Council archive · source document
REFERENCED DOCUMENT - Weed Management & Vegetation Rehabilitation Plan - MCU13/0064
Plans and drawings: the text below has words only, no drawings.
-12- 4.3 Rehabilitation strategy Rehabilitation is to be undertaken in general accordance with Section 4.0, Drawing DE07631/02 (in Appendix A) and with regard to relevant local legislation guidelines. Refer Section 3.0 — Legislation/Other Government Information. Refer to Drawing LA01, Issue C, Sheet 01 of 05 for Preliminary Landscape Plan, Drawings DE07631/02, Sheet 01 of 02 and DEO7631/03, sheet 02 of 02 for Rehabilitation and Weed Management Plans included in Appendix A; Appendix C for Plant Schedule; and Appendix D for details of procedures regarding rehabilitation strategy and weed management. 4.4 Maintenance Schedule/Requirements To assist successful revegetation, maintenance is to be on-going during the plant establishment period (minimum of 2years) with the first year being critical. Seedlings are to be kept weed free (to minimise competition for sunlight and nutrients) and a thick muich layer is to be retained around seedlings at all times. The following requirements and corrective actions are to be implemented after all declared and environmental weeds have been removed and all replanting and rehabilitation works have been finalised. ‘AD07631REHAB May 2007 SHijs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - Weed Management & Vegetation Rehabilitation Plan - MCU13/0064Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.