn Management
Weed Contd Mathods
Regeneration and Revegetation Gitde
Tering and Watering Needs
Maintenance Schade
Acsitiona) Hotes
SITE MANAGEMENT
PuaeNs
akered in any form.
tastion,
noxious and emdronmental weeds tor
Bacchais haim¥oia
Sanservia. riiasciata
Asparagus sathioprus
Sphagneticoss tibbate
Scheftera acthopryts
Lontans camera
palnl methods are suggested).
‘weed seed Setting.
council refuse faciity.
ameter of 500cm for planting and
For speciic weed treatment techniques reter to Queensiand Dapariment of Naturaf Resources and
govaupestst
Mines ~ Post Facts. nig ery 17m. a
3. REGENERATION AND REVEGETATION GUIDE
Naturally occuring revegetation is to be retained and promoted in conjunction with planted species.
‘Species tobe ptanted shoutd be consistent wah thet of RE 12.1.1, 12.1.2, 52.1.3 and ather endemic
native species located on the subject site. Refer to Species List.
Tube stock shoudt be sun-hardened prior to sevegetalion works and be of locally derived seed stock
Due te presimly of er and wetland, orgie fiers are tobe used us per manufrs
Procadures fr planking of tube stock shoud be conisten with hari best practices, For irther
Information on planting technique refer
Dit Mew rrw oft oy surfactiteet oper tey £31 oof
Praring densites and fayout, shail atempt tomimic a naturally occurting ecosystem, therefore straight
fines and patterns shoud be aveided. Refer to Planting Guide inset.
WEED MANAGEMENT AND REHABILITATION PLAN
Existing native vegetation Gnduding tha extent of dip Gnes) within the Rehabiitation area shal net be
Oebris remaining from previous land use sctivties shal be removed and disposed of in an appropriate
2. WEED IDENTIFICATION AND CONTROL
A suitably qualified person shail be present ta inspect the Rehsbilltation area toidentty and mark
appropriate tr
‘Special attention ls required for the detection of dactared plants 2s listed under tha Lends Protection
(Pest and Stock Routs Management Act 2002 (QLO).
Panicular focus wil be applied to the fofiaang dectared and environmental weeds:
Infiel weed central shall be completed befare revegetation plantings commence.
Manual /mechanical removal of woody species is the preferred method however; larger species may
require chemical means of removal (e.g. 0 end peint, stem injection).
species lobe removed / lreated must be done so wilhau! causing damage to existing native
vegetation, if this is not possible the plant shell be treated via sien Injection and letio de in-situ,
Extrem caution is to be taken to ensure herbicides do nct ender waterway (manual removal or cut and
Brushculting shall be used to contral herbaceous weed species dusing establishment to prevent further
Alt nadous and enisonmental weed seed shall be removed of site and disposed of at an appropiate
Exatic grasses and herbaceous weed species are subtect to ongoing stashing / brushasting regime to
pravent seed setting whilst maintaining groundcaver to prevent erosion.
‘Woody weeds species shail be removed mechznicaly / manually if possible with minimal sad disruption.
‘Where this ts net possitte, Ihe woody weed shall be Wealed via cut and peint methods (Bradley
Centers fer tree plantings ara to be treated wiih appropriate herbicide to produce a minimum circle
4. TIMING AND WATERING NEEDS
Toincrease the success of planlings, revegetation should be carted out during ina wetter / warmer
months of year.
In the absence of substentisi reintell events, new plantings shail be walered @ minimum of thres times
during the frat week cf plarting, two times the second week, once in the thisd week end as necessary
(seeding performance to be monitored) for the duration of this rehabitation pian {j.<. until off
maintenance period commences).
MAINTENANCE SCHEDULE
2
To assist successfid revegelation, mainlenance istobe an-gaing dying the plant establishment peniog
{rrinamum 3 years) with the frst year being critical. Seediings are to bs kept weed fee (tominimize
‘competion for mazients and suniight) and s thick mutch layer is tobe retained around all seedings.
Perfarmanca Criterta
Year’
- Monthty maintenance tor the frst 6 months
reduced Lo every 2months lor the second 6
months
Egadication and contra of all environmental
‘and cedered weeds
- Mulch cover as eppied of planting stage
+ 290% seeding sunival
- Revegetation is weil estahilsned with neighis
densty and dversity smas lo that of naturaby
‘occurring areas of similar vegetation
Year 2
Maintenance every 3 months (min.
- Bracdcaidon and contret of all enviromental
and dedared weedt
Sich coves 2s apd staring sage
280% seeding sunivel
Revegetation is wal estabished with heights
densiy and diversity cimdar to that of naturaty
cecuntng erees ef simizr vegetation
Yoar3
+ Maintenance every 3 months (min).
+ Cleayance of afl deciered and environmental
wonds.
Rehabilt aon plantings resembie a naturaly
structured ecosystem ofa similyy age, plant
teighl and foliage cover ae carparable
to simfae vegetation comuTemiies in the area
(ci siniiar 2g) with no less than 80% of
naluraby occurring fllage cover and height.
3X ADDITIONAL NOTES
Corrective Actlon/ Comments
- WA
+ Remove al environmental and
declared weeds, treet stumps enc
regrowth
Rarraich to original depth
+ Replant species as requred
~ Replact species es requred,
increase water lo seedings and
exsure much cover,
“Species to be ptented should be sourced from local landcare groups where posse.
lean weed free mitch tobe utilised for exposed exeas and revegeisiion seedings.
Nol af species fisted may be avaitable ef tims of planting. howaver @ is essential a wide dversly of
Species are utilised (75% of Isies scecies}
DOCUMENT STATUS
FOR APPROVAL
(Not for Construction}
Bosnsa
PO Box 78 Wurhia 4575,
Pome Oud Cia Py ist
Tia Duke Erewonmerial
sakes a3
Boones DUKE
Environméntal
Emsecamerie & Engneencg tenagemet Corsstaras
TSS LAK S COPUAGHT AODTECTED OY
REVEGETATION SPEGES UST
Bank plantings and Grassland Species:
BOTANICAL MAME ‘SOMO NAM
Abcewmbetorubu’ — Fired Ste Ook
Aphtoes exeise™ Ragas
Bugieagmorktes — Onsgalangrove
Contes pace” Swamy She Oak
Mpperts Gombe Cost Boobals
Razopbore aybeat Rea kiangrove
+4 Species to seas ontyan rw bars
“= Typical plonwsarig species 1o doxaate in revegetion
Groundcovers
Seaeecconpens Gautam”
2 on
oabe She Fine ity
Ieppeata cy Par et Gixy Geass
Locoescte bogtode. Spkryeed tt
Lomende mutton Leary Fiomered tad Rush
anstrads Coupe Reed
Souccisvipuce’ — Sadearh
Zeyh oman PretyCouch
* = Typical spectes to carthete br reagetition
ZONE 2 PLANTING GLUDE
y | row
Es
ae
1 Ss too eee ne sae 7 ers? pneu jum 3 cra
: At fgpec | gua bore faa mated Ra acs as SD NAY
rane regan a where cane DECI
Fisary x ngaceeeay 5 eaorg?
peed raneung ape ee conncecny.
. Hacngemat ae vaca carer matinee,
Pens PO Macy ed PERS eee ESE
OE EN ARONENTAL
soaaae j
SEVITTTAT
Iaans
ee Five
Exim omar Ste ea seer mane, Raarpciaee stabs
roomy oe
cus: ROBERT JAMES SHERRARD & GFT (TEE} PTY LTO
pacvect: PROPOSED RESIDENTIAL DEVELOPMENT
LOT 55 ON MCH1667
.__ MAKEPEACE ISLAND, NOOSA NORTH SHORE.
me _WEED MANAGEMENT/REHABILITATION PLAN 0E07691/03
PPB AO NRHN
Bee
1.
Petes patel x xoe eye he
a OAKY HHO TORS wee AOE
Page 21
APPENDIX | B SITE PHOTOGRAPHS ADO07631REHAB 2007
Page 22
P1. View to the west of Zone 4. Note relatively pristine nature and lack of invasive species. P2. Zone 4 Baccharis halimifolia invasion. AD07631REHAB Page 1 of 6 May 2007 SHijs
Page 23
P3. Proposed area for boardwalk looking north (Zone 4). Rehabilitation of the grassland is to follow construction. P4. Class 2 declared pest Baccharis halimifolia in flower within Zone 1. AD07631REHAB Page 2 of 6 May 2007 SH/js
Page 24
P6. View of Zone 1. Note Baccharis halimifolia (Groundsel Bush) in the understorey. AD07631REHAB Page 3 of 6 May 2007 SHijs
Page 25
P8. Bank condition on the eastern side of the island. Note undercutting of the bank. AD07631REHAB Page 4 of 6 May 2007 SH/js
Page 26
APPENDIX C PLANT SCHEDULE AD07631R May 2007 SH/is EHAB
Page 27
Supplementary Bank Plantings and Grassland Restoration Species
Plant species Common Name GIF Dist._|_ Size at planting Zon
Allocasuarina torrulosa* Forest She Oak T c 2" tubestock 2
Alphitonia excelsa* Red Ash T Cc 2” tubestock 2
Bruguiera gymnorhiza+ Orange Mangrove T oO 2" tubestock 2
Casuarina glauca* Swamp She Oak T c 2" tubestock 2
Myoporim acuminatum Coastal Boobelia $ c 2” tubestock 2
Rhizophora stylosat+ Red Mangrove T O 2" tubestock 2
+= Species to occur only on river banks
* = Typical pioneering species to dominate in revagetation
Plant species
Acrostichum speciosum
Dianella caerulea
Common Name
Understorey Species
"GIF
Fem
Gristle Fern
Blue Flax
“ Commi
Ne
2 ‘
“ESTIMATED. TOTAL:OF TR
i revegetation, .
O - Occasional, h lofrequent
Si
a
zt
¥
Dist.
at
Zone
2" tubestock
2
o
2 TO BE PLANTED = 4002 trees
“(assuming ho.native vegetation present)
Tree, ST - Short Tree, SH - Shrub, F — Fem, H — Herb or Grass.
A007631REHAB
May 2007
SHjs
Page + of 1
Page 28
APPENDIX D REHABILITATION AND WEED MANAGEMENT PROCEDURES 4007631REHAB May 2007 SH/is
Page 29
Duke”
Environmental
Environmental Management Consullants
ELEMENT: ENVIRONMENTAL PROCEDURE EP012 REVEGETATION
1.
Objective
To revegetate degraded vegetation to maintain or improve water quality
and biodiversity within the Noosa River catchment.
To provide additional buffer capacity in degraded bank areas to protect
and enhance environmental values and ecosystem services.
To revegetate land previously cleared for fural pursuits.
To increase the site potefttial for habitat-and corridor linkages for flora
and fauna.
To increase the sites visual amenity.
Management Strategies
and Actions
ECENED
A consultant / contractor practiced in revegetation techniques for
degraded areas and with the use of local native plants.is to supervise the
required works for the site.
The selection of species planted on the site is to be based on vegetation
types present on the subject site. Appendix D lists suitable native
species. Where possible seedlings shall be sourced from local landcare
groups using locally collected, endemic seed stocks.
No exotic species and / or potential weed species should be planted.
Chemical fertilisers should not be used due to the proximity of waterways
and wetlands. As a substitute, slow-release organic fertilizers can be
applied as per manufacturers specifications ensuring excess material is
not washed off by stormwater runoff and discharged to wetlands and
waterways.
Revegetation works should aim to mimic natural vegetation, so planting in
rows or other obvious patterns should be avoided.
Planted species will require water at time of planting then on an as
needed basis. On average, planted species will require water every day
for the first weék and every second day in the following week, in the
absence of rain. This schedule varies with seasons, soil types, mulch
(quantity and type used), proximity to other tree species and proximity to
water.
The use of “Weed-Gunnell” mulch mats will reduce weed encroachment,
until ground covers and shrubs are established.
The weed control strategies and revegetation phase should be
5 MAY 2007. implemented consecutively.
\o 104 SA SHIRE COUNCIL Revegetation and rehabilitation strategies should be limited to weed
\ 4 dnoat COENTER /” contro} and enrichment planting where there is already an existing natural
2 regeneration occurring.
Pa
9 {| 3 Suggested planting densities do not take into account existing native
vegetation. Consequently we suggest final plant numbers to be
accurately calculated based on supplementa! needs.
AD07631REHAB Page 1 of 3
May 2007
SHfs
Page 30
Duke” Environmenial Environmental Management Consutlants ELEMENT: ENVIRONMENTAL PROCEDURE EP012 REVEGETATION Approximate areas and planting density Zone:2 -Supplementary rehabilitation planting 3302m? This zone is to consist of supplementary plantings to aid waterway protection and act as a mitigation measure to minimise any potential erosion. Revegetation plantings shal! extend approximately 5m (min) from the river top of bank. Planting for buffer areas are to be at the following minimum densities: e Trees: 2m centres e Shrubs: 2m centres ¢ Groundcovers: 1m centres Species appropriate to planting are listed in Appendix D. Zone 4- Grassland rehabilitation planting 183m? This zone is to consist of rehabilitation plantings to restore observed degraded areas of the intact native grassland. Revegetation plantings shall incorporate the.entirety of the degraded vehicular track (non- inclusive of proposed boardwalk). Plantings are to be at the following minimum densities: e Groundcovers: 0.75m centres Species appropriate to planting are listed in Appendix D. 3. Monitoring and Performance Indicators Monitoring will be undertaken on a 12 and 24 month basis by a suitably qualified consultant until the site is accepted off-maintenance to ensure that revegetation and rehabilitation has taken place in accordance with this Weed Management and Vegetation Rehabilitation Plan. The performance indicators will be the adequate revegetation and rehabilitation of the site in accordance with the objectives stated in “Section 4.5 — Project Monitoring and Performance Criteria”. 4. | Commencement‘and Timeframe Revegetation and Rehabilitation strategies should be implemented commensurate with weed removal and control strategies. The timeframe for the completion of the Revegetation and Rehabilitation element must comply with the Performance Criteria. The order of vegetation works is: 1.Stage One: Weed Management and Control followed as soon as practicable by rehabilitation plantings Where possible revegetation works shall be carried out during the warmer, wetter months of the year to provide suitable soil moisture conditions for seedling establishment. 5. | Responsible.Person / Organisation Revegetation implementation, monitoring, and reporting, and any necessary corrective actions are the responsibility of the Project Manager of the development. 6. | Reporting and Review Compliance reporting is the responsibility of the Project Manager. All incidents that create harm to flora or fauna are to be reported to a Council officer appointed for this purpose. Foltowing the designated monitoring schedule, the Environmental Consultant will inspect and confirm-satisfactory compliance of the works. AD07631REHAB. May 2007 SHjs Page 2 of. 3
Page 31
Duke’ Environmental Environmental Management Consuttants ELEMENT: ENVIRONMENTAL PROCEDURE EP012 REVEGETATION The Environmental Consultant will report compliance of works to the Project Manager. Where less than adequate Revegetation has occurred in an area the reason/s for non-compliance must be ascertained and corrective action faken. 7. | Corrective Action Methods should include: e Additional Revegetation and Rehabilitation; and « Alternative Revegetation and Rehabilitation weed removal techniques. Corrective action will be undertaken upon request from the Local Authority delegate. ADO763 REHAB May 2007 SHijs Page 3 of 3
Page 32
Se See i a nd COLO Bea | 1. Duke” Environmental Environmental Management Consultants Objective WEED REMOVAL & CONTROL To comply with : ; "= The Lands Protection (Pest and Stock Route Management) Act 2002 (Qid) = Agricultural Chemicals Distribution Control Licensing provisions and ‘code of practice, Department of Primary Industries. To contro! noxious, declared and environmental weeds within the subject site. To remove noxious, declared and environmental weeds within the subject site. To’ reduce and prevent further noxious afid environmental weed invasion within the revegetation and rehabilitation area. To allow natural succession of the bushland area to regenerate: To improve the visual amenity-of the area. Management Strategies and Actions A person suitably qualified in Native Vegetation Rehabilitation and weed contro! is to be present to identify and remove weeds. Manua!.(hand pulling) removal of weed species on stable land formations. if the preferable method. However, some weed species will require chemical methods of removal preferably via stem injection, chip frill or cut and paint methods. On steeper areas and river banks chemical methods are preferred to reduce potential soil disturbance and subsequent erosion. Under the Fisheries Act 1994, no motorised methods are to applied (i.e. brushcutters etc.). Larger species to be removed/treated must be done so without causing damage to existing native vegetation. Where this is not possible the plant should be treated via stem injection techniques and left to die in-situ. Extreme caution should be taken to ensure that herbicides do not enter the waterway, the cut and paint method has been suggested as this method is the least likely to enter the stream system. The weeds listed under the Lands Protection (Pest and Stock Route Management) Regulation 2003 (QLD) require immediate removal from the site. Weeds species should be targeted and removed prior to the seeding of the plant to prevent further distribution. Weed removal of each species will be conducted in a way that maximizes the potential for total removal of the plant and minimise potential regrowth. Where removal of listed species may endanger bank integrity, additional soil support may be required. Jute matting pinned closely to the soil surface and planted densely with ground covers is the suggested technique in this circumstance. The movement of vehicles will be restricted to prevent the further spread AD07631REHAB May 2007 SHfs Page 1 of 2
Page 33
Duke” Environmental Environmental Management Consultants. ELEMENT: ENVIRONMENTAL PROCEDURE EP014 WEED REMOVAL & CONTROL of weed invasion. Centres for tree planting are to be treated with appropriate herbicide to produce a minimum circle diameter of 500cm for planting and mulching. Areas of weed removal can be revegetated with species indigenous to the area, to shade out weéd species and prevent further outbreaks except where otherwise detailed in Section 4.0. Waste vegetation associated with removal of weed species is to be temoved from the site and disposed of at pre-determined waste facility. 3. Monitoring and Performance Indicators Monitoring. will be undertaken at 3 months, 6 months, and 12 months by suitably qualified person to ensure that weed removal has taken place and no further encroachment of weed species is observed. The Performance. Indicators will be the control and dectine of noxious and environmental weed species on the site in accordance with the objectives stated in “Section 4.5 of the Rehabilitation Plan ~ Project Monitoring and Performance Criteria”. A suitably qualified consultant will undertake weed control inspections at random intervals. The Performance Indicators will be the maintenance of all weed species to ensure that. weeds. do not displace or infest the natural bushland areas. 4. | Commencement and Timeframe Commencement of the Weed Control should be in accordance with, Section 4.5.— Project Monitoring and Performance. Criteria. Weed control Strategies should be implemented commensurate with rehabilitation strategies with initial weed control completed before rehabilitation plantings commence. The timeframe for the completion of the Weed control should comply with the Performance Criteria. 5. | Responsible Person / Organisation Weed removal implementation, monitoring of weed contral measures, and any necessary corrective action is the responsibility of the project manager of the development. After acceptance of the site off-maintenance, weed eradication is the responsibility of the applicant. 6. | Reporting and Review Monthly reporting to the project manager is the responsibility of the contractor conducting rehabilitation works. All incidents that have or could potentially harm flora or fauna are to be reported to a council officer appointed for this purpose. Following the designated monitoring schedule, a local authority delegate will inspect and confirm satisfactory compliance of works to the Project Manager. Where fess than adequate weed removal has occurred in an area the reason/s for non-compliance must be ascertained and corrective action taken. 7. | Corrective Action Methods should include: « Additional weed removal; and « Alternative weed removal techniques. Corrective action will be undertaken. upon request from the Local Authority delegate. AD07631tREHAS May 2007 SHfs Page 2 of 2
Used in these records
REFERENCED DOCUMENT - Weed Management & Vegetation Rehabilitation Plan - MCU13/0064Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.